Malaysia Energy Commission Approval and Unofficial Translation
EXHIBIT 10.1
The Malaysia Energy Commission in Malay and unofficial English translation
Translation from Malay
2 |
Translation from Malay
3 |
Translation from Malay
Receiver’s copy | ||
Receipt No.: 200612IKE04647 Receipt Date: 12-June-2020 | ||
Form V (Rule 97) | ||
Applicant ID: SJT1612020009757 | ||
Our Reference: 6038256/KI6212/20 | ||
ENERGY COMMISSION | ||
ELECTRICAL SUPPLY ACT 1990 |
ACKNOWLEDGEMENT OF APPROVAL
Based on rule 97 of the Electricity Rules 1994, this Acknowledgement is issued to
WKL-ECOEARTH SDN. BHD.
(name of importer)
Whose address is
NO. 2A, JALAN PJU 3/48 SUNWAY DAMANSARA
47810 PETALING JAYA SELANGOR
(address)
And the approval is given to
IMPORT | DISPLAY (1) | SELL | ADVERTISE |
The equipment whose description is mentioned below: directly from,
CN – CHINA
(name and country of manufacturer)
And that description abides by:
(a) | Standard: | Safety IEC 60335-2-98:2002+A1:2004+A2:2008 IEC 60335-1:2010+COR1:2010+COR2:2011+A1:2013+A2:2016+COR1:2016 | |
(b) | Test Report Number Type: | Safety TUV Rheinland (Guangdong) Ltd 60369689 001 CB CERT JPTUV-109102 | |
(c) | Test Date: | Safety 02-June-2020 |
For the period of one year from the issue date as shown below, subject to the following conditions:
- AS PER ATTACHMENT A -
Issue date: | 11-June-2020 | End of Period Date: 10-June-2021 |
Approval Number: | 7578/20 | Fee in RM: 220.00 |
Equipment Description
Equipment: | Air Cooler |
Trade Name: | e-COND-LIFE |
Type / Model: | ECL-AP01 |
Equipment Specification
Voltage: | 220-240 Volt | Power: 130 Watts |
Frequency: | 50 Hz | Current: - Amps |
KT Value: |
Head of Equipment Unit Department of Electrical Safety Energy Commission
|
1. The approved equipment is suggested for displaying only and not for sale, installation or usage.
4 |
Translation from Malay
Receiver’s copy ATTACHMENT A
Acknowledgement Number: SJT161106071712020
Applicant ID: SJT1612020009757 |
Conditions:
i) | This equipment shall go through a consignment test that is conducted by the Standard and Industrial Research Institute of Malaysia (SIRIM); | |
ii) | The equipment that passes the consignment test shall be attached a label that is issued by SIRIM; | |
iii) | The importer is required to present each equipment’s serial number for each consignment that is brought (into Malaysia) to a SIRIM authority; | |
iv) | An equipment that fails the consignment test shall be returned to its country of origin or destroyed; | |
v) | The equipment shall be built properly and match with a supply cord main plug that is approved by the Energy Commission (Suruhanjaya Tenaga, ST). | |
The supply cord shall be certified based on MS 140, MS 2112-5, BS 6500 or IEC 60227-1 & IEC 60227-5 standards (insulated PVC – flexible cable/cord), or MS 140, IEC 60245-4, BS 6500 or IEC 60245-1 & IEC 60245-4 (insulated rubber – flexible cable/cord) standards. | ||
The main plug that is used shall be as follows: - | ||
a) | 13A fuse plug, fulfilling the MS 589: Part 1 or BS 1363: Part 1 standard; | |
b) | 15A plug, fulfilling the MS 1577 standard; | |
c) | 2.5A, 250V two-pole circular plug that cannot be rewired with a cord for connection to class II equipment, fulfilling the MS 1578 or BS EN 50075 standard. | |
vi) | A request to renew the Acknowledgement of Approval together with a payment shall be done not less than fourteen (14) days from the Acknowledgement’s end of period date (Rule 106, Electricity Rules (Amendment) 2003) |
|
Head of Equipment Unit Department of Electrical Safety Energy Commission |
5 |