Change Order No. 3, dated March 18, 2022, by and between Adicet Therapeutics, Inc. and CP Enterprises, Inc. d/b/a CP Construction

EX-10.3 4 acet-ex10_3.htm EX-10.3 EX-10.3

ocument G701

Change Order

 

 

 

 

Change Order Number: 03

 

 

Project: Adicet Therapeutics

1000 Bridge Parkway

Redwood City, CA 94065

 

 

 

Architect's Project No:

 

 

Owner

 

Architect

 

 

 

 

 

 

 

 

To Contractor: (Name and Address

CP Construction

a Division of CP Enterprises

Newark, CA 94560

 

 

Contract For: Tenant Improvements

 

 

Contractor

 

Field

 

Other

 

 

 

The Contract is changed as follows:

(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)

Pressurized Change

 

Adicet GxP Lab Rev 01 (Per Pricing Revision 02 set & the 1/20/22 Preliminary

 

Schedule)

 

 

 

Demo

 

$ 165,000.00

Demo existing finishes & reinstall

 

$ 350,000.00

Walls

 

$ 248,815.00

VCT and carpet flooring

 

$ 9,000.00

HVAC

 

$ 1,662,201.00

Electrical

 

$ 567,000.00

Plumbing

 

$ 499,644.00

Fire Sprinklers

 

$ 61,237.00

Fire alarms

 

$ 47,950.00

Doors

 

$ 151,300.00

Lab casework, tables and lockers

 

$ 134,250.00

Flooring labs

 

$ 134,700.00

Equipment lift

 

$ 130,000.00

Roofing

 

$ 45,000.00

Structural steel

 

$ 275,000.00

T-bar ceilings

 

$ 130,320.00

FRP walls

 

$ 75,000.00

Painting

 

$ 61,580.00

Final Janitorial

 

$ 7,000.00

General conditions & PM

 

$ 90,000.00

Subtotal

 

$ 485,017.00

10% Profit, Overhead & Insurance

 

$ 484,501.70

Total

 

$ 5,329,518.70

 


The original Contract Sum was

 

$ 13,625,700.00

The net change by previously authorized Change Orders

 

$ 178,750.00

The Contract Sum prior to this Change Order was

 

$ 13,804,450.00

The Contract Sum will be increased by this Change Order in the amount of

 

$ 5,329,518.70

The new Contract Sum including this Change Order will be

 

$ 19,133,968.70

The Contract will be increased by see attached schedule ( ) days

 

 

The date of Substantial Completion as of the date of this Change Order therefore is

 

 

 


 

(Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.)

 

NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.

 

Form4 Architecture, Inc.

 

CP Construction

 

Adicet Therapeutics, Inc.

ARCHITECT (Firm Name)

 

CONTRACTOR (Firm Name)

 

OWNER (Firm Name)

 

 

 

 

 

120 2nd St# 2. San Francisco, CA 94105

 

6662 Mayhews Landing Rd. Newark, 94560

 

200 Constitution Dr. Menlo Park, CA 94025

Address

 

Address

 

Address

 

 

 

 

 

/s/ Paul Ferro

 

/s/ Leslie Hellewell

 

/s/ Charlie Penner

By (Signature)

 

By (Signature)

 

By (Signature)

 

 

 

 

 

Paul Ferro

 

Leslie Hellewell

 

Charlie Penner

Typed Name

 

Typed Name

 

Typed Name

 

 

 

 

 

March 11, 2022

 

March 18, 2022

 

March 18, 2022

Date

 

Date

 

Date