Change Order No. 002 to Hard Rock Hotel & Casino Construction Contract between Premier Entertainment Biloxi LLC, Premier Finance Biloxi Corp, Roy Anderson Corp, and Paul Steelman Design Group
This change order amends the construction contract for the Hard Rock Hotel & Casino in Biloxi, Mississippi, between Premier Entertainment Biloxi LLC, Premier Finance Biloxi Corp, Roy Anderson Corp (contractor), and Paul Steelman Design Group (architect). It increases the contract sum by $3,152,761 for various construction modifications and extends the completion date by 30 days to August 23, 2005. The change order is valid only when signed by all parties and details specific project adjustments, including structural changes and additional requirements.
EXHIBIT 2.1
AIA Document ###-###-#### | Ownerý |
Change Order | Architectý |
| Contractorý |
| Fieldý |
| Othero |
PROJECT (Name and address) | CHANGE ORDER NUMBER: | 002 | ||
| HARD ROCK HOTEL & CASINO | |||
| 777 BEACH BOULEVARD | DATE: | March 3, 2005 | |
| BILOXI, MS 39530 |
| ||
TO CONTRACTOR (Name and address) | ARCHITECTS PROJECT NC | 23020 | ||
| ROY ANDERSON CORP | CONTRACT DATE: | December 24, 2003 | |
| PO BOX 2 | CONTRACT FOR | Hard Rock Construction | |
| GULFPORT, MS 39502 |
| ||
THE CONTRACT IS CHANGED AS FOLLOWS |
| 1 Spa Support Structure - Modified existing structure to support Spa Equipment | 82,233 | |
|
|
| |
| 2 Waveload Impact | 549,091 | |
|
|
| |
| 3 Revised Porte Cochere Steel Structure | 422,753 | |
|
|
| |
| 4 EIFS Union Requirement | 278,525 | |
|
|
| |
| 5 Additional Painting and Finishes Requirement | 847,279 | |
|
|
| |
| 6 Added Water Surface and Spa At Pool Club Area | 44,400 | |
|
|
| |
| 7 Exterior Cladding for Porta Cochere - EIFS and Metal Panels | 481,493 | |
|
|
| |
| 8 Additional Soft Flooring requirement | 150,593 | |
|
|
| |
| 9 Modified Structural Steel @ Loading Dock Area to Allow for Truck Clearance | 115,896 | |
|
|
| |
| 10 Brace Frames Modification | 34,501 | |
|
|
| |
| 11 Foam block for Raised Seating @ HRL | 62,610 | |
|
|
| |
| 12 Guitar Sign Foundation | 83,387 | |
|
| Total | 3,152,761 |
|
|
|
|
The Original Contract Sum Was | $ | 81,957,183 | |
The Net Change By Previously Authorized Change Orders | $ | 3,640,933 | |
The Contract Sum Prior To This Change Order Was | $ | 85,598,116 | |
The Contract Sum Will Be Increased By This Changer Order in the Amount of | $ | 3,152,761 | |
The New Contract Sum lncluding This Change Order Will Be | $ | 88,750,877 |
The Contract Time will be increased by Thirty (30) Days |
|
|
The date of Substantial Completion as of the date of this Change Order therefore is | 8/23/2005 |
|
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price Which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive |
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER |
Paul Steelman Design Group |
| Roy Anderson Corp |
| Premier Entertainment Biloxi LLC (Premier) |
ARCHITECT (Firm Name) |
| CONTRACTOR (Firm Name) |
| OWNER (Firm Name) |
|
|
|
| Premier Finance Biloxi Corp (PFC) |
3330 W Desert Inn Road |
| P.O. Box 2 |
| P.O. Box 268 |
Las Vegas, NV 89102 |
| Gulfport, MS 39502 |
| Biloxi, MS ###-###-#### |
ADDRESS |
| ADDRESS |
| ADDRESS |
|
|
|
|
|
/s/ Robert Murphy |
| /s/ Meng Chai |
| /s/ Joe Billhimer |
BY (Signature) |
| BY (Signature) |
| BY (Signature) |
|
|
|
| For Premier and PFC |
Robert Murphy |
| Meng Chai |
| Joe Billhimer |
(Type Name) |
| (Type Name) |
| (Type Name) |
|
|
|
|
|
03/30/05 |
| 3/3/05 |
| 3/30/05 |
DATE: |
| DATE: |
| DATE: |
|
|
|
|
|
AIA Document ###-###-####. Copyright 1978 and 2001 by The American Institute of Architects. All rights reserved. Warning: This AIA Document is protected by the U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any Portion of it, may result in severe civil and criminal penalties and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software under Order No 1000097216_1 which expires on 2/8/2005, and is not for resale.