FRAMEWORK AGREEMENT ON TRANSFER AND LEASEBACK OF INDUSTRIAL PREMISES BETWEEN OCLARO TECHNOLOGY (SHENZHEN) CO., LTD. (SELLER AND LESSEE) AND SHENZHEN FANGDAO TECHNOLOGY CO., LTD. (BUYER AND LESSOR) MAY 15, 2012 FRAMEWORK AGREEMENT

EX-10.13 3 d368090dex1013.htm EX-10.13 EX-10.13

Exhibit 10.13

FRAMEWORK AGREEMENT

ON

TRANSFER AND LEASEBACK OF INDUSTRIAL PREMISES

BETWEEN

OCLARO TECHNOLOGY (SHENZHEN) CO., LTD.

(“SELLER” AND “LESSEE”)

AND

SHENZHEN FANGDAO TECHNOLOGY CO., LTD.

(“BUYER” AND “LESSOR”)

MAY 15, 2012


FRAMEWORK AGREEMENT

This “Framework Agreement on Transfer and Leaseback of Industrial Premises” (hereinafter the “Agreement”) is entered into in Shenzhen, China on May 15th, 2012, between:

Party A: Oclaro Technology (Shenzhen) Co., Ltd.

Address: No.2 Fenghuang Road, Futian Bonded Zone, Shenzhen.

Legal Representative: JERRY JOHN TURIN

Party B: Shenzhen Fangdao Technology Co., Ltd.

Address: Room 210, 2nd Floor East, No.211 Tairan Building, Chegongmiao Industry Zone, Futian District, Shenzhen.

Legal Representative: Luo Wenguang Authorized Representative: Liu Foci

(Party A and Party B shall be collectively referred to as the “Parties” and individually the “Party”)

Whereas:

 

1. Party A legally owns the property rights of the relevant industrial premises located in Futian Bonded Zone, Shenzhen (hereinafter the “Premises”). The Premises specifically includes: (1) industrial premises on section AB1C2D of the first floor and the third and fourth floor of Wanli Industry Building, with Property Certificate number “ShenFangDiZi No.3000675817”; and (2) industrial premises on the fifth, sixth and seventh floor of Wanli Industry Building, with Property Certificate number “ShenFangDiZi No.3000675591”.

 

2. Party A agrees to transfer the Premises to Party B as it is and, after the completion of the registration of the title transfer, leases back the Premises from Party B for the agreed term; while Party B agrees to buy the Premises from Party A and leases the Premises to Party A after the completion of the registration of the title transfer.

 

3. Pursuant to the provisions of “Interim Measures on the Transfer of Industrial Buildings in Shenzhen”, transfer of the Premises shall be carried out through listing or other public means at Shenzhen Land and Property Exchange Center (hereinafter the “Exchange Center”), otherwise there is a risk that the registration of the title transfer may not be approved by Shenzhen Property Right Registration Center (hereinafter the “Registration Center”). In this regard, the Parties both acknowledge and understand that, in practice, in certain cases, the Registration Center, based on specific circumstances of each industrial buildings, handles the registration of the title transfer of industrial buildings that are not transferred through listing but though direct execution of “Shenzhen Property Sales Contract”; the Parties both agree to apply for the registration of the title transfer of the Premises with the Registration Center by directly executing “Shenzhen Second-Hand House Sales Contract (2011 Sample Text)”, and if the registration procedures of the title transfer cannot be completed within the agreed term, then the Agreement shall be dealt with in accordance with the agreed methods in the Agreement.

 

2


Therefore, after amicable discussions in unanimity, the Parties hereby reach the following framework agreement in respect of the transfer and leaseback of the Premises for mutual compliance.

Article 1 Transfer of the Premises

 

1.1 Party A shall transfer the Premises to Party B as it is, and the title transfer of the Premises will be completed after the Registration Center approves handling the registration procedures of the title transfer and Party B actually becomes the registered title holder of the Premises.

 

1.2 Once the Registration Center approves the registration of the title transfer, the property rights to the Premises, the land use right to the apportioned parcel of land and the relevant auxiliary equipment and facilities (as set forth in Appendix 1, other movable machinery, equipment, facilities and etc. are owned by Party A) shall be simultaneously transferred to Party B.

Article 2 Transfer Price of the Premises and Its Payment

 

2.1 The total transfer price of the Premises is RMB 136,000,000.00 (RMB one hundred and thirty six million). The Parties agree that upon execution of the Second-hand House Sales Contract, the transfer price for property with property certificate number of “Shen FangDiZi No.3000675817” is RMB 65,860,903.00 and the transfer price for property with property certificate number of “ShenFangDiZi No.3000675591” is RMB 70,139,097.00.

 

2.2 The Parties agree to pay the transfer price of the Premises through escrow.

 

  (1) Within three business days after the execution of the Agreement, the Parties shall jointly go to China Everbright Bank, Shenzhen Central District Branch (the “Escrow Bank”) and sign the escrow agreement with the Escrow Bank in accordance with the agreed conditions in the Agreement.

 

  (2) The core contents of the escrow agreement shall include:

 

  (A) Within five business days after the execution of the escrow agreement, Party B shall pay the total transfer price of RMB 136,000,000.00 in a lump sum into the escrow account;

 

3


  (B) Within one business day upon satisfaction of any one of the following conditions, the Escrow Bank shall pay the transfer price to the bank account designated by Party A: (a) Party A provides the Escrow Bank with Party A’s unilateral payment instruction and an original copy of the “Computer Inquiry Result Form on Property Right Information” or a photocopy of the “Property Right Certificate” demonstrating that Party B is the registered title holder of the Premises; in which the Escrow Bank shall pay RMB 65,860,903.00 to the bank account designated by Party A after Party A’s submission of the aforesaid evidence proving that the property with property certificate number of “ShenFangDiZi No. 3000675817” is transferred to Party B’s name, and the Escrow Bank shall pay RMB 70,139,097.00 to the bank account designated by Party A after Party A’s submission of the aforesaid evidence proving that the property with property certificate number of “ShenFangDiZi No. 3000675591” is transferred to Party B’s name; or (b) Party A and Party B jointly issue payment instructions to order the Escrow Bank to pay the transfer price to the bank account designated by Party A.

 

  (C) Within one business day upon satisfaction of any one of the following conditions, the Escrow Bank shall pay the transfer price to the bank account designated by Party B: (a) expiration of 120 days after Party B’s actual payment of the escrow fund in full to the escrow account; or (b) Party A and Party B jointly issue payment instructions to order the Escrow Bank to pay the transfer price to the bank account designated by Party B.

Article 3 Registration Procedures of Transfer of the Premises

 

3.1 Party A and Party B both agree to respectively sign two copies of “Shenzhen Second-Hand House Sales Contract (2011 Sample Text)” (hereinafter the “Second-Hand House Sales Contract”) upon execution of the Agreement.

 

3.1 Within three business days after the payment of the total transfer price in full to the Escrow Bank by Party B pursuant to the Agreement, the Parties shall prepare all the application documents for the registration of the title transfer of the Premises and submit such documents to the Registration Center.

 

3.2 If the registration procedures of the title transfer of the Premises cannot be directly proceeded, the Parties agree to handle the follow-up matters of the Agreement in accordance with Article 7 of the Agreement.

Article 4 Leaseback of the Premises

 

4.1 As from the date of transfer of the Premises to Party B’s name (i.e. the date on which the Property Certificate showing Party B as the registered title holder of the Premises is obtained), Party B shall lease the Premises to Party A. Upon execution of the Agreement, the Parties shall sign the “Shenzhen Property Lease Contract” (hereinafter the “Lease Contract”) in respect of the leased Premises in accordance with the agreed conditions under the Agreement.

 

4.2 The lease term is four years, in which, during the first and second year of the lease term, Party A is entitled to unilaterally terminate the lease in respect of any one or multiple floors of the Premises (surrender of tenancy in advance on the basis of a whole floor(s)) by notifying Party B in writing four months in advance; during the third and fourth year of the lease term, Party A is entitled to unilaterally terminate the lease in respect of any one or multiple floors of the Premises (surrender of tenancy in advance on the basis of a whole floor(s)) by notifying Party B in writing three months in advance. In the meantime, Party A undertakes that from the beginning of the third year of the lease term, at least any one floor of the Premises (Party A may decide the specific floor(s) to be surrendered) shall be surrendered to Party B for Party B’s use.

 

4


4.3 The Parties both agree that the rental standards of the Premises shall be as follows:

 

  (1) Within the first and second year, Party A shall pay the rental to Party B on the basis of RMB 29.8/square meter of building area per month.

 

  (2) Within the third year, Party A shall pay rental to Party B on the basis of RMB 32.18 /square meter of building area per month.

 

  (3) Within the fourth year, Party A shall pay rental to Party B on the basis of RMB 34.76 /square meter of building area per month.

 

4.4 Party A shall pay the rental for the Premises to Party B in the following manner:

 

  (1) Within three business days after the actual receipt of the transfer price of the Premises in full by Party A, Party A shall pay the rental deposit for the Premises of RMB one million (RMB 1,000,000.00) to Party B.

 

  (2)

During the lease term, before the 15th day of each month, Party A shall pay the rental of such month to Party B.

 

4.5 Party B’s core obligations in respect of leasing the Premises are:

 

  (1) Within three business days after the surrender of tenancy and handover of any one or multiple floors of the Premises by Party A during the third and four year to Party B, Party B shall refund the rental deposit for the corresponding surrendered Premises to Party A.

 

  (2) After surrender of tenancy and handover of any one or multiple floors of the Premises by Party A during the third and four year to Party B, Party B shall undertake to maintain the reasonable use of the surrendered Premises, and shall undertake that a new user of the Premises will not generate poisonous, hazardous and contaminative substances and loud noise exceeding [80] decibels during process of production, which would affect Party A’s use of the remaining floor(s) of the Premises.

 

  (3) Party A shall be responsible for the property management of the Premises (including but not limited to Party A’s engagement of a property management company), provided that Party A leases more than three floors (not inclusive) of the Premises. Party B shall pay Party A the property management fee in respect of the surrendered Premises on the basis of RMB 2/square meter of building area per month (except for vacancy of the surrendered Premises) and Party A is entitled to directly deduct the corresponding amount from the rental payable to Party B. Party B shall be responsible for the property management of the Premises (including but not limited to Party B’s engagement of a property management company), provided that Party A leases three floors or less than three floors of the Premises. During the term of Party B’s property management of the Premises, if Party A then leases only one floor of the Premises, Party A does not need to pay the property management fee to Party B; if Party A then leases two or three floors of the Premises, Party A shall pay Party B the property management fee on the basis of RMB 1/square meter of building area per month.

 

5


  (4) Party B or any person designated by Party B shall not enter into the Premises leased by Party A without the consent of Party A; however, Party B is entitled to carry out an inspection tour in the Premises once a month (no more than two hours per tour) with Party A’s personnel’s company throughout the tour, provided that the normal production and business of Party A shall not be affected. Nevertheless, Party A undertakes to maintain lawful use of the Premises and cause no loss to Party B due to such use. In order to protect Party A’s trade secrets, Party B shall not take pictures or videos during the inspection tour, and Party B shall sign a confidentiality agreement with Party A regarding such matter.

Article 5 Handover of the Premises

 

5.1 Party B has examined the Premises and expressed its satisfaction regarding the current conditions of the Premises. The Parties agree to deem the date on which the registration for the title transfer of the Premises is completed as the date when Party A completes its handover of the Premises to Party B as it is in accordance with the requirements under the Second-hand House Sales Contract, which shall also be deemed as the date that Party B fulfills its handover obligations to Party A in accordance with the Lease Contract; the Parties further agree to enter into a “Confirmation Letter on Handover” at the above date. Party B shall bear the risks of destruction or loss of the Premises due to force majeure or accidental events on the date of the completion of the registration of the title transfer and Party B may purchase building property insurance for such risks.

 

5.2 Party A is not obliged to further hand over the Premises to Party B during the lease term and Party B shall not request Party A to hand over the Premises. Within three business days after the expiration of the lease (including Party A’s early termination of the lease of particular floors of the Premises), Party A shall hand over the relevant floors of the Premises to Party B at the then existing conditions of the Premises.

 

5.3 Party A shall, in normal means, use the equipment and facilities as referred to in Appendix 1 of the Agreement, the depreciation of which during the lease term shall be assumed by Party B. Excluding the equipment and facilities under Appendix 1, Party A shall have the ownership and disposal rights on various articles in the Premises, such as movable machines, equipment and facilities, etc.

Article 6 Taxes and Fees

 

6.1 All the transaction taxes and fees arising from the transfer and lease-back process of the Premises shall be assumed by the Parties respectively according to the law. The Parties shall pay the relevant taxes and fees within the term of payment as requested by the notice on payment of fees and taxes issued by the competent government authorities.

 

6


Article 7 Special Termination

 

7.1 In the event that any of the following events occur due to any reasons whatsoever, with the exception of Article 7.2, Article 7.3 and Article 8 of the Agreement, the Agreement, the Second-hand House Sales Contract and the Lease Contract further entered into by the Parties, shall be automatically terminated and shall no longer be legally binding upon the Parties:

 

  (1) where the registration procedures of the title transfer of the Premises are not actually completed and the Property Certificates showing Party B as the registered title holder are not obtained within 60 calendar days after the execution of the Agreement (i.e. until July 15, 2012) or any extended period otherwise mutually agreed by the Parties in writing; except that, during the above time period, the Registration Center has approved the registration of the transfer of the property rights and the failure to obtain the new Property Certificate is caused by one Party’s delay in paying the taxes in a timely manner; or

 

  (2) where the Registration Center does not issue the approval or handle the registration procedures of the title transfer of the Premises due to the reasons as stated under point 3 under “Whereas” section of the Agreement.

 

7.2 In the event that the relevant contracts are automatically terminated due to the occurrence of the events under Article 7.1 of the Agreement, the Parties shall handle the follow-up matters of the relevant contracts in the following means.

 

  (1) Within three business days, Party B shall return all the original copies of the Agreement, the Second-hand House Sales Contract and the Lease Contract it holds to Party A; in addition, the Parties shall jointly sign a confirmation letter regarding the automatic termination and invalidation of the Agreement, the Second-hand House Sales Contract and the Lease Contract. However, notwithstanding any Party’s failure to comply with this paragraph, the effect of the automatic termination of the relevant contracts shall not be affected.

 

  (2) Within three business days after the compliance with the arrangement as prescribed in paragraph (1) above, Party A shall assist Party B in notifying the Escrow Bank to remit all the funds in the escrow account to the bank account designated by Party B.

 

7


7.3 For avoidance of doubts, in the event that, during the term as specified under Article 7.1 (1) of the Agreement, the registration procedures of the title transfer of one of the Premises under either of the Property Certificates (ShenFangDiZi No. 3000675817 or ShenFangDiZi No. 3000675591) are completed, whereas the registration procedures of the title transfer of the Premises under the other Property Certificate fail to be completed, the Parties hereby unanimously confirm that:

 

  (1) where the relevant contracts are automatically terminated pursuant to the provisions under the Agreement, the termination only applies to the Second-hand House Sales Contract and the Lease Contract for the Premise the title transfer procedures of which have not been completed; the relevant provisions of the Second-hand House Sales Contract and the Lease Contract for the Premises the title transfer procedures of which have been completed shall remain valid.

 

  (2) Party A shall apply to transfer the Premises through listing in the Exchange Center within 60 calendar days (excluding the delays caused by the delayed governmental approval or force majeure events) after the automatic termination of the relevant contracts pursuant to Article 7.1 of the Agreement (the exact date shall be determined by the date when the Agency Transaction Agreement is entered into between Party A and the Exchange Center); meanwhile, notwithstanding any reasons that occur, Party B shall participate in the bidding in such listing with a price not lower than the relevant price as specified in Article 2.1 of the relevant Second-hand House Sales Contract, otherwise Party B shall compensate Party A with the liquidation damages in the amount of RMB 5,000,000 in a lump sum.

Article 8 Liabilities for Breach of Contract

 

8.1 Where any Party’s failure in performance or inappropriate performance of the Agreement causes losses to the other Party, the defaulting Party shall compensate the non-defaulting Party all the losses so suffered, including the expectation losses.

 

8.2 Where Party B fails to remit the full amount of the transfer price to the escrow account within the time limit as specified under Article 2.2 (2) A of the Agreement, Party A is entitled to terminate the Agreement, the Second-hand House Sales Contract and the Lease Contract immediately and request Party B to pay to Party A the liquidation damages equivalent to 20% (twenty percent) of the total amount of the transfer price of the Premises.

 

8.3 Where any Party is in violation with the time limit as specified under Article 3.2 of the Agreement and fails to submit to the Registration Center the application documents for the registration of the title transfer of the Premises in a timely manner after all the necessary documents are fully prepared, the Parties shall resolve the problem through amicable consultations, provided that the delay is less than 15 calendar days; in the event that the delay exceeds 15 calendar days, the non-defaulting Party is entitled to unilaterally request the termination of all the transaction documents, i.e. the Agreement, the Second-hand House Sales Contract and the Lease Contract, etc., in the event that the non-defaulting Party requests to terminate the transaction documents, the defaulting Party shall pay to the non-defaulting Party the liquidation damages equivalent to 2% (two percent) of the total amount of the transfer price of the Premises.

 

8


Article 9 Miscellaneous

 

9.1 Any document of the Parties shall be in writing and shall be delivered by mail if not by hand, and the mailing addresses shall be the following mailing addresses as confirmed by the Parties; where the mailing address of any Party has been changed without notification to the other Party, the notifying obligation of the other Party shall be deemed fulfilled when the delivery is made to the original address:

If to Party A, to:

Attention: Oclaro Technology (Shenzhen) Co., Ltd.

Mailing Address: No. 2 Fenghuang Road, Futian Bonded Zone, Shenzhen

Post Code: 518000

If to Party B, to:

Attention: Shenzhen Fangdao Technology Co., Ltd.

Mailing Address: Room 210, 2nd Floor East, No.211 Tairan Building, Chegongmiao Industry Zone, Futian District, Shenzhen.

Postcode: 518000

 

9.2 Any matter not specified under the Agreement shall be agreed by the Parties in the Second-hand House Sales Contract and the Lease Contract. Where there is any discrepancy between the provisions of the Agreement and the provisions of the Second-hand House Sales Contract and the Lease Contract, the provisions of the Agreement shall prevail.

 

9.3 In the event of any dispute arising from the Agreement, the Parties shall resolve the dispute through amicable consultations; where the dispute fails to be resolved through amicable consultations, either Party shall be entitled to refer the dispute to China International Economic and Trade Arbitration Commission, South China Sub-commission for arbitration. The arbitral award shall be final and binding upon the Parties.

 

9.4 Party A and Party B agree to comply with all the applicable laws and regulations. Notwithstanding the above sentence, Party A and Party B agree that either of the Parties will not take any action in violation with the anti-corruption orders, regulations or laws of the United States and China.

 

9.5 Party B shall be responsible for having Shenzhen Guang’an Liye Investment Co., Ltd. to assume the irrevocable joint and several liability to guarantee Party B’s performance of all the contractual obligations as prescribed under the Agreement. Party B shall be responsible for providing Party A with a guarantee letter on the joint and several liability and the relevant shareholder’s resolution issued by Shenzhen Guang’an Liye Investment Co., Ltd.

 

9


9.6 The Agreement shall become effective upon the execution and seal of both Parties. In addition, the validity of the Agreement shall be subject to Article 7 hereunder. The Agreement has two counterparts, with Party A and Party B each holding one copy with the same legal effect.

(the rest of this page intentionally left blank)

 

10


(Signature Page)

Party A: Oclaro Technology (Shenzhen) Co., Ltd.

Legal Representative (signature):

Party B: Shenzhen Fangdao Technology Co., Ltd.

Legal Representative (signature):

Place of Execution: Shenzhen, China

Date of Execution: May 15, 2012

 

11


Appendix 1: Auxiliary Equipment and Facilities of the Premises

 

    

Name

  

Model Number

  

Location

1    1# water chilling unit    19XR3737385CQS52    Chiller plant on the first floor
2    2# water chilling unit    19XR3737385CQS52    Chiller plant on the first floor
3    3# water chilling unit    19XR3737385CQS52    Chiller plant on the first floor
4    1# constant temperature and humidity air conditioner    H175    Air-conditioner room of new warehouse
5    2# constant temperature and humidity air conditioner    H175    Air-conditioner room of new warehouse
6    1# cooling tower    H600T    Roof
7    2# cooling tower    H600T    Roof
8    3# cooling tower    H600RT    Roof
9    Warehouse cooling tower    LRC.125×2.C    Roof
10    1# Chilled water pump    AEEBKA    Chiller plant on the first floor
11    2# Chilled water pump    AEEBPA040060FM-YB    Chiller plant on the first floor
12    3# Chilled water pump    AEEBKB040060FM-YB    Chiller plant on the first floor
13    1# cooling water pump    AEEBPA040050FM-YB    Chiller plant on the first floor
14    2# cooling water pump    AEEBPA040050FM-YB    Chiller plant on the first floor
15    3# cooling water pump    AEEBPA040050FM-YB    Chiller plant on the first floor
16    7-1 new air blower    AAHM05-10S    Seventh floor
17    3-1 new air blower    AH14MH    Third floor
18    3-2 new air blower    AH14MH    Third floor
19    4-1 new air blower    AH14MH    Fourth floor
20    4-2 new air blower    AH14MH    Fourth floor
21    5-1 new air blower    AH8MH 5000    Fifth floor
22    5-2 new air blower    AH8MH    Fifth floor
23    6-1 new air blower    AH8MH    Sixth floor
24    6-2 new air blower    AH8MH    Sixth floor
25    Third-floor air cooler    AH27MH 17000 283CMM    Third floor
26    Fourth-floor air cooler    AH27MH    Fourth floor

 

12


27    1-1 air cooler    AAJF26-H4R/S 25500 367CMM    First floor
28    1-2 air cooler       First floor
29    Fifth-floor air cooler    AH35MV 22000    Fifth floor
30    Sixth-floor air cooler    AH35MV    Sixth floor
31    7-3 air cooler    AAHM18-6S 17400    Seventh floor
32    7-4 air cooler    AAHM10-8S 10000    Seventh floor
33    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the third floor -1
34    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the third floor-1
35    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the third floor -2
36    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the third floor -2
37    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the fourth floor -1
38    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the fourth floor -1
39    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the fourth floor -2
40    Mixing pump    AEVBKA020015FMLP-YB    New air blower room on the fourth floor -2
41    Mixing pump    GRUNDFOS-LP100    New air blower room on the fifth floor -1
42    Mixing pump    GRUNDFOS-LP100    New air blower room on the fifth floor -1
43    Mixing pump    GRUNDFOS-LP100    New air blower room on the fifth floor -2
44    Mixing pump    GRUNDFOS-LP100    New air blower room on the fifth floor -2
45    Mixing pump    GRUNDFOS-LP100    New air blower room on the sixth floor -1
46    Mixing pump    GRUNDFOS-LP100    New air blower room on the sixth floor -1
47    Mixing pump    GRUNDFOS-LP100    New air blower room on the sixth floor -2
48    Mixing pump    GRUNDFOS-LP100    New air blower room on the sixth floor -2
49    No.1 living water pump    AKP0717C    Underground water pump room
50    No.2 living water pump    AKP0717C    Underground water pump room
51    No.1 fire pump    AKP1517C    Underground water pump room

 

13


52    No.2 fire pump    AKP1517C    Underground water pump room
53    No.1 spray pump    AKP1617C    Underground water pump room
54    No.2 spray pump    AKP1617C    Underground water pump room
55    No.1 living water pressure pump    3S32-2 --/3.0    Roof
56    No.2 living water pressure pump    3S32-2 --/3.0    Roof
57    No.1 Fire pressure-stabilizing pump    Y100L-2    Roof
58    No.2 Fire pressure-stabilizing pump    Y100L-2    Roof
59    Submersible pump       Underground water pump room
60    High voltage switchgear unit    ZS1    1F power distribution and transformer room
61    Diesel generator    135AZD    Diesel generator room on the first floor
62    Diesel generator    1120DFLC    New diesel generator room on the first floor
63    Diesel generator    1120DFLC    New diesel generator room on the first floor
64    1# transformer SCR-2000/10    ABB RESIBLOC dry-type transformer    1F power distribution and transformer room
65    2# transformer SCR-2000/10    ABB RESIBLOC dry-type transformer    1F power distribution and transformer room
66    3# transformer SCR-2000/10    ABB RESIBLOC dry-type transformer    1F power distribution and transformer room
67    1# passenger elevator    S0754VP17A    Elevator shaft
68    2# passenger elevator    S0754VP17A    Elevator shaft
69    3# goods elevator       Elevator shaft
70    4# passenger elevator    S0754VP17A    Elevator shaft
71    1# air compressor    ZT75    Chiller plant on the first floor
72    2# air compressor    ZT30    Chiller plant on the first floor
73    3# air compressor    ZT30    Chiller plant on the first floor

 

14


74    Drying machine       Chiller plant on the first floor
75    Drying machine    DX103    Chiller plant on the first floor
76    Drying machine    DX103    Chiller plant on the first floor
77    Gasholder    C-3    Chiller plant on the first floor
78    Vacuum pump    RA0100F    Vacuum pump room on the seventh floor
79    Vacuum pump    RA0100F    Vacuum pump room on the seventh floor
80    Vacuum pump    RA0202 D561 GQXX    Vacuum pump room on the seventh floor
81    Vacuum pump    RA0100E541    Vacuum pump room on the seventh floor
82    Vacuum pump    RA0100E541    Vacuum pump room on the seventh floor
83    Vacuum pump    RA0100E541    Vacuum pump room on the seventh floor
84    Access controller for door No.1       1F confidential room
85    Access controller for door No.2       4F-2MAU room
86    Access controller for door No.3       6F-2MAU room
87    Double door access controller    1F-TDC01    Confidential room
         Fire control room
88    Double door access controller    1F-TDC02    Dining hall barrier No.3
         Main equipment room
89    Double door access controller    1F-TDC05    Warehouse entrance
         Storage house for valuables
90    Double door access controller    1F-TDC03    Dining hall barrier No.2
         Dining hall barrier No.1
91    Double door access controller    1F-TDC04    Main entrance
         Warehouse for factory affairs
92    Double door access controller    1F-TDC17    Staircase No.1 on the third floor
         Office gate on the third floor

 

15


93    Double door access controller    1F-TDC19    IS equipment room in the third-floor office
         Staircase No.2 on the third floor
94    Double door access controller    1F-TDC20    Staircase No.3 on the third floor
         IS equipment room in the third-floor passage way
95    Double door access controller    1F-TDC21    Staircase No.1 on the fourth floor
         Office gate on the fourth floor
96    Double door access controller    1F-TDC22    IS equipment room in the fourth-floor office
         Staircase No.2 on the fourth floor
97    Double door access controller    1F-TDC23    Staircase No.3 on the fourth floor
         Empty
98    Double door access controller    1F-TDC6    Staircase No.1 on the fifth floor
         Office gate on the fifth floor
99    Double door access controller    1F-TDC7    Main IS equipment room on the fifth floor
         Empty
100    Double door access controller    1F-TDC8    IS equipment room on the fifth-floor office
         Empty
101    Double door access controller    1F-TDC9    Staircase No.1 on the sixth floor
         Financial department on the sixth floor
102    Double door access controller    1F-TDC10    IS equipment room on the sixth-floor office
         Office gate on the sixth floor

 

16


103    Double door access controller    1F-TDC11    Sales office on the sixth floor
         Research and development laboratory on the seventh floor
104    Double door access controller    1F-TDC12    Staircase No.1 on the seventh floor
         Staircase No.2 on the seventh floor
105    Double door access controller    1F-TDC13    Calibration room on the seventh floor
         Maintenance room on the seventh floor
106    Double door access controller    1F-TDC14    Personnel information room on the seventh floor
         Financial information room on the seventh floor
107    Double door access controller    1F-TDC15    Staircase No.2 on the fifth floor
         Staircase No.3 on the fifth floor
108    Double door access controller    1F-TDC16    Staircase No.2 on the sixth floor
         Staircase No.3 on the sixth floor
109    Double door access controller    1F-TDC29    Staircase No.3 on the seventh floor
         Office gate on the seventh floor
110    Double door access controller    11323-R/F-2Dr    Door No.1 on the roof
         Door No.2 on the roof
111    Double door access controller    31147-R/F-2Dr    Door No.3 on the roof
         Door No.4 on the roof
112    Double door access controller    40681-R/F-2Dr    Door No.5 on the roof
         Empty
113    No.1 elevator controller       South elevator machine room
   No.2 elevator controller       North elevator machine room

 

17


114    No.3 elevator controller       North elevator machine room
   No.4 elevator controller       North elevator machine room
115    Six video recorders       Security pavilion
   72 cameras      
116    Process water cooling pump    50GDLF16-13X7    Fourth floor
   Process water pump    Y132S1-2 B5    Fourth floor
117    Process water pump    132SB2-38FF265-C2    Fourth floor
   Process water cooling pump    50GDLF16-13X7    Fifth floor
118    Process water pump    Y132S1-2 B5    Fifth floor
   Process water cooling pump    132SB2-38FF265-C2    Fifth floor
119    TRANE air conditioner    GGAK1755D BNA    Roof
   TRANE air conditioner    GGAK1755D BNA    Roof

 