Whidbey Island Bank and Fisher & Sons, Inc. have entered into a construction contract for a bank building at 450 SW Bayshore Dr., Oak Harbor, WA. The contractor will complete the work for a maximum price of $2,029,400, which includes a contractor's fee of $145,000. The contract is based on cost of work plus a fee, with all savings under the guaranteed maximum price going to the owner. The project schedule and other terms are detailed in the contract documents, and the work is to begin on June 2, 2000.
EX-10.1 2 0002.txt BUILDING CONTRACT 1 ____________________________________________________________________________________________________________________________________ Standard Form of Agreement Between Owner and Contractor where the basis for payment is the COST OF THE WORK PLUS A FEE with a negotiated Guaranteed Maximum Price AIA Document A111 - 1997 1997 Edition - Electronic Format ____________________________________________________________________________________________________________________________________ This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. This document is not intended for use in competitive bidding. AIA Document ###-###-####, General Conditions of the Contract for Construction, is adopted in this document by reference. This document has been approved and endorsed by The Associated General Contractors of America. Copyright 1920,1925,1951,1958,1963,1967,1974,1978,1987,1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. ____________________________________________________________________________________________________________________________________ AGREEMENT made as of the 2nd day of June in the year 2000 (In words, indicate day, month and year) BETWEEN the Owner: WHIDBEY ISLAND BANK (Name, address and other information) P.O. BOX 990 OAK HARBOR, WA 98277 and the Contractor: FISHER & SONS, INC. (Name, address and other information) 625 FISHER LANE / PO BOX 534 BURLINGTON, WA 98233 The Project is: WHIDBEY ISLAND BANK (Name and location) 450 SW BAYSHORE DR. OAK HARBOR, WA The Architect is: FSI ARCHITECTS (Name, address and other information) 625 FISHER LANE / PO BOX 534 BURLINGTON, WA 98233 The Owner and Contractor agree as follows.
11 Contract Exhibit A - Scope of Work and Schedule of Values dated April 5, 2000 EXHIBIT A WHIDBEY ISLAND BANK - OAK HARBOR SCHEDULE OF VALUES / SCOPE OF WORK June 2, 2000 ARCHITECTURAL & ENGINEERING..............................................$79,500 o Architectural (current job) o Electrical Engineering o Structural Engineering o Printing o H. V. A. C. Design o Architectural & Engineering Support GENERAL CONDITIONS......................................................$127,780 o Supervision o Layout & Batterboards o Mobilization/Demobilization o Construction Facilities o Temporary Fencing o Temporary Power & phone o Temporary Water o Sanikan o As-Built Drawings o Quality Control & Testing o Daily & Final Cleaning o Dumpster o Misc. Construction Supplies o Survey & Civil Staking o Traffic Regulation/Barricade o De-watering Budget ($3,000) EQUIPMENT................................................................$46,450 o Laser Level o Scissors Lift o Manlifts o Boom Truck o Table Saw o Forklift o Roto Hammer & Bits o Scaffolding o Trash Pump o Generators o Misc. Equipment SITE WORK...............................................................$268,047 o Site Clearing & Grubbing o Site Fill & Grade o Basement Excavation o Underground Utilities o Storm Drainage, Roof Drains, Footing Drains o Sanitary Sewer o City Sidewalks o City Curb & Gutter o Utility Trenching o On-Site Paving o Erie Street Paving o Fire Water Service o Curbs, Gutters & Striping o Handicap Signage 12 CONCRETE................................................................$152,191 o Continuous Footings o Spread Footings o Foundation walls o Slab on Grade o Vault Slab o Elevator Pit and Sump o Concrete Finishing o Sidewalks o Drive-up Apron & Island o Dumpster & H. V. A. C. Slab o Sign Foundations o Concrete Pumping o Reinforcing Steel o Embedded plates, Anchor Bolts o Grout Vault Door o Lite & Flag Pole Foundations o Concrete Accessories STRUCTURAL STEEL.........................................................$59,123 o Columns o Wide Flange Beams o Field Welding o Bollards o Anchor bolts o Ornamental Railing o Guardrails CARPENTRY...............................................................$292,283 o Wall Framing & Sheathing o Blocking o Floor Joists o TJI's o GLB, Beams & Columns o Roof Trusses o Overfill Framing o Roof Framing & Sheathing o Soffits & Facia Framing o Attic Mechanical Room o Dumpster Enclosure FINISH TRIM & CASEWORK .................................................$116,854 o Window Trim (Oak) o Door Trim (Oak) o Wood Base (Oak) o Cabinets & Countertops o Newel Posts o Teller Line o Hand Rail o Ornamental Rail Cap o Lable Vents INSULATION/ROOFING......................................................$138,914 o Foundation Insulation o Insulation @ Exterior Walls and Ceiling o Sound Insulation o E.I.F.S. Dryvit o Caulking @ Doors and Windows o Metal Roof, flashing, Gutters, & Downspouts o Water Proofing Membrane 13 DOORS/HARDWARE/STOREFRONT................................................$88,475 o Hollow Metal Doors and Frames o Wood Doors (Oak) o Wood Door Frames (Oak) o Window Frames & Glass stops (Oak) o Access Door to Attic & Drive-up Soffit o Finish Hardware o Storefronts o Electrical Entry Doors o Glass & Glazing o Relites FINISHES ...............................................................$138,050 o Gypsum Wallboard o Acoustical ceiling o Floor Covering o P-lam Wainscot o Painting SPECIALTIES..............................................................$15,455 o Toilet Accessories o Toilet Compartments o Flag Pole o Fire Extinguisher Cabinets o Interior Signage ELEVATOR.................................................................$42,720 o 3-Stop Hydraulic Elevator PLUMBING.................................................................$21,400 o Underground Piping o Toilets o Water Heater o Lavatories o Hose Bibs FIRE PROTECTION..........................................................$58,500 o Fire Protection Alarm System o Fire Protection Sprinkler System H. V. A. C..............................................................$119,925 o Gas Fired Furnace with Air conditioning o Exhaust fans o Controls ELECTRICAL..............................................................$118,733 o Primary Power o Interior Lighting o Mechanical Equipment Hook-up o Exterior Lighting & Light Poles o Site Signage Conduit (Hook-up by Owner) o Phone Service Conduit CONTRACTORS CONSTRUCTION COST.......................$1,884,400 CONTRACTORS FIXED FEE................................ $145,000 ----------- NOT TO EXCEED CONTRACT PRICE........................$2,029,400 =========== 14 NOTES EXCLUSIONS & QUALIFICATIONS 1. Building Permit by Owner. 2. Impact Fee by Owner. 3. Utility hook-up fees by Owner. 4. Water Meter & hook-up (if any) by Owner. 5. Signage including electrical hook-up by Owner. 6. Kitchen Equipment by Owner. 7. W.S.S.T and B & O Tax Excluded. 8. Course of construction insurance by Owner. 9. Civil Engineering by Owner. 10. Additional Office Areas are excluded. 11. Office Furniture by Owner. 12. Security Wiring by Owner. 13. Communication Wiring and Equipment by Owner. 14. Bank Equipment (vault, Diebold cabinets, ATM night deposit, etc.) by Owner. 15. Landscaping/Retaining Wall Design and Construction by Owner. 16. Included a floor covering budget ($36,000). 17. Included an Electrical Budget ($105,000). 15 Contract Exhibit B - Project Schedule Rev 0 dated 3/17/00 EXHIBIT B TIME LINE WHIDBEY ISLAND BANK - OAK HARBOR Diagram omitted: Time line TASK NAME DURATION START FINISH ________________________________________________________________________________ Sitework 168 days 03/20/00 11/08/00 ________________________________________________________________________________ Strip Site 5 days 03/20/00 03/24/00 Excavate Basement 3 days 03/27/00 03/29/00 Underground utilities 10 days 03/30/00 04/12/00 Storm Drains 10 days 04/13/00 04/26/00 Sidewalks & Ramps 8 days 09/19/00 09/28/00 Handrail 2 days 09/29/00 10/02/00 Finish Grade Site 5 days 10/03/00 10/09/00 Asphalt Paving 10 days 10/10/00 10/23/00 Curbs & Striping 2 days 10/24/00 10/25/00 Landscaping 10 days 10/26/00 11/08/00 ________________________________________________________________________________ Bank Construction 139 days 05/30/00 12/08/00 ________________________________________________________________________________ Continuous Footings 7 days 05/30/00 06/07/00 Basement Walls 10 days 06/08/00 06/21/00 Rough in Under slab 3 days 06/21/00 06/23/00 Waterproofing 3 days 06/21/00 06/23/00 Fine Grade slab 2 days 06/26/00 06/27/00 Pour slab 2 days 06/28/00 06/29/00 Frame L.L. Struct. Wall 4 days 06/30/00 07/05/00 Erect Struct. Steel 5 days 06/30/00 07/06/00 1St Floor System 3 days 07/07/00 07/11/00 Backfill Fdn 3 days 07/07/00 07/11/00 Vault Slab 3 days 07/12/00 07/14/00 1st Floor Struct. Walls 5 days 07/12/00 07/18/00 Interior Framing 33 days 07/12/00 08/25/00 Install Vault 1 day 07/14/00 07/14/00 2nd Floor System 5 days 07/19/00 07/25/00 2nd Floor Struct. Walls 5 days 07/26/00 08/01/00 Roof Framing & Sheathing 12 days 08/02/00 08/17/00 Roofing & Flashing 5 days 08/18/00 08/24/00 Install Windows 4 days 08/25/00 08/30/00 RI Sprinkler System 15 days 08/29/00 09/18/00 RI Mechanical 15 days 08/29/00 09/18/00 RI Electrical 15 days 08/29/00 09/18/00 RI Security/Data/Fire Alarm 15 days 08/29/00 09/18/00 RI Plumbing 5 days 08/30/00 09/05/00 EIFS 14 days 08/31/00 09/19/00 Electrical Inspection 1 day 09/18/00 09/18/00 Elevator 15 days 09/18/00 10/06/00 Insulation 3 days 09/19/00 09/21/00 Drywall 14 days 09/22/00 10/11/00 16 Paint Interior 4 days 10/12/00 10/17/00 Suspended Ceiling Grid 8 days 10/16/00 10/25/00 Plastic Laminate 3 days 10/26/00 10/30/00 Install Casework 10 days 10/27/00 11/09/00 Doors & Millwork 14 days 10/31/00 11/17/00 Fire Sprinkler Trim 15 days 11/01/00 11/21/00 Electrical Finish 15 days 11/02/00 11/22/00 HVAC Finish 15 days 11/03/00 11/23/00 Data / Security Trim 14 days 11/09/00 11/28/00 Plumbing Trim 4 days 11/10/00 11/15/00 Fire Alarm System 5 days 11/20/00 11/24/00 Carpet 9 days 11/23/00 12/05/00 Susp. Ceiling Tile 3 days 11/24/00 11/28/00 Bank Equip. 5 days 11/27/00 12/01/00 Final Clean 3 days 12/06/00 12/08/00 Substantial Completion 0 days 12/08/00 12/08/00 17 Contract Exhibit C - Equipment Rental Rates for Construction Owned Equipment EXHIBIT C FISHER SONS, INC. EQUIPMENT RENTAL RATE BY EQUIPMENT NUMBER ASSET # EQUIP # SERIAL # DESCRIPTION HOUR DAY WEEK MONTH - ------------------------------------------------------------------------------------------------------------------------------------ RENTAL RATES ARE BASED ON A 28 DAY MONTH IN ACCORDANCE WITH STANDARD RENTAL FIRMS RADIOS
23 Contract Exhibit D - Construction Labor Rates EXHIBIT D SKAGIT & ISLAND COUNTIES STANDARD LABOR COST BILLING RATES EFFECTIVE 6/1/00 - 11/30/00 DOUBLE LEVEL RATE OVERTIME TIME SUPERINTENDENT Sitework Superintendent $49.02 $68.69 $88.37 1. $51.65 $72.06 $92.46 2. $54.45 $79.86 $105.26 3. $56.21 $82.49 $108.76 4. $59.71 $87.74 $115.77 Out of Town $74.86 $102.90 $130.93 CARPENTER BY LEVEL 1. 60% $31.90 $42.43 $52.96 2. 65% $33.65 $45.06 $56.47 3. 70% $35.41 $47.69 $59.98 4. 75% $37.16 $50.33 $63.49 5. 80% $38.92 $52.96 $67.00 6. 85% $40.67 $55.59 $70.51 7. 90% $42.43 $58.22 $74.02 8. 95% $44.18 $60.86 $77.53 9. Journeyman $45.94 $63.49 $81.04 10. Leadman $48.85 $67.86 $86.87 LABORERS BY LEVEL 1. $17.34 $24.18 $31.03 2. $19.32 $27.15 $34.99 3. $21.79 $30.87 $39.94 4. $25.09 $35.81 $46.54 5. $28.39 $40.76 $53.13 6. $31.69 $45.71 $59.73 7. $35.77 $51.20 $66.62 NOTES: 1. Above billing rates include FICA, FUTA, SUTA, workers compensation insurance premiums, health & welfare fringe benefits and a 25% charge for hand tools, power tools, safety plan and equipment, small equipment, small trucks, fuel, shop support, etc. per Article 7.1.1.3 and 7.1.4.1; Liability insurance per Article 7.1.5.1 and payroll accounting costs directly attributed to on-site labor. 2. Contracts extending beyond expiration date will be updated to include same charges on new labor rates. 3. Actual charges may vary slightly due to maximum FUTA/SUTA limits and workers compensation inurance "risk class" identification.