Change Order No. 002 to Hard Rock Hotel & Casino Construction Contract between Premier Entertainment Biloxi LLC, Premier Finance Biloxi Corp, Roy Anderson Corp, and Paul Steelman Design Group

Summary

This change order amends the construction contract for the Hard Rock Hotel & Casino in Biloxi, Mississippi, between Premier Entertainment Biloxi LLC, Premier Finance Biloxi Corp, Roy Anderson Corp (contractor), and Paul Steelman Design Group (architect). It increases the contract sum by $3,152,761 for various construction modifications and extends the completion date by 30 days to August 23, 2005. The change order is valid only when signed by all parties and details specific project adjustments, including structural changes and additional requirements.

EX-2.1 2 a05-6104_1ex2d1.htm EX-2.1

EXHIBIT 2.1

 

AIA Document ###-###-####

Ownerý

Change Order

Architectý

 

Contractorý

 

Fieldý

 

Othero


PROJECT (Name and address)

CHANGE ORDER NUMBER:

002

 

HARD ROCK HOTEL & CASINO

 

777 BEACH BOULEVARD

DATE:

March 3, 2005

 

BILOXI, MS 39530

 

 

TO CONTRACTOR (Name and address)

ARCHITECT’S PROJECT NC

23020

 

ROY ANDERSON CORP

CONTRACT DATE:

December 24, 2003

 

PO BOX 2

CONTRACT FOR

Hard Rock Construction

 

GULFPORT, MS 39502

 


THE CONTRACT IS CHANGED AS FOLLOWS

 

 

 1  Spa Support Structure - Modified existing structure to support Spa Equipment

82,233

 

 

 

 

 2  Waveload Impact

549,091

 

 

 

 

 3  Revised Porte Cochere Steel Structure

422,753

 

 

 

 

 4  EIFS Union Requirement

278,525

 

 

 

 

 5  Additional Painting and Finishes Requirement

847,279

 

 

 

 

 6  Added Water Surface and Spa At Pool Club Area

44,400

 

 

 

 

 7  Exterior Cladding for Porta Cochere - EIFS and Metal Panels

481,493

 

 

 

 

 8  Additional Soft Flooring requirement

150,593

 

 

 

 

 9  Modified Structural Steel @ Loading Dock Area to Allow for Truck Clearance

115,896

 

 

 

 

10  Brace Frames Modification

34,501

 

 

 

 

11  Foam block for Raised Seating @ HRL

62,610

 

 

 

 

12  Guitar Sign Foundation

83,387

 

 

Total

3,152,761

 

 

 

 

The Original Contract Sum Was

$

81,957,183

The Net Change By Previously Authorized Change Orders

$

3,640,933

The Contract Sum Prior To This Change Order Was

$

85,598,116

The Contract Sum Will Be Increased By This Changer Order in the Amount of

$

3,152,761

The New Contract Sum lncluding This Change Order Will Be

$

88,750,877

 

The Contract Time will be increased by          Thirty (30)  Days

 

 

The date of Substantial Completion as of the date of this Change Order therefore is

  8/23/2005

 

 

NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price Which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive

 

NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER

 

Paul Steelman Design Group

 

Roy Anderson Corp

 

Premier Entertainment Biloxi LLC (Premier)

ARCHITECT (Firm Name)

 

CONTRACTOR (Firm Name)

 

OWNER (Firm Name)

 

 

 

 

Premier Finance Biloxi Corp (PFC)

3330 W Desert Inn Road

 

P.O. Box 2

 

P.O. Box 268

Las Vegas, NV 89102

 

Gulfport, MS 39502

 

Biloxi, MS ###-###-####

ADDRESS

 

ADDRESS

 

ADDRESS

 

 

 

 

 

/s/ Robert Murphy

 

/s/ Meng Chai

 

/s/ Joe Billhimer

BY (Signature)

 

BY (Signature)

 

BY (Signature)

 

 

 

 

For Premier and PFC

Robert Murphy

 

Meng Chai

 

Joe Billhimer

(Type Name)

 

(Type Name)

 

(Type Name)

 

 

 

 

 

03/30/05

 

3/3/05

 

3/30/05

DATE:

 

DATE:

 

DATE:

 

 

 

 

 


AIA Document ###-###-####. Copyright 1978 and 2001 by The American Institute of Architects.  All rights reserved.  Warning: This AIA Document is protected by the U.S. Copyright Law and International Treaties.  Unauthorized reproduction or distribution of this AIA Document, or any Portion of it, may result in severe civil and criminal penalties and will be prosecuted to the maximum extent possible under the law.  This document was produced by AIA software under Order No 1000097216_1 which expires on 2/8/2005, and is not for resale.