Purchase Order Agreement between Synthetech, Inc. and Oregon Industrial Contractors, Inc.
This agreement documents a series of purchase orders issued by Synthetech, Inc. to Oregon Industrial Contractors, Inc. for various maintenance, installation, fabrication, and consulting services at Synthetech’s Albany, Oregon facility. The purchase orders specify the work to be performed, quantities, prices, and payment terms, typically requiring payment within 10 days. The agreement outlines the responsibilities of both parties regarding invoicing, referencing purchase order numbers, and delivery of services or goods as described in each order.
Exhibit 10.17
of Form 10-K
Synthetech Inc. | PURCHASE ORDER |
1290 Industrial Way, P.O.Box 646 |
Albany, Oregon 97321 |
Phone ###-###-####; Fax: (541) 967-9424 |
The following number must appear on all related correspondence, shipping papers, and invoices:
P.O. NUMBER:
To: Oregon Industrial Contractors, Inc. | Ship To: Synthetech, Inc. |
P.O. Box B | 1290 Industrial Way |
Albany, Oregon 97321 | Albany, OR 97321 |
P.O. DATE | REQUISITIONER | SHIP VIA | F.O.B. POINT | TERMS |
N/A | Net __ Days | N/A |
QTY | DESCRIPTION | UNIT PRICE | TOTAL |
| $ | $ |
SUBTOTAL $ |
SALES TAX |
SHIPPING |
OTHER |
TOTAL $ |
1. Please send two copies of your invoice.
2. Reference the P.O. number on the invoice.
Account Code
Authorized by Date
<Table> | |||||||||||
<Caption> | |||||||||||
<S> <C> | <C> | <C> | <C> | <C> | <C> | <C> | <C> | ||||
Schedule of Purchase Orders ("PO") | |||||||||||
Vendor: | Oregon Industrial Contractors, Inc. | ||||||||||
P.O. Box B | |||||||||||
Albany, OR 97321 | |||||||||||
PO Number | PO Date | Requisitioner | Terms | Qty | Description | Unit Price | Total | ||||
74306 | 1-Apr-2000 | L.Tucker | Net 10 Days | 1 | Open P.O. for computer work | $1,080.00 | $1,080.00 | ||||
74319 | 12-Apr-2000 | L.Tucker | Net 10 Days | 1 | Misc. open P.O. for month of April | $500.00 | $500.00 | ||||
74371 | 18-Apr-2000 | L.Tucker | Net 10 Days | 1 | Install 1/2 c.s. threaded pipe from nitrogen in utility room to centrifuge | $2,227.00 | $2,227.00 | ||||
area in pilot room and abort tank area in production room. Also relocate | |||||||||||
wash station to east wall and repipe steam and water. | |||||||||||
74369 | 18-Apr-2000 | L.Tucker | Net 10 Days | 1 | Run 1" ss line from 1st floor plant 2 to roof. Run 1" ss line from scrubber | $2,350.00 | $2,350.00 | ||||
building to 400 tank farm burm, both lines will end with a valve and the | |||||||||||
roof line will have a draw valve to empty line when not in use. | |||||||||||
74370 | 18-Apr-2000 | L.Tucker | Net 10 Days | 1 | Install a safety shower near the truck loading station at the 400 tank farm. | $4,080.00 | $4,080.00 | ||||
Run 1.5" galvanized threaded pipe to existing header inside building near | |||||||||||
T203. | |||||||||||
16258 | 20-Apr-2000 | J.Melka | Net 10 Days | 1 | Maintenance Shop remodel to include the following items: | $10,180.00 | $10,180.00 | ||||
1 | Welding Bench | $2,850.00 | $2,850.00 | ||||||||
1 | Mobile Work Bench | $2,300.00 | $2,300.00 | ||||||||
1 | Storage Bin | $1,685.00 | $1,685.00 | ||||||||
1 | 10 ft Locker | $2,465.00 | $2,465.00 | ||||||||
1 | 12 ft Locker | $3,450.00 | $3,450.00 | ||||||||
16267 | 1-May-2000 | J.Melka | Net 10 Days | 1 | Install boiler per bid package dated 4/18/00. | $79,483.00 | $79,483.00 | ||||
1 | Install Plant 1&2 steam isolation valves in steam header | $1,522.00 | $1,522.00 | ||||||||
1 | Additional T&M to install boiler vent silencers. | $2,573.00 | $2,573.00 | ||||||||
74434 | 3-May-2000 | J.Melka | Net 10 Days | 1 | Open P.O. for misc. work in May. | $0.00 | $0.00 | ||||
74474 | 11-May-2000 | L.Tucker | Net 10 Days | 1 | Fabricate 2 pans from 10 ga mild steel. | $703.00 | $703.00 | ||||
74304 | 12-May-2000 | L.Tucker | Net 10 Days | 1 | Shop labor 2 straight hours journeyman-elevator floor plates | $94.00 | $94.00 | ||||
1 | Field labor hours superintendent-elevator floor plates | $59.00 | $59.00 | ||||||||
1 | Field labor hours journeyman-elevator floor plates | $47.00 | $47.00 | ||||||||
1 | Material-elevator floor plates | $389.00 | $389.00 | ||||||||
1 | Markup-elevator floor plates | $38.90 | $38.90 | ||||||||
74493 | 17-May-2000 | L.Tucker | Net 10 Days | 1 | Fabricate and install pipes on t-224 and T-225 | $1,820.00 | $1,820.00 | ||||
74435 | 1-Jun-2000 | L.Tucker | Net 10 Days | 1 | Computer support | $508.40 | $508.40 | ||||
74586 | 7-Jun-2000 | L.Tucker | Net 10 Days | Job#15068 Fabricate dry solids charge chute for R-206 | |||||||
8 | Straight time hours superintendent | $59.00 | $472.00 | ||||||||
18 | Straight time hours journeyman | $47.00 | $846.00 | ||||||||
1 | Materials | $796.26 | $796.26 | ||||||||
1 | 10% markup | $79.63 | $79.63 | ||||||||
1 | Material from OICI stock | $26.00 | $26.00 | ||||||||
74661 | 26-Jun-2000 | L.Tucker | Net 10 Days | 1 | Remove heat exchanger, modify piping, and install new heat exchanger | $3,000.00 | $3,000.00 | ||||
16296 | 29-Jun-2000 | J.Melka | Net 10 Days | 1 | Time and material to move the small tray dryer to building 2, skid mount | $15,000.00 | $15,000.00 | ||||
the TCU, and pipe the utilities into the system. Not to exceed bid. | |||||||||||
74700 | 5-Jul-2000 | J.Melka | Net 10 Days | 1 | Open P.O. for July | $500.00 | $500.00 | ||||
74701 | 7-Jul-2000 | L.Tucker | Net 10 Days | 1 | Computer consulting for the month of July. 2 wks | $720.00 | $720.00 | ||||
16300 | 7-Jul-2000 | J.Melka | Net 10 Days | 1 | Install the Evergreen Engineering designed support system for the | $49,100.00 | $49,100.00 | ||||
2,500 gallon reactor. Install the 2,500 gallon reactor and the 2,000 gallon | |||||||||||
reactor in building 2, south reactor bay. Also install two primary vapor | |||||||||||
condensers on the 2nd floor of building 2 and install two 1,200 gallon | |||||||||||
distillate receiver tanks on the 1st floor of building 2. | |||||||||||
74701 | 7-Jul-2000 | L.Tucker | Net 10 Days | 1 | Computer consulting for the month of July. 2 wks | $720.00 | $720.00 | ||||
74592 | 12-Jul-2000 | L.Tucker | Net 10 Days | 1 | Shop labor - misc. shearing | $23.50 | $23.50 | ||||
1 | Material - misc. shearing | $60.09 | $60.09 | ||||||||
16296-1 | 13-Jul-2000 | J.Melka | Net 10 Days | 1 | Field order change to reposition D291, improve unloading and loading | $2,100.00 | $2,100.00 | ||||
locations, improve vent, add breathable air station, etc. | |||||||||||
16303 | 13-Jul-2000 | J.Melka | Net 10 Days | 1 | Installation of new scrubber in plant 1 | $15,000.00 | $15,000.00 | ||||
74729 | 14-Jul-2000 | L.Tucker | Net 10 Days | 1 | Repair 4 Plaecol heat exchangers | $3,710.00 | $3,710.00 | ||||
74727 | 14-Jul-2000 | L.Tucker | Net 10 Days | 1 | Repair a 10 tube heat exchanger | $1,155.00 | $1,155.00 | ||||
74728 | 14-Jul-2000 | L.Tucker | Net 10 Days | 1 | Replace 'U-Tube' bundle in Perry heat exchanger | $3,300.00 | $3,300.00 | ||||
16310 | 1-Aug-2000 | K.Moster | Net 10 Days | 1 | Time and material to install sample ports and extend dip tubes on | $1,500.00 | $1,500.00 | ||||
building 2 reactors. | |||||||||||
74877 | 2-Aug-2000 | J.Melka | Net 10 Days | 1 | Open maintenance P.O. for August | $3,490.18 | $3,490.18 | ||||
74877 | 2-Aug-2000 | J.Melka | Net 10 Days | 1 | Change order addendum | $4,648.00 | $4,648.00 | ||||
16316 | 7-Aug-2000 | K.Moster | Net 10 Days | 1 | Time and material to pipe the large tray dryer (D292) in Building 2, skid | $27,000.00 | $27,000.00 | ||||
mount the TCU292 and TCU293, and pipe the utilities into the system. | |||||||||||
16321 | 15-Aug-2000 | J.Melka | Net 10 Days | 1 | Install building 1 flammable storage ventilation fan including new | $3,450.00 | $3,450.00 | ||||
stand for fan. | |||||||||||
74911 | 6-Sep-2000 | J.Melka | Net 10 Days | 1 | Open P.O. for September maintenance | $2,216.39 | $2,216.39 | ||||
75070 | 20-Oct-2000 | J.Melka | Net 10 Days | 1 | 1 Millwright to replace maintenance employee while on vacation. | $0.00 | $0.00 | ||||
75075 | 25-Oct-2000 | J.Melka | Net 10 Days | 1 | Labor, material, & machining to modify filter pot as discussed. | $2,000.00 | $2,000.00 | ||||
75143 | 8-Nov-2000 | J.Melka | Net 10 Days | 1 | Open maintenance P.O. for November | $500.00 | $500.00 | ||||
16340 | 14-Nov-2000 | K.Moster | Net 10 Days | 2 | Sets of Sparkler Filter shoes designed to fit the fork lift and manual | $392.50 | $785.00 | ||||
pallet jacks to allow the Sparkler Filters to be moved from place to place | |||||||||||
without damaging the vessel or associated piping. | |||||||||||
75238 | 1-Dec-2000 | J.Melka | Net 10 Days | 1 | Open maintenance P.O. for December | $500.00 | $500.00 | ||||
16338 | 12-Dec-2000 | D.Willhite | Net 10 Days | 1 | Install electric heater in temporary lab. | $659.00 | $659.00 | ||||
16343 | 19-Dec-2000 | D.Willhite | Net 10 Days | 1 | Remove pilot plant steam piping from old boiler room and reroute steam | $5,083.81 | $5,083.81 | ||||
piping out of old boiler room to make way for new R&D Lab construction | |||||||||||
16356 | 8-Jan-2001 | D.Willhite | Net 10 Days | 1 | Install new mass meter in tank farm. | $1,000.00 | $1,000.00 | ||||
75404 | 10-Jan-2001 | J.Melka | Net 10 Days | 1 | Installation of new 100 gallon glass lined reactor, including removal of | $10,970.00 | $10,970.00 | ||||
750 and repiping to new GL103. | |||||||||||
75412 | 11-Jan-2001 | J.Melka | Net 10 Days | 1 | Installation of 30hp Kobelco oil free breathable air compressor. | $3,800.00 | $3,800.00 | ||||
16361 | 15-Jan-2001 | K.Moster | Net 10 Days | 1 | Provide labor, tools, and equipment to install inlet piping to T500 | $2,000.00 | $2,000.00 | ||||
(distillation feed tank). | |||||||||||
75474 | 24-Jan-2001 | J.Melka | Net 10 Days | 1 | Spool up 1.5" expansion joint for replacement of split pipe on distillation | $1,000.00 | $1,000.00 | ||||
tower. | |||||||||||
75294 | 29-Jan-2001 | D.Willhite | Net 10 Days | 1 | Install valve actuators in tank farm. Part of tank farm fire remedies. | $2,919.15 | $2,919.15 | ||||
75516 | 1-Feb-2001 | J.Melka | Net 10 Days | 1 | Open maintenance P.O. for February | $500.00 | $500.00 | ||||
16367 | 1-Feb-2001 | K.Moster | Net 10 Days | 1 | Provide labor, tools, and equipment to install D293 per verbal | $1,300.00 | $1,300.00 | ||||
instructions given by L.Tucker. | |||||||||||
16368 | 1-Feb-2001 | D.Willhite | Net 10 Days | 1 | Tap ethylene glycol pipe in waste water berm for 1 & 1/2" valve, install | $1,369.00 | $1,369.00 | ||||
tee in ethylene glycol return line, and relocate back flow preventor out | |||||||||||
of lab area and into production room. | |||||||||||
16370 | 5-Feb-2001 | J.Melka | Net 10 Days | 1 | Time and material to install and repipe the distillation pumps | $3,800.00 | $3,800.00 | ||||
16384 | 8-Mar-2001 | D.Willhite | Net 10 Days | 1 | Mechanical installation of waste water system per bid package dated | $133,878.00 | $133,878.00 | ||||
02/16/01 and contract A101-1997 between owner and contractor | |||||||||||
dated 03/07/01. | |||||||||||
16387 | 12-Mar-2001 | J.Melka | Net 10 Days | 1 | Install tee in pilot plant for lab intro. | $325.00 | $325.00 | ||||
75695 | 18-Mar-2001 | K.Moster | Net 10 Days | 1 | Time and material to install pump in distillation area. | $900.00 | $900.00 |
</Table>