Amendment No. 9 to Amended and Restated System Equipment Purchase Agreement between Cricket Communications, Inc. and Lucent Technologies Inc.
This amendment updates the existing System Equipment Purchase Agreement between Cricket Communications, Inc. and Lucent Technologies Inc. It clarifies the scope of integration and support services related to equipment and software purchases, sets new pricing and terms for these services, and modifies invoicing and payment terms. The amendment also details the conditions under which certain technical support and consultancy services may be purchased. All other terms of the original agreement remain in effect unless specifically changed by this amendment.
SYSTEM EQUIPMENT PURCHASE AGREEMENT
§ | Core Integration Services: |
| Attachment A1 1xEV-DO Radio Network Controller (RNC) Integration SOW | ||
| Attachment A2 1xEV-DO L2 Switch Integration SOW | ||
| Attachment A3 1xEV-DO Aggregate Router Integration SOW | ||
| Attachment A4 1xEV-DO Cell Low Level Design SOW | ||
| Attachment A5 1xEV-DO Bulk Data Provisioning (BDP) SOW |
§ | BTS Integration Services: |
| Attachment B 1xEV-DO Cell Integration Service SOW |
§ | Support Services for [* * *] Integration: |
| BTS On-Site Integration Consultancy, if purchased by Owner, shall be provided at [* * *] per week [* * *] per Market. | ||
| BTS Remote Integration Consultancy, if purchased by Owner, shall be provided at [* * *] per week for [* * *] per Market. |
| Vendors BTS On-Site and BTS Remote Integration Consultancy shall be provided pursuant to the following Statement of Work. |
§ Attachment C 1xEV-DO Base Station Consultant SOW |
§ Attachment D BTS [* * *] Integration Remote Technical Support SOW |
| Provided Owner purchases both Services in a) above for any Market, the price for that Market for Vendors BTS [* * *] Integration Remote Technical Support shall be [* * *] for [* * *] months of Service. | ||
| Should Owner not purchase the Services in a) above for any Market, the price for that Market for Vendors BTS [* * *] Integration Remote Technical Support shall be [* * *] for [* * *] months of Service. |
§ Core Integration Services for up to [* * *] MSCs in Owners Amendment No. 8 Existing Markets. |
§ | BTS Integration Services for up to [* * *] carriers for Owners [* * *] Market ([* * *] of which may be for the [* * *] Market instead). |
| Attachment E1 Engineering and Installation MSC Core SOW | ||
| Attachment E2 Engineering and Installation BTS SOW |
Feature Name | Release | FID | ||
[* * *] | [* * *] | [* * *] |
Feature Name | Release | FID | ||
[* * *] | [* * *] | [* * *] |
Attachment A1
Attachment A2
Attachment A3
Attachment A4
Attachment A5
Attachment B
Attachment C
Attachment D
Attachment E1
Attachment E2
Attachment F
Attachment G
Attachment H
Exhibit 1
Exhibit 2
OWNER | VENDOR | |||||||||
Cricket Communications, Inc. | Lucent Technologies Inc. | |||||||||
By: | /s/ Dean M. Luvisa | By: | /s/ Ed L. Rhodes | |||||||
Name: Dean Luvisa | Name: Ed L. Rhodes | |||||||||
Title: CFO | Title: Contract Management Dir. | |||||||||
Date: 2/16/06 | Date: 03/01/06 |
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
(RNC) Integration
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
Table of Contents | ||||
1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 1XEV-DO RNC INTEGRATION | 4 | |||
2.1 Elements of Work and Lucent Responsibilities | 4 | |||
2.1.1 Description | 4 | |||
2.1.2 Tasks | 4 | |||
2.1.3 Deliverables | 5 | |||
2.2 Customer Responsibilities | 5 | |||
2.3 Schedule / Timeline | 6 | |||
2.4 Exclusions | 6 | |||
2.5 Assumptions | 7 | |||
2.6 Service-Specific Acceptance | 7 | |||
3 GENERAL TERMS | 8 | |||
3.1 Conditions | 8 | |||
3.2 Change Management | 8 | |||
3.3 Acceptance/Warranty | 8 | |||
4 PRICING SECTION | 9 | |||
4.1 Pricing Notes | 9 | |||
4.2 Pricing | 9 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
q | Configure the RNC LLD data (i.e. IP addressing and subnet assignments) into the RNC elements (i.e. Application Processors APs and Traffic Processors TPs) | |
q | Download and install the 1xEV-DO RNC and base station software for the test cell only. | |
q | Configure the 1xEV-DO network elements (RNC) including one test cell via the Element Management System (EMS) |
q | Verify 1xEV-DO elements OA&M is operational via EMS from the OMP-FX including alarms, provisioning and status information |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
q | Audit the RNC for connectivity issues | |
q | Verify a successful 1xEV-DO Simple Internet Protocol (SIP) or Mobile IP (MIP) data call from the test base station. |
q | Provide a Method of Procedure (MOP)/exit criteria document describing the process for the service as well as testing. Customer must sign off on the document once service is considered complete. | |
q | Provide a 1xEV-DO Customer Network Design Document (CNDD) after the RNC LLD is completed providing the following information: |
| An executive summary, which briefly describes and summarizes the designed 1xEV-DO RNC |
| A Network Diagram that depicts the 1X EV-DO RNC network |
| Detailed design on the 1xEV-DO RNC on the following topics: |
Ø | Complete IP addressing (subnet size, private versus public, gateway) | ||
Ø | Port Assignments | ||
Ø | VLAN information | ||
Ø | STP information | ||
Ø | NTP and SNMP information | ||
Ø | NMS information | ||
Ø | General information | ||
Ø | Customer network demarcation connection |
q | Provide a contact to complete the RNC LLD questionnaire with 100% of the data needed and return to Lucent 3 weeks before the start of RNC integration | |
q | Provide a contact to complete the RNC entrance criteria checklist and return to Lucent 2 weeks before the start of RNC integration | |
q | Provide physical access with the appropriate login/password as well as security permissions to the 1xEV-DO RNC as well as the OMP-FX | |
q | Provide office space and facilities (desk, telephone, modem access line and fax machine) for Lucent use | |
q | Ownership of non-Lucent equipment provided in the solution such as routers, switches, PDSNs, HAs, etc. This equipment must be provisioned to support 1xEV-DO functionality prior to Lucent arriving to perform the RNC integration |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
q | Establishing connectivity to a test cell to be used for call processing testing | |
q | Providing 1xEV-DO access terminals to place test calls | |
q | Responsible for monitoring and maintaining the 1X-EVDO RNC network immediately following the acceptance of the 1X-EVDO RNC |
q | Customer and Lucent will mutually agree in advance on project schedules or start date before commencement of work. | |
q | Lucent personnel will begin work after acceptance of Customers purchase order and Customers completion of any pre-conditions for which Customer is responsible under this SOW. | |
q | Provision of the service is subject to a minimum lead-time of 4 weeks after purchase order acceptance. After purchase order acceptance, Lucent will propose a specific schedule for Customers concurrence. If the parties have not agreed upon another delivery timetable within 2 weeks from acceptance of the purchase order, then the service will be delivered according to the schedule proposed by Lucent. |
q | Once the customer has signed off the design, any changes to the design will be treated as new requests for services and be governed by the change control section in this SOW | |
q | The design of the OA&M network (i.e. OMP-FX to NOC) is not part of the RNC LLD design | |
q | Although this service does not include network security assessment, the design includes the security embedded in the RNC product. If a solution security assessment and design is needed, separate security services must be purchased | |
q | The design does not include any other elements included in the 1xEV-DO data network (e.g., Aggregate Routers = ARs, switches, PDSNs, HAs, backhaul or transport network elements, firewalls, AAA, DHCP, DNS, LNS). An additional design service may be purchased for these elements from Lucent | |
q | This service does not perform the design for cell growth. The 1xEV-DO RNC Integration with Cell Design service should be purchased to perform cell design with RNC integration. In addition, the 1xEV-DO Bulk Data Provisioning (BDP) service needs to be purchased to implement the cell design |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
q | Training of customer staff is not included within this SOW | |
q | The RNC LLD will be performed once. Therefore, it is crucial the customer provides 100% of the data in the design worksheet 3 weeks before the start of the RNC integration. If 100% of the data is not received, then the customer either agrees to delay the integration until all of the data is received or pays additional fees to add the late data. In addition, revisions to the design worksheet after it has been received by Lucent will require additional fees. Lucent will not add or revise the design data once the completed design worksheet is received until additional POs are received. | |
q | The RNC LLD is performed based on the data in the design worksheet. Growth of cells will be treated as a separate service. | |
q | Assume purchase of Low Level Design Service as provided under separate Scope of Work. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. | |
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. | |
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)
![]() | ||
Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
q | ||
q | All prices are in $US, unless stated otherwise. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A1_EVDO RNC Int-111105(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
Table of Contents | ||||||||||||
1 | INTRODUCTION | 3 | ||||||||||
Description of Services | 4 | |||||||||||
2 | 1XEV-DO L2 SWITCH INTEGRATION | 4 | ||||||||||
2.1 | Elements of Work and Lucent Responsibilities | 4 | ||||||||||
2.1.1 | Description | 4 | ||||||||||
2.1.2 | Tasks | 4 | ||||||||||
2.1.3 | Deliverables | 5 | ||||||||||
2.2 | Customer Responsibilities | 6 | ||||||||||
2.3 | Schedule / Timeline | 7 | ||||||||||
2.4 | Exclusions | 7 | ||||||||||
2.5 | Assumptions | 8 | ||||||||||
2.6 | Service-Specific Acceptance | 8 | ||||||||||
3 | GENERAL TERMS | 8 | ||||||||||
3.1 | Conditions | 8 | ||||||||||
3.2 | Change Management | 9 | ||||||||||
3.3 | Warranty | 9 | ||||||||||
4 | PRICING SECTION | 10 | ||||||||||
4.1 | Pricing Notes | 10 | ||||||||||
4.2 | Pricing | 10 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
q | Send a design questionnaire soliciting the appropriate data to complete the LLD. |
q | Determine the Virtual Local Area Network (VLAN) assignments |
q | Determine the physical I/O cards location on the L2 switches |
q | Determine the slot/port connectivity for each 1xEV-DO network element connecting to the L2 switch |
q | Determine the appropriate IP addresses needed to support 1xEV-DO |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
q | Determine the trunk configuration between the L2 switches |
q | Determine the Spanning Tree Protocols (STP) details, if needed |
q | Determine the L2 switch basic system parameters such as host name, management IP address, login and telnet passwords |
q | Determine the Network Time Protocol (NTP) and Simple Network Management Protocol (SNMP) configuration details |
q | Determine the appropriate connectivity of the L2 switches with the Network Management System (NMS). |
q | Verify the L2 switches are functional from a hardware perspective |
q | Load the most recent software into the L2 switches |
q | Configure the routers based on the data supplied by the customer in the design worksheet |
q | Verify the connectivity between the L2 switches |
q | Verify the connectivity between the L2 switches and Aggregation Routers (ARs) |
q | Verify the connectivity between the L2 switches and 1xEV-DO Radio Network Controller (RNC) |
q | Verify NTP and SNMP configuration (if applicable) |
q | Work with the customer to test a basic level of Operations, Administration and Maintenance (OA&M) functionality. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
q | Provide a Method of Procedure (MOP)/exit criteria document describing the process for the service as well as testing. Customer must sign off on the document once service is considered complete. |
q | Provide a 1xEV-DO L2 Switch Customer Network Design Document (CNDD) after the LLD is completed providing the following information: |
| An executive summary, which briefly describes and summarizes the designed L2 switch network | |
| A Network Diagram that depicts the L2 switches | |
| Detailed design on the L2 switches on the following topics: |
Ø | IP addressing | |
Ø | Port Assignments | |
Ø | VLAN information | |
Ø | Trunk information | |
Ø | STP information | |
Ø | NTP and SNMP information | |
Ø | NMS information | |
Ø | General information | |
Ø | Customer network demarcation connection |
q | Start date when the L2 switch service can be performed |
q | Installation and turn up of the L2 switches |
q | Physical access to the area in which the L2 switches will be located |
q | System Administrator and Network Engineer (or equivalent resource authorized by Customer) to work with Lucent on the testing of the network, OA&M network and L2 switch to ER and MSC |
q | Configuration of network between the ARs and L2 switches as well as L2 switches and MSC, if not directly connected |
q | Configuration of the OA&M network used to monitor and configure the L2 switches |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
q | Customer resource to complete the design questionnaire and work with the assigned Lucent design engineer and Customer Program Manager to return the questionnaire to Lucent, minimally, 5 weeks prior to scheduled integration |
q | System Administrator and Network Engineer (or equivalent resource authorized by Customer) to review and sign off that the integration and testing steps in the Lucent Technologies provided MOP and Exit Criteria are a satisfactory description of the service that will be performed as stated in this SOW |
q | Customer and Lucent will mutually agree in advance on project schedules or start date before commencement of work. |
q | Lucent personnel will begin work after acceptance of Customers purchase order and Customers completion of any pre-conditions for which Customer is responsible under this SOW. |
q | Provision of the service is subject to a minimum lead-time of 4 weeks after purchase order acceptance. After purchase order acceptance, Lucent will propose a specific schedule for Customers concurrence. If the parties have not agreed upon another delivery timetable within 2 weeks from acceptance of the purchase order, then the service will be delivered according to the schedule proposed by Lucent. |
q | The customer will have to resolve issues if the L2 switch is not functional. Lucent will assist in the identification and isolation of an issue but does not own the resolution. |
q | Once the design has been signed off by the customer, any changes to the design will require additional services to modify the design |
q | Lucent will only be responsible for the verification of connectivity to the ARs and 1xEV-DO RNC. Lucent is not be responsible for resolving error conditions on the network. |
q | The service will configure the L2 switches to interface with the appropriate NMS ([***] NMS). A separate service is available to integrate the NMS platform. |
q | This service when purchased as a standalone service will only provide a SDD. When Lucent is performing an end-to-end deployment, the SDD information will be contained in |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
a 1xEV-DO Customer Network Design Document (CNDD). |
q | Training of customer staff is not included within this SOW |
q | The LLD will be performed once. Therefore, it is crucial the customer provides 100% of the data in the design worksheet 5 weeks before the start of the L2 switch integration. If 100% of the data is not received, then the customer either agrees to delay the integration until all of the data is received or pays additional fees to add the late data. In addition, revisions to the design worksheet after it has been received by Lucent will require additional fees. Lucent will not add or revise the design data in the routers once the completed design worksheet is received until additional POs are received. |
q | The LLD is performed based on the data in the design worksheet. Growth will be treated as a separate service. |
q | Assumes the purchase of the Low Level Design service as provided under separate Scope of Work |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. |
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. |
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06000044A1 |
q |
q | All prices are in $US, unless stated otherwise. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A2_EVDO L2 Switch(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
Table of Contents | ||||||||||||
1 | INTRODUCTION | 3 | ||||||||||
Description of Services | 4 | |||||||||||
2 | 1XEV-DO AR INTEGRATION | 4 | ||||||||||
2.1 | Elements of Work and Lucent Responsibilities | 4 | ||||||||||
2.1.1 | Description | 4 | ||||||||||
2.1.2 | Tasks | 4 | ||||||||||
2.1.3 | Deliverables | 6 | ||||||||||
2.2 | Customer Responsibilities | 7 | ||||||||||
2.3 | Schedule / Timeline | 7 | ||||||||||
2.4 | Exclusions | 8 | ||||||||||
2.5 | Assumptions | 8 | ||||||||||
2.6 | Service-Specific Acceptance | 9 | ||||||||||
3 | GENERAL TERMS | 9 | ||||||||||
3.1 | Conditions | 9 | ||||||||||
3.2 | Change Management | 10 | ||||||||||
3.3 | Warranty | 10 | ||||||||||
4 | PRICING SECTION | 11 | ||||||||||
4.1 | Pricing Notes | 11 | ||||||||||
4.2 | Pricing | 11 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
q | Send a design questionnaire soliciting the appropriate data to complete the LLD. |
q | Determine the physical locations of interconnection between the ARs, ARs to cell network, ARs to Layer 2 Switches (L2), and ARs the Operations, Administration and Maintenance (OA&M) network |
q | Determine the Quality of Service (QOS) parameters |
q | Determine the Virtual Local Area Network (VLAN) assignments |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
q | Determine the configuration details of routers redundancy protocols such as Virtual Router Redundancy Protocol (VRRP) or Hot Standy Router Protocol (HSRP), whichever applicable |
q | Determine the appropriate routing protocol (if necessary) such as Border Gateway Protocol (BGP), and Open Shortest Path First (OSPF) based on the customer implementation and network requirements |
q | Determine the cell sites to the routers mapping at the individual T1 level |
q | If applicable, determine the appropriate cell sites to router mapping to support the Multi-Router Automatic Protection Switching (MR-APS) or intra-chassis APS configuration for OC-3 or OC-12 interface |
q | Determine the necessary configuration information to support the redundant Aggregate Routers architecture based on customer requirements |
q | Determine the appropriate Simple Network Management Protocol (SNMP), and Network Time Protocol (NTP) configuration |
q | Determine the general system parameters such as hostname, login and telnet passwords |
q | Verify the routers are functional from a hardware perspective |
q | Configure the routers based on the data supplied by the customer in the design worksheet |
q | Verify the connectivity between the AR and each 1xEV-DO Radio Network Controller (RNC) Application Processor (AP) for both ARs |
q | Verify the connectivity for all T1s between the AR and the DACS for both ARs |
q | Verify connectivity between the ARs and ONE test base station (i.e. cell) |
Lucent Proprietary and Confidential
Copyright© 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
q | Verify connectivity between the AR and access routers for both ARs (if applicable) |
q | Verify Open Shortest Path First (OSPF) configuration between the ARs (if applicable) |
q | Verify connectivity on the redundant links between the ARs |
q | Load and verify Border Gateway Protocol (BGP) between the AR and the access routers for both ARs |
q | Verify VRRP or HSRP configuration between the ERs. |
q | Verify NTP and SNMP configuration (if applicable) |
q | Verify the Multi-Router (MR-APS) configuration between the ARs and the DACS |
q | Work with the customer to test a basic level of Operations, Administration and Maintenance (OA&M) functionality. |
q | Provide a Method of Procedure (MOP)/exit criteria document describing the process for the service as well as testing. Customer must sign off on the document once service is considered complete. |
q | Provide a section in the Customer Network Design Document (CNDD) after the LLD is completed providing the following information: |
| An executive summary, which briefly describes and summarizes the designed AR network | |
| A Network Diagram that depicts the ARs | |
| Detailed design on the ARs on the following topics: |
Ø | IP addressing | ||
Ø | Port Assignments | ||
Ø | VLAN information | ||
Ø | QOS parameters | ||
Ø | VRRP or HSRP information | ||
Ø | BGP and/or OSPF information | ||
Ø | Cell to router mapping | ||
Ø | NTP and SNMP information |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
Ø | Multi-Router APS information | |
Ø | NMS information | |
Ø | General system information | |
Ø | Customer network demarcation connection |
q | Start date when the AR service can be performed |
q | Installation and turn up of the ARs |
q | Physical access to the area in which the ARs will be located |
q | System Administrator and Network Engineer (or equivalent resource authorized by Customer) to work with Lucent on the testing of the T1 network, OA&M network and AR to cell and Layer 2 Switches |
q | Configuration of T1 network including the DACS and other equipment interconnecting to the ARs |
q | Configuration of the switches or other equipment (if applicable) interconnecting to the ARs |
q | Configuration of the OA&M network used to monitor and configure the ARs |
q | Customer resource to complete the design questionnaire and work with the assigned Lucent design engineer and Customer Program Manager to return the questionnaire to Lucent, minimally, 5 weeks prior to scheduled integration |
q | System Administrator and Network Engineer (or equivalent resource authorized by Customer) to review and sign off that the integration and testing steps in the Lucent Technologies provided MOP and Exit Criteria are a satisfactory description of the service that will be performed as stated in this SOW |
q | Customer and Lucent will mutually agree in advance on project schedules or start date before commencement of work. |
q | Lucent personnel will begin work after acceptance of Customers purchase order and |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
Customers completion of any pre-conditions for which Customer is responsible under this SOW. |
q | Provision of the service is subject to a minimum lead-time of 4 weeks after purchase order acceptance. After purchase order acceptance, Lucent will propose a specific schedule for Customers concurrence. If the parties have not agreed upon another delivery timetable within 2 weeks from acceptance of the purchase order, then the service will be delivered according to the schedule proposed by Lucent. |
q | The customer will have to resolve issues if the router is not functional. Lucent will assist in the identification and isolation of an issue but does not own the resolution. |
q | Lucent will only be responsible for the verification of connectivity to the T1 network. Lucent is not be responsible for resolving error conditions on the T1s or integration of facilities. Lucent will only test the T1s, which are available at the time of AR integration. |
q | Once the design has been signed off by the customer, any changes to the design will require additional services to modify the design |
q | Lucent will only be responsible for the verification of connectivity to the T1 network. Lucent is not be responsible for resolving error conditions on the T1s or integration of facilities. Lucent will only test the T1s, which are available at the time of ER integration. |
q | The service will configure the ERs to interface with the appropriate Network Management System (NMS) ([***] NMS). A separate service is available to integrate the NMS platform. |
q | A 1xEV-DO Aggregate Routers Design Document (ARDD) will be provided if CNDD doesnt exist in that market. |
q | Assumes purchase of Low Level Design Service as provided in separate Scope of Work. |
q | Training of customer staff is not included within this SOW |
q | The LLD will be performed once. Therefore, it is crucial the customer provides 100% of |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
the data in the design worksheet 5 weeks before the start of the dual router integration. If 100% of the data is not received, then the customer either agrees to delay the dual router integration until all of the data is received or pays additional fees to add the late data. In addition, revisions to the design worksheet after it has been received by Lucent will require additional fees. Lucent will not add or revise the design data in the routers once the completed design worksheet is received until additional POs are received. |
q | The LLD is performed based on the number of base stations supplied in the design worksheet. Growth of base stations to the routers will be treated as a separate service. |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. |
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. |
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket 1XEV-DO | STARS #: MWS-06-000044A1 |
4 | Pricing Section | |
4.1 | Pricing Notes | |
q | ||
q | All prices are in $US, unless stated otherwise. | |
4.2 | Pricing |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A3_EVDO AR(11-04-05)(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 1XEV-DO CELL LOW LEVEL DESIGN (LLD) SERVICE | 4 | |||
2.1 Elements of Work and Lucent Responsibilities | 4 | |||
2.1.1 Description | 4 | |||
2.1.2 Tasks | 4 | |||
2.1.3 Deliverables | 5 | |||
2.2 Customer Responsibilities | 5 | |||
2.3 Schedule / Timeline | 5 | |||
2.4 Exclusions | 6 | |||
2.5 Assumptions | 6 | |||
2.6 Service-Specific Acceptance | 6 | |||
3 GENERAL TERMS | 7 | |||
3.1 Conditions | 7 | |||
3.2 Change Management | 7 | |||
3.3 Acceptance/Warranty | 7 | |||
4 PRICING SECTION | 8 | |||
4.1 Pricing Notes | 8 | |||
4.2 Pricing | 8 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
2 | 1xEV-DO Cell Low Level Design (LLD) Service |
2.1 | Elements of Work and Lucent Responsibilities |
2.1.1 | Description |
2.1.2 | Tasks |
q | Send a design questionnaire soliciting the appropriate data to complete the LLD |
q | Determine the physical locations of interconnection between the RNC and the Layer 2 Switches or aggregate router (AR) for the cell backhaul network, the RNC and OMP-FX network for OA&M functionality and the RNC to router for the transport network (i.e. Packet Data Service Node PDSN, Home Agent HA) |
q | Determine the IP addressing and subnet assignments for the RNC internal and external networks |
q | Determine the IP addressing and subnet assignments for each base station. |
q | Determine the Virtual Local Area Network (VLAN) assignments |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
q | Determine the base station to RNC Application Processor (AP) assignments |
2.1.3 | Deliverables |
q | Provide a 1xEV-DO Customer Network Design Document (CNDD) after the LLD is completed providing the following information: |
| An executive summary, which briefly describes and summarizes the designed 1xEV-DO network |
| Detailed design on the 1xEV-DO RAN on the following topics: |
Ø | Complete IP addressing (subnet size, private versus public, gateway) | ||
Ø | Port Assignments | ||
Ø | VLAN information | ||
Ø | Base station to AP assignments | ||
Ø | STP information | ||
Ø | NTP and SNMP information | ||
Ø | NMS information | ||
Ø | General information | ||
Ø | Customer network demarcation connection |
2.2 | Customer Responsibilities |
q | Provide three contacts (IP engineer, cell engineer and RF engineer) to complete the LLD questionnaire with 100% of the data needed and return to Lucent 5 weeks (for an average system of 200 cells or less) before the start of RNC integration |
q | Provide physical access with the appropriate login/password as well as security permissions to the 1xEV-DO RNC as well as the OMP-FX |
2.3 | Schedule / Timeline |
q | Customer and Lucent will mutually agree in advance on project schedules or start date before commencement of work. |
q | Lucent personnel will begin work after acceptance of Customers purchase order and Customers completion of any pre-conditions for which Customer is responsible under this SOW. |
q | Provision of the service is subject to a minimum lead-time of 4 weeks after purchase order acceptance. After purchase order acceptance, Lucent will propose a specific |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
schedule for Customers concurrence. If the parties have not agreed upon another delivery timetable within 2 weeks from acceptance of the purchase order, then the service will be delivered according to the schedule proposed by Lucent. |
2.4 | Exclusions |
q | Once the customer has signed off the design, any changes to the design will be treated as new requests for services and be governed by the change control section in this SOW. Therefore, any late cells (data not received), additional cells (new cells) or changes to the LLD questionnaire after it has been returned to Lucent will be treated as new requests for services. |
q | The design of the OA&M network (i.e. OMP-FX to NOC) is not part of this low-level design |
q | Although this service does not include network security assessment, the design includes the security embedded in the RNC product. If a solution security assessment and design is needed, separate security services must be purchased |
q | The design does not include any other elements included in the 1xEV-DO data network (e.g., ARs, switches, PDSNs, HAs, backhaul or transport network elements, firewalls, AAA, DHCP, DNS, LNS). An additional design service may be purchased for these elements from Lucent |
q | This service does not implement the design for cells. The 1xEV-DO Bulk Data Provisioning (BDP) service, if purchased, will implement the cell design |
2.5 | Assumptions |
q | Training of customer staff is not included within this SOW |
q | The LLD will be performed once. Therefore, it is crucial the customer provides 100% of the data in the design worksheet 5 weeks for an average market size before the start of the RNC integration. If 100% of the data is not received, then the customer either agrees to delay the integration until all of the data is received or pays additional fees to add the late data. In addition, revisions to the design worksheet after it has been received by Lucent will require additional fees. Lucent will not add or revise the design once the completed design worksheet is received until additional POs are received. |
q | The LLD is performed based on the data in the design worksheet. Growth will be treated as a separate service |
2.6 | Service-Specific Acceptance |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
3 | General terms |
3.1 | Conditions |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. |
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. |
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
3.2 | Change Management |
3.3 | Acceptance/Warranty |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Cricket Albuquerque 1XEV-DO | STARS #: MWS-06-000044-A1 |
4 | Pricing Section |
4.1 | Pricing Notes |
q |
q | All prices are in $US, unless stated otherwise. |
4.2 | Pricing |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A4_EVDO LLD-111105(1-11-06)

Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 1XEV-DO BDP | 4 | |||
2.1 Elements of Work and Lucent Responsibilities | 4 | |||
2.1.1 Description | 4 | |||
2.1.2 Tasks | 4 | |||
2.1.3 Deliverables | 5 | |||
2.2 Customer Responsibilities | 5 | |||
2.3 Schedule / Timeline | 5 | |||
2.4 Exclusions | 5 | |||
2.5 Assumptions | 6 | |||
2.6 Service-Specific Acceptance | 6 | |||
3 GENERAL TERMS | 6 | |||
3.1 Conditions | 6 | |||
3.2 Change Management | 7 | |||
3.3 Warranty | 7 | |||
4 PRICING SECTION | 8 | |||
4.1 Pricing Notes | 8 | |||
4.2 Pricing | 8 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

q | Send a BDP questionnaire soliciting the appropriate data to complete the BDP | |
q | Hold periodic conference calls with the customer to discuss and obtain the correct data within the questionnaire to complete the BDP scripts | |
q | Build the BDP scripts for execution. Scripts may include one or more of the following data depending upon the work involved: |
| Cell configuration data for the equipage and operating parameters used by 1xEV-DO modcells | ||
| Lucent recommended and default RF translations parameters documented in the 1XEV-DO RF Translations Application Notes or those specified by the customer | ||
| Customer provided RF NL information |
q | Execute the BDP scripts on the OMP-FX |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

q | BDP questionnaire to obtain the necessary data to build the information | |
q | An excel spreadsheet documenting all the RNC/cell/RF information. The spreadsheet is resident within the 1xEV-DO Customer Network Design Document (CNDD) |
q | Providing three points of contacts (Switch Technicians, Cell Engineer and RF engineer) to complete the BDP questionnaire with 100% of the data needed. The points of contact must be identified and data provided to Lucent no latter than 3 weeks (for an average system of 200 cells or less) prior to the scheduled start of the BDP service. | |
q | Notifying Lucent of a start date for which the BDP scripts will be needed (i.e. 1xEV-DO Radio Network Controller (RNC) integration date, cell integration or RF neighbor update start date) | |
q | Providing Lucent with remote access with the appropriate login/password and security permissions to the 1xEV-DO RNC and the OMP-FX. |
q | Customer and Lucent will mutually agree in advance on project schedules or start date before commencement of work. | |
q | Lucent personnel will begin work after acceptance of Customers purchase order and Customers completion of any pre-conditions for which Customer is responsible under this SOW. | |
q | Provision of the service is subject to a minimum lead-time of 4 weeks after purchase order acceptance. After purchase order acceptance, Lucent will propose a specific schedule for Customers concurrence. If the parties have not agreed upon another delivery timetable within 2 weeks from acceptance of the purchase order, then the service will be delivered according to the schedule proposed by Lucent. |
q | Once the BDP questionnaire has been signed off by the customer, any changes to the BDP work will require additional services | |
q | Validity and accuracy of neighbor list information is only guaranteed when Lucent Technologies performs RF Optimization service under a separate Statement of Work |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

q | Training of customer staff is not included within this SOW | |
q | The BDP will be performed once. Therefore, it is crucial the customer provides 100% of the data in the BDP worksheet 3 weeks before the start of the BDP. If 100% of the data is not received, then the customer either agrees to delay the BDP until all of the data is received or pays additional fees to add the late data. In addition, revisions to the BDP worksheet after it has been received by Lucent will require additional fees. Lucent will not add or revise the design data in the once the completed BDP worksheet is received until additional POs are received. | |
q | The BDP is performed based on the data in the BDP worksheet. Any late cells (data not received), additional cells (new cells) or changes to the BDP questionnaire after it has been returned to Lucent will be treated as new requests for services and be governed by the change control section in this SOW | |
q | The BDP questionnaire includes RF neighbor list information | |
q | A dump of the existing wireless system(s) may be used to obtain all or portions of the data needed to build the BDP scripts. |
2.6 | Service-Specific Acceptance |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. | |
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

4.1 | Pricing Notes | |
o | ||
o | All prices are in $US, unless stated otherwise. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att A5_EVDO BDP(11-04-05)(1-11-065)

Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 1XEV-DO CELL INTEGRATION SERVICE | 4 | |||
2.1 Elements of Work and Lucent Responsibilities | 4 | |||
2.1.1 Description | 4 | |||
2.1.2 Tasks | 4 | |||
2.1.3 Deliverables | 5 | |||
2.2 Customer Responsibilities | 5 | |||
2.3 Schedule / Timeline | 7 | |||
2.4 Exclusions | 7 | |||
2.5 Assumptions | 7 | |||
2.6 Service-Specific Acceptance | 7 | |||
3 GENERAL TERMS | 8 | |||
3.1 Conditions | 8 | |||
3.2 Change Management | 8 | |||
3.3 Warranty | 9 | |||
4 PRICING SECTION | 9 | |||
4.1 Pricing Notes | 9 | |||
4.2 Pricing | 9 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

q Provision cell IP addressing scheme. | ||
q Once connectivity is established, download the appropriate 1xEV-DO cell generic. | ||
q Calibrate 1xEV-DO cell output power with assistance from field technicians for all applicable configurations. |
q | Perform cell alarm tests to verify that each configured alarm is being reported properly to the Element Management System (EMS) for all applicable configurations. | |||
q | Perform call-processing tests on a per sector basis to verify the 1xEV-DO cell site is capable of completing a Simple Internet Protocol (SIP) or Mobile IP (MIP) data call. | |||
q | Provide [***] cell integration technical support to resolve any alarm conditions related to 1xEV-DO carrier integration. | |||
q | Perform File Transfer Protocol (FTP) closed loop testing on [***] 1xEV-DO cells determined by the Lucent Radio Frequency (RF)/Cell integration teams for market size of greater than [***] cell sites when Lucent RF Optimization services are purchased. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

q A mutually agreed upon schedule for the integration activity. | ||
q A service completion verification form on the cell integration activity. |
q | Provide the start date when the 1xEV-DO cell integration can be performed. | |||
q | Complete a cell integration design questionnaire and provide to Lucent 2 weeks prior to the cell integration start date. | |||
q | Add the 1xEV-DO cell configuration data into the 1xEV-DO Radio Network Controller (RNC) database via EMS, if the 1xEV-DO Bulk Data Provisioning (BDP) service is not purchased from Lucent. | |||
q | Establish physical connectivity between the cell and the Radio Network Controller (RNC), including provisioning of the Aggregation Routers (ARs). | |||
q | Ensure following cell site preparation issues are resolved prior to cell integration activities: |
Ø | Update 3G1x Executive Cellular Processor (ECP) translations to meet 1xEV-DO hardware requirements for all mixed-mode cell configurations prior to 1xEV-DO cell integration. | ||
Ø | Ensure antennas are connected to the 1xEV-DO carrier/cell. | ||
Ø | Ensure all T1 facilities are provisioned and any issues with DACS cross connect, cabling, and loop backs are resolved prior to cell integration. | ||
Ø | Ensure AR(s) and Ethernet switch(es) are integrated and configured for cell connectivity. |
q | Perform loop back test from RNC to cell site Channel Switch Unit (CSU) to ensure no cell connectivity issues exist prior to scheduling each cell site for integration. | |||
q | Provide dedicated data network engineer(s) to address cell connectivity issues including AR(s), Ethernet Switch(s), Packet Data Service Nodes (PDSNs) and Home Agent (HA) configurations during cell integration activity, unless Lucent has been contracted to perform this service under a separate SOW. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

q | Provide field switch technician(s) to resolve any DACS/T1 issues during cell integration activity. | |||
q | Provide physical access to cell sites for Lucent field technicians to perform required integration and troubleshooting activities. | |||
q | Participate in pre-integration meetings with Lucent Program Management (PM) and integration engineers to discuss integration activities, roles and responsibilities. | |||
q | Provide an agreed upon cell integration schedule [***] business days prior to the start of work. | |||
q | Provide a maintenance window of [***] hours per cell for configurations that require a maintenance window (i.e., 1xEV-DO on legacy modcells, growth modcells). | |||
q | Provide stable and timely remote access to the 1xEV-DO network upon request. This is required in order to complete cell integration in a timely and efficient manner. | |||
q | Immediately following cell integration, assume responsibility for monitoring and maintaining the cell site. | |||
q | Provide Lucent field technicians supporting cell integrations with 1xEV-DO access terminals to perform call through testing. A minimum of 3 access terminals or more, depending on the quantity of cell integrations, is required. | |||
q | To support FTP closed loop testing activities when performed: |
Ø | Provide a minimum of one provisioned access terminal (AirCards) per Lucent integration team. | ||
Ø | Allow access to an FTP server internal to the network for Lucent to perform the FTP closed loop testing. | ||
Ø | Provide maps and drive routes to 1xEV-DO cell site locations selected. |
q | During planning stages, provide remote access with the appropriate login/password as well as security permissions with read/write capability to the 1xEV-DO RNC as well as the OMP-FX. Provide access to the following: |
Ø | EMS GUI Web | ||
Ø | Command Line Interface (CLI) | ||
Ø | 1xEV-DO RNC and AP root level access | ||
Ø | OMP Shell access |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

q | ECP translations | |||
q | Voice carrier re-configuration or frequency retune(s) if required prior to 1xEV-DO carrier integration | |||
q | Design of the cell | |||
q | BDP of cell configuration data and neighbor list | |||
q | Changes needed after integration (a new service must be purchased to implement any changes) | |||
q | Any cost associated with recommended repairs or changes to the wireless network or equipment | |||
q | Voice functional tests and voice call processing test | |||
q | Training of Customer staff |
q | This service will involve an on-site technician and a remote resource to complete the integration. | |||
q | The call processing testing and FTP closed loop testing do not guarantee any peak or average data rates for the 1xEV-DO carrier under test. Performance of the 1xEV-DO network is achieved through the 1xEV-DO RF Optimization service and 1xEV-DO Data Network Analysis service (provided under separate SOWs). |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. | |||
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools or software to Customer. | |||
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday, excluding Lucent holidays unless different working hours/schedule have been specified elsewhere in the SOW. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

q | ||||
q | All prices are in $US, unless stated otherwise. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
Table of Contents | ||||
1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 1XEV-DO BASE STATION CONSULTANT | 4 | |||
2.1 Elements of Work and Lucent Responsibilities | 4 | |||
2.1.1 Description | 4 | |||
2.1.2 Tasks | 4 | |||
2.1.3 Deliverables | 4 | |||
2.2 Customer Responsibilities | 5 | |||
2.3 Schedule / Timeline | 5 | |||
2.4 Exclusions | 5 | |||
2.5 Assumptions | 5 | |||
2.6 Service-Specific Acceptance | 6 | |||
3 GENERAL TERMS | 6 | |||
3.1 Conditions | 6 | |||
3.2 Change Management | 6 | |||
3.3 Acceptance/Warranty | 7 | |||
4 PRICING SECTION | 7 | |||
4.1 Pricing Notes | 7 | |||
4.2 Pricing | 7 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
1 | INTRODUCTION |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
2 | 1xEV-DO Base Station Consultant |
2.1 | Elements of Work and Lucent Responsibilities |
2.1.1 | Description |
2.1.2 | Tasks |
2.1.3 | Deliverables | |
q | Weekly status reports outlining the activities for that week | |
2.2 | Customer Responsibilities | |
q | Provide appropriate login/password as well as security permissions for the following OMP/AP maintenance interfaces: |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
q | Office space and facilities (desk, telephone, modem access line and fax machine) for Lucent Engineering use. | |
2.3 | Schedule / Timeline | |
q | Customer and Lucent will mutually agree in advance on project schedules or start date before commencement of work. | |
q | Lucent personnel will begin work after acceptance of Customers Purchase Order and Customers completion of any pre-conditions for which Customer is responsible under this SOW. | |
q | Provision of the service is subject to a minimum lead-time of 4 weeks after purchase order acceptance. After purchase order acceptance, Lucent will propose a specific schedule for Customers concurrence. If the parties have not agreed upon another delivery timetable within 2 weeks from acceptance of the purchase order, then the service will be delivered according to the schedule proposed by Lucent. | |
2.4 | Exclusions | |
q | This service does not include technical consultation for Data Networking issues like Router, Ethernet Switches, PDSN and Home Agent, unless customer has contracted Lucent to provide this service under a separate scope of work. | |
q | This service does not include technical consultation for 1XEV-DO RF Optimization, unless customer has contracted Lucent to provide this service under a separate scope of work. | |
q | This service does not include technical consultation for Bulk Data Provisioning Tool. | |
2.5 | Assumptions | |
q | This service assumes 1xEV-DO RNC and OMP has already been integrated. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
2.6 | Service-Specific Acceptance |
3 | General terms |
3.1 | Conditions | |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. | |
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. | |
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. | |
3.2 | Change Management |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
3.3 | Warranty |
4 | Pricing Section | |
4.1 | Pricing Notes | |
q | ||
q | All prices are in $US, unless stated otherwise. | |
4.2 | Pricing |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
Attachment C

Cricket Albuquerque 1xEV-DO BS Consultant | STARS #: MWS-06-000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att C_1xEVDO_Base station Consultant(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
Support for
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
Table of Contents | ||||
1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 1XEV-DO BTS [***] INTEGRATION REMOTE TECHNICAL SUPPORT | 4 | |||
2.1 Elements of Work and Lucent Responsibilities | 4 | |||
2.1.1 Description | 4 | |||
2.1.2 Tasks | 4 | |||
2.1.3 Deliverables | 4 | |||
2.2 Customer Responsibilities | 4 | |||
2.3 Schedule / Timeline | 5 | |||
2.4 Exclusions | 5 | |||
2.5 Assumptions | 6 | |||
2.6 Service-Specific Acceptance | 6 | |||
3 GENERAL TERMS | 6 | |||
3.1 Conditions | 6 | |||
3.2 Change Management | 7 | |||
3.3 Warranty | 7 | |||
4 PRICING SECTION | 8 | |||
4.1 Pricing Notes | 8 | |||
4.2 Pricing | 8 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
b) Pager support for weekends (Saturday through Sunday)
c) Technical support shall be provided over a [***] month period, which will begin on an agreed upon date, pursuant to Crickets issuance of a valid Purchase Order.
q | There are no deliverables for this Service. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
q | Provide appropriate login/password as well as security permissions for the following OMP/AP maintenance interfaces upon request: |
b) Command Line Interface (CLI)
c) 1XEV-DO AP root
d) OMP Shell
e) ECP RC/V (read/write), if cell is on release R25.
q | Provide a field switch technician(s) to resolve any DACS/ T1 issues during BTS [***] integration activity. | |
q | Provide data network engineers to work with Lucent engineers in resolving BTS connectivity issues. | |
q | Provide a primary point of contact and any additional contacts required for each location where BTS [***] integration activities will take place. |
q | Lucent will propose a specific schedule for Customers concurrence. Customer and Lucent will mutually agree in advance on project schedules or start date before commencement of work. | |
q | Lucent personnel will begin work after acceptance of Customers Purchase Order and Customers completion of any pre-conditions for which Customer is responsible under this SOW. | |
q | Provision of the Service is subject to a minimum lead-time of 4 weeks after Purchase Order acceptance. |
q | This Service does not include on-site support by Lucent. | |
q | This service does not include technical support for [***]. | |
q | This service does not include technical support for [***]. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
q | This Service assumes Lucent has been contracted to perform the Core Integration Services and that the Core Integration Services have been completed in all Markets for which Services under this SOW are provided. |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customers premises, those Lucent personnel shall respect Customers on-site conditions. | |
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. | |
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||
Cricket Albuquerque BTS Remote Technical Support | STARS #: MWS-06-000044A1 |
q | ||
q | All prices are in $US, unless stated otherwise. |
Ordering Instructions | ||||||
Service | Price ($) | 40W40 | ||||
[***] | [***] | [***] | [***] |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Amd 9 Att D_EVDO BTS [***] Integration Technical Support 12-12-05(1-11-06)
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
(MSC) Equipment
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
Table of Contents | ||||
1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 ENGINEERING & INSTALLATION OF WIRELESS MOBILE SWITCHING CENTER (MSC) EQUIPMENT | 4 | |||
2.1 Equipment Configuration | 4 | |||
2.2 Lucent Responsibilities Site Survey | 4 | |||
2.2.1 Description | 4 | |||
2.2.2 Site Survey Exclusion | 4 | |||
2.2.3 Site Survey Tasks | 4 | |||
2.2.4 Site Survey Deliverables | 5 | |||
2.3 Lucent Responsibilities Engineering | 5 | |||
2.3.1 Description | 5 | |||
2.3.2 Engineering Tasks | 5 | |||
2.3.3 Engineering Deliverables | 6 | |||
2.4 Lucent Responsibilities Installation | 7 | |||
2.4.1 Description | 7 | |||
2.4.2 Installation Tasks | 7 | |||
2.4.3 Installation Deliverables | 9 | |||
2.5 Customer Responsibilities | 10 | |||
2.5.1 Site Survey Phase: | 10 | |||
2.5.2 Engineering Phase: | 10 | |||
2.5.3 Installation Phase: | 11 | |||
2.6 Schedule / Timeline | 14 | |||
2.7 Exclusions | 14 | |||
2.8 Assumptions | 15 | |||
2.9 Service-Specific Acceptance | 15 | |||
3 GENERAL TERMS | 16 | |||
3.1 Conditions | 16 | |||
3.2 Change Management | 16 | |||
3.3 Warranty | 16 | |||
4 PRICING SECTION | 17 | |||
4.1 Pricing Notes | 17 | |||
4.2 Pricing | 17 | |||
· |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
q | Review the quantity and location of equipment and peripherals specific to the site installation configuration. | ||
q | Identify equipment shortages, standards issues, floor space problems and equipment compatibility issues. |
Ø | Includes working identified issues with Customer, determining items needed for compliance and parties responsible |
q | Verify DC power cable demarcation points and location of ground window. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
q | Verify location of AC distribution cabinet. | ||
q | Determine cable routing and location of Master Control Center (MCC). | ||
q | Determine location of wall mounted alarm boxes. | ||
q | Capture information necessary to determine distance and routing of DC Power cables. | ||
q | Review and determine distance and routing of Optical and signal cabling. | ||
q | Determine distance and cable route for frame ground and ground bar locations. | ||
q | Determine equipment placement / layout. | ||
q | Identify location of spare-parts cabinet. | ||
q | Identify name and telephone number of local contacts. |
q | Complete data collection of site requirements to be used by Lucent Engineering to meet the requirements/specifications of this SOW | ||
q | List of identified responsibilities and requirements for site engineering compliance (i.e., HVAC, floor space, electrical and power, fiber connectivity, assignments etc.) |
q | Execute first-pass verification and integrity check of Customer request/Purchase Order (e.g., does it meet general high-level compatibility requirements such as software release, equipment availability, floor space, site/environmental conditions, etc). | ||
q | Identify recommended equipment framework and associated equipment racking. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
q | Provide list of assignments and material to secure framework, per Customer or zoning requirements. | ||
q | Provide list of assignments and materials for the grounding of equipment and associated framework. | ||
q | Provide front Equipment drawings to show Equipment layout in bay, including circuit pack arrangement, wiring list assignments and mounting records. | ||
q | Create equipment translations (GRCV, FITTS). | ||
q | Provide power cable running list and assignment to run and connect the power cables to the assigned GPDFs fuse panel or circuit breaker position. | ||
q | Provide AC power assignments and running lists to inverter. | ||
q | Provide running lists and assignment to run and connect the fiber cables to the assigned LGX bay, panel, and jack position. | ||
q | Provide running list and assignments to run and connect the LAN interface cables to the assigned Customer-provided router. | ||
q | Provide running list and assignments to run and connect the DSX1 or DSX3 cables to the assigned DSX bay, panel, and jack position. | ||
q | Provide running list and assignments to run and connect the alarm cables to the assigned Vertical and Block of the MDF/SSLPDF, and alarm wall-mounted boxes. | ||
q | Provide running list and assignments to run and connect the Timing cables to the assigned Timing sources. | ||
q | Provide running lists for x-dimension inter-cabinet cables, including fuse alarm and communication bus multiples. | ||
q | Update all Lucent site records and assignments. |
q | Provide technical specifications consisting of the following: |
Ø | Equipment installation instructions, notes and work items | ||
Ø | Bill of materials | ||
Ø | Applicable associated cable running lists, wiring lists and assignments as itemized above |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
Ø | List of standard drawing references and associated Equipment manuals |
q | Provide drawings detailing the following: |
Ø | Floor-plan | ||
Ø | Equipment layout | ||
Ø | Framework and cabling | ||
Ø | Equipment framework grounding |
q | Provide Equipment translations (GRCV, FITTS). |
Ø | Note: Rate and Route translations are available if contracted by Customer but are not part of this SOW. |
q | Lucent will prepare a detailed MOP document, which covers, but is not limited to, the following: |
Ø | Major work activities to be performed by Lucent | ||
Ø | Customer job-start responsibilities | ||
Ø | Job start and end dates, and daily work schedules | ||
Ø | Lucent and Customer contacts | ||
Ø | Delivery, storage and staging of Equipment | ||
Ø | Detailed Customer and Lucent security, safety and service protection responsibilities and procedures | ||
Ø | Transition documentation, covering the handoff of all deliverables and signifying the completion of the Service |
q | Lucent will obtain appropriate Customer signatures on the MOP document before installation begins. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
q | Arrange for material delivery at Customer site location, and provide reasonable inspection for shipping damage. | ||
q | Unpack and inventory materials. |
q | Support Equipment framework or shelving in the assigned location, per equipment footprint. | ||
q | Mount all in-scope equipment/furniture, per front equipment and plan drawings. | ||
q | Ground Equipment and associated framework, per grounding drawing or Lucent grounding standards. | ||
q | Insert and seat all circuit packs into Equipment shelves. | ||
q | Run and connect power cables to the assigned GPDFs fuse panel and fuse position, per assignment drawing or specification. | ||
q | Run and connect AC power for inverter. | ||
q | Assemble fiber management system. | ||
q | Run and connect fiber cables to the assigned LGX bay, panel, and jack position, per assignment drawings or specification. | ||
q | Run and connect LAN interface cable to the assigned Customer-provided router, per specification. | ||
q | Run and connect the DSX1 or DSX3 cables to the assigned DSX bay, panel, and jack position, per assignment drawings or specification. | ||
q | Run and connect the alarm cables to the assigned vertical and block of the MDF/SSLPDF or alarm-receiving device. | ||
q | Run and connect the timing cables to the assigned timing sources, per assignment drawing or specification. | ||
q | Run and connect the tip/ring cables from the line peripheral units to the distribution frame. | ||
q | Clean and inspect field-connected fiber. |
Ø | Apply wet solvent to connector endface to dissolve/remove impurities. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
Ø | Perform dry clean wipe to remove remaining impurities. | ||
Ø | Use scope to inspect fiber for contaminants, chips, cracks and scratches. |
q | Stamp and/or affix aisle, shelf and unit designations. | ||
q | Load provided provisioning software into the Equipment, per the engineering specification. |
q | Load Customer translations tape into the switch database. | ||
q | Power up Equipment under normal power conditions and verify proper power-up. | ||
q | Perform basic, standalone tests on the individual Equipment unit, per manufacturers standard installation and test procedures. | ||
q | Resolve all troubles encountered with Lucent-provided Equipment. | ||
q | Notify Customer of any troubles with Customer-provided equipment. | ||
q | All tests shall be All Tests Passed (ATP). (Testing specifically excludes unequipped slots and spares, which can be performed by Lucent for an additional charge.) | ||
q | Maintain test logs and trouble reports. |
q | Remove from Customer site all tools and debris generated from the installation effort. | ||
q | Mark and return office drawings to Engineering. | ||
q | Provide Customer with all job documentation (e.g., job drawings, specifications), test records, and inventoried Equipment spares and excess material (e.g., cables, fuses) (which will be left at the Customer site). | ||
q | Verify proper completion of installation. | ||
q | Issue Job Completion Notice to Customer. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
q | MOP | ||
q | Equipment installed, tested and ready for Customer handover | ||
q | Job specification and other job documentation | ||
q | Installation test records | ||
q | Inventoried Customer spares ordered with the Equipment | ||
q | Excess Customer-ordered/owned material (e.g., cables, fuses) | ||
q | Job Completion Notice for Customer sign-off |
q | Provide: |
Ø | Specific site locations and directions | ||
Ø | Site documentation, including site drawings and records | ||
Ø | Access (e.g., permissions, keys, access codes) to secured or guarded building and facilities | ||
Ø | Customer representative to be present at time of survey |
q | Perform the additional tasks described in the Site Survey section of this SOW if Customer elects not to have Lucent perform a Site Survey. |
q | Provide: |
Ø | Completed questionnaires | ||
Ø | Customer equipment requirements, as applicable for product | ||
Ø | Master records (if available) | ||
Ø | Software records and forms |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
![]() | ||||
Cricket Communications | STARS # MWS-06-000045-A1 |
Ø | Final approval of equipment footprint, floor plans layout(s) | ||
Ø | All required demarcation assignments. | ||
Ø | Network configuration. | ||
Note: These last two activities are required, regardless of whether Lucents engineering Service is or is not purchased. |
q | The following items are Customer responsibilities, unless contracted to Lucent and identified on the purchase order: |
Ø | Build and load software Rate and Route translations (ODD) |
q | Provide access (e.g., permissions, keys, access codes) to secured or guarded building and facilities. Provide access and space for delivery trucks and installation team (e.g., unloading space, building opening of adequate size, equipment, storage areas, elevators, loading dock, switch, power rooms). | ||
q | Complete all site preparation tasks, including those identified by Lucents site survey. [Customer will be responsible for additional charges for any additional work effort required, including site revisits, as a result of the site not being ready, and the schedule will be adjusted for the resulting delay, in accordance with Note 1 below.] | ||
q | Site preparation tasks will include but are not limited to: |
Ø | Provide appropriate HVAC (heating, ventilation, air conditioning), AC power (available within the installation area), lighting, structural analysis, and fire protection/environmental hazard protections for installation site, as required by law and in accordance with equipment manufacturers specifications. | ||
Ø | Provide sufficient DC power, in accordance with equipment manufacturers specifications, to power the new equipment, and assure that all required DC power drops have been provided to the installation area, have been terminated to the power supply, and have been identified. | ||
Ø | Provide grounding system suitable for the equipment. | ||
Ø | Provide environmental alarms. | ||
Ø | Remove all hazardous materials (e.g., asbestos) and correct any hazardous conditions that exist at the installation site. | ||
Ø | Verify that equipment floor load-bearing capacity is adequate (a structural analysis is recommended). | ||
Ø | Provide alarm blocks and cable designations. | ||
Ø | Provide aisle, shelf and unit designations. |
Lucent Proprietary and Confidential
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION.
Cricket Communications | STARS # MWS-06-000045-A1 | ![]() |
q | Provide T1 or microwave facilities to Cells that are installed, tested and operational, prior to the start of Cell Integration (on a cell-by-cell basis). | ||
q | Provide installation instructions/documentation and assignments for Customer-provided equipment. | ||
q | Obtain permits/licenses and variances, if required. If Lucent is required to obtain permits for the job, Customer will be responsible for any charges and will reimburse Lucent upon an invoicing of said charges. Customer agrees to authorize such invoicing by executing a Change Order (as defined in the Change Control Process section of this SOW) at Lucents request. | ||
q | Inform Lucent of the presence of any sensitive equipment at the work site (e.g., equipment sensitive to static electricity, heat or light). | ||
q | Make available sufficient floor space required for Equipment staging, storage and installation. | ||
q | Sign off on Installation Method of Procedure (MOP) document. | ||
q | The following items are Customer responsibilities, unless contracted to Lucent and identified on the purchase order: |
Ø | Provide all required bay frames, cabinets, and other support material. | ||
Ø | Provide all required cable rack, fiber duct, lighting and common systems. | ||
Ø | Provide all required connecting appliances (e.g., MDF terminal blocks, DSX jack and panel, LGX panel, timing sources). | ||
Ø | Input MSC translations, in both Digital Cellular Switch (DCS) and Executive Cellular Switch (ECP), but not limited to, trunking, SS7, ISUP, CCS7, PSU links, CSN, Acculink DSX, ATM and DACS. Prior to the start of testing of the first Base Station (Cell), provide Cell translations, including, but not limited to, radio settings and power levels. |
q | Provide access (e.g., permissions, keys, access codes) to secured or guarded building and facilities. Provide access and space for delivery trucks and installation team (e.g., unloading space, building opening of adequate size, equipment, storage areas, elevators, loading dock, switch, power rooms). | ||
q | Complete all site preparation tasks, including those identified by Lucents site survey. [Customer will be responsible for additional charges for any additional work effort required, including site revisits, as a result of the site not being ready, and the schedule will be adjusted for the resulting delay, in accordance with Note 1 below.] | ||
q | Site preparation tasks will include but are not limited to: |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Communications | STARS # MWS-06-000045-A1 | ![]() |
Ø | Provide sufficient DC power, in accordance with equipment manufacturers specifications, to power both MSCs simultaneously or the new equipment, being added to the MSC. Assure that all required DC power drops are provided to the installation area and have been terminated to the power supply. | ||
Ø | Provide environmental alarms. | ||
Ø | Verify that equipment floor load-bearing capacity is adequate (a structural analysis is recommended). | ||
Ø | Provide alarm blocks and cable designations. | ||
Ø | Provide aisle, shelf and unit designations. |
q | Verify that the operational T1 or microwave facilities between the Cells and MSC have sufficient capacity. | ||
q | Provide installation instructions/documentation and assignments for Customer-provided equipment. | ||
q | Obtain permits/licenses and variances, if required. If Lucent is required to obtain permits for the job, Customer will be responsible for any charges and will reimburse Lucent upon an invoicing of said charges. Customer agrees to authorize such invoicing by executing a Change Order (as defined in the Change Control Process section of this SOW) at Lucents request. | ||
q | Inform Lucent of the presence of any sensitive equipment at the work site (e.g., equipment sensitive to static electricity, heat or light). | ||
q | Make available sufficient floor space required for equipment staging, storage and installation. | ||
q | Sign off on Installation Method of Procedure (MOP) document. | ||
q | The following items are Customer responsibilities, unless contracted to Lucent and identified on the purchase order: |
Ø | Provide all required bay frames, cabinets, and other support material. | ||
Ø | Provide all required cable rack, fiber duct, lighting and common systems. | ||
Ø | Provide all required connecting appliances (e.g., MDF terminal blocks, DSX jack and panel, LGX panel, timing sources). | ||
Ø | Input MSC translations, in both Digital Cellular Switch (DCS) and Executive Cellular Switch (ECP), but not limited to, trunking, SS7, ISUP, CCS7, PSU links, CSN, Acculink DSX, ATM and DACS. Prior to the start of testing of the first Base Station (Cell), provide Cell translations, including, but not limited to, radio settings and power levels. |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Communications | STARS # MWS-06-000045-A1 | ![]() |
q | Engineering drawings apply to the Equipment listed in this SOW and do not include creation or update of Customer office records. | ||
q | Price includes testing in accordance with Lucents and/or third-party manufacturers published specifications and/or standard installation and test procedures, which is to confirm standalone functionality of the individual Equipment unit. End-to-end, integration, interoperability, network or other types of testing are not included in this SOW. | ||
q | Site material requirements and its pricing are not included in this SOW. Such requirements and pricing shall be established after completion of the site survey or receipt of Customer-submitted site material data. The site materials and associated engineering and installation effort shall be quoted to Customer; and, upon approval, Customer shall submit a separate Purchase Order for such site materials and associated services. | ||
q | Modification to, or repair of, Customer-provided material is excluded from this SOW. New or used material provided by Customer shall be in such condition that it requires no repair and no adjustment or test effort in excess of that normal for new equipment. | ||
q | The following items are excluded from this SOW: |
Ø | Site acquisitions | ||
Ø | Site building construction and modifications | ||
Ø | AC/DC power to the site | ||
Ø | HVAC | ||
Ø | Emergency power/generators, grounding | ||
Ø | Permits/licenses | ||
Ø | Spares |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Communications | STARS # MWS-06-000045-A1 | ![]() |
Ø | Product and Services training | ||
Ø | Jumpers | ||
Ø | Effort to run, clean and connect fiber jumpers from the LGX to the Outside Plant | ||
Ø | Testing of spares | ||
Ø | Removal and/or relocation of existing equipment |
q | Unless otherwise agreed upon, all prices are based on installation intervals agreed by the parties in writing (including compressed schedules), or, if none, Lucents standard installation intervals for the product in question. | ||
q | Price includes allowance for normal travel and living for distances up to 65 miles between Lucent installation base location and Customer job site. Additional travel and living expenses will be billed as incurred. | ||
q | Unless otherwise noted, only normal delivery Services are included in this price. Normal delivery is defined as: |
Ø | Not more than 30 days in a local warehouse. | ||
Ø | Trucking, via single-axle drive trucks, up to approximately 100 miles from the warehouse to the Customer site that has a loading dock and, if required, a freight elevator of sufficient capacity to accommodate the Equipment being delivered. | ||
Ø | Building openings of adequate size to accept Equipment assemblies. |
q | Unless otherwise specified, all far-end terminations, including but not limited to DSX, LGX, power, alarms and grounding, must be on the same floor as the Equipment being installed; and cable runs will be a maximum of 100 feet for Equipment and 50 feet for power. | ||
q | Lucent shall provide protection for Customer equipment and buildings during the performance of the Services, in accordance with Lucents standard practices. |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Communications | STARS # MWS-06-000045-A1 | ![]() |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customer premises, those Lucent personnel shall respect Customer on-site conditions. | ||
q | Lucent may use proprietary tools and software for providing this Service. The stated price does not include the sale, licensing or transfer of such tools to Customer. | ||
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Cricket Communications | STARS # MWS-06-000045-A1 | ![]() |
q | |||
q | All prices are in $US, unless stated otherwise. | ||
q | |||
q | Lucents pricing, as listed herein, is subject to change if the services are provided in support of a governmental contract or are otherwise subject to a Prevailing Wage Law. The term Prevailing Wage Law means the federal Davis-Bacon Act (Title 40 U.S. Code, chapter 3, Section 276(a)) or any similar federal, state or local law or regulation requiring that workers under certain contracts be paid the prevailing local wage for the classification of work in question. Customer further agrees that, if a Prevailing Wage Law is applicable, an adjustment to the pricing shall be made in proportion to the increased amounts Lucent is required to pay as a result of application of the Prevailing Wage Law. Customer agrees to execute Change Orders at Lucents request to memorialize such pricing adjustment. |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Attachment E-1
Customer | STARS # MWS-06-000044-A1 | ![]() |
(Cell) Equipment
(e.g., Floor, Concrete Pad, Rooftop)
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
1 INTRODUCTION | 3 | |||
Description of Services | 4 | |||
2 INSTALLATION OF WIRELESS BASE STATION (CELL) EQUIPMENT THAT IS MOUNTED ON A HORIZONTAL SURFACE (E.G., FLOOR, CONCRETE PAD, ROOFTOP) | 4 | |||
2.1 Equipment Configuration | 4 | |||
2.2 Lucent Responsibilities Installation | 4 | |||
2.2.1 Description | 4 | |||
2.2.2 Installation | 4 | |||
2.2.3 Installation Deliverables | 6 | |||
2.3 Customer Responsibilities | 7 | |||
2.3.1 Installation Phase: | 7 | |||
2.4 Schedule / Timeline | 10 | |||
2.5 Exclusions | 10 | |||
2.6 Assumptions | 11 | |||
2.7 Service Specific Acceptance | 11 | |||
3 GENERAL TERMS | 12 | |||
3.1 Conditions | 12 | |||
3.2 Change Management | 12 | |||
3.3 Warranty | 12 | |||
4 PRICING SECTION | 13 | |||
4.1 Pricing Notes | 13 | |||
4.2 Pricing | 13 |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
1 | Introduction |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
2 | Installation of Wireless Base Station (Cell) Equipment that is Mounted on a Horizontal Surface (e.g., Floor, Concrete Pad, Rooftop) |
2.1 | Equipment Configuration |
| [***] |
2.2 | Lucent Responsibilities Installation |
2.2.1 | Description |
2.2.2 | Installation |
2.2.2.1 | Method of Procedure (MOP) |
q | Lucent will prepare a detailed MOP document, which covers, but is not limited to, the following: |
Ø | Major work activities to be performed by Lucent | ||
Ø | Customer job-start responsibilities | ||
Ø | Job start and end dates, and daily work schedules | ||
Ø | Lucent and Customer contacts | ||
Ø | Delivery, storage and staging of Equipment | ||
Ø | Detailed Customer and Lucent security, safety and service protection responsibilities and procedures |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
Ø | Transition documentation, covering the handoff of all deliverables and signifying the completion of the service |
q | Lucent will obtain appropriate Customer signatures on the MOP document before installation begins. |
2.2.2.2 | Material Receipt |
q | Arrange for material delivery at Customer site location, and provide reasonable inspection for shipping damage. | ||
q | Unpack and inventory materials. |
2.2.2.3 | Assembly and Cabling & Wiring |
q | Support Equipment framework or shelving in the assigned location, per Equipment footprint. | ||
q | Mount all in-scope Equipment, per front Equipment drawing. | ||
q | Install conduit for protected T1 line (for outdoor applications that are above ground and 30 feet or less in length). | ||
q | Ground Equipment and associated framework, per grounding drawing or Lucent grounding standards. | ||
q | Insert and seat all circuit packs into Equipment shelves. | ||
q | Stamp and/or affix aisle, shelf and unit designations. | ||
q | Run and connect all cables and wires including AC and DC power, RF jumper, ground, and alarm. | ||
q | Verify integrity and continuity of cabling and wiring added. | ||
q | Connect T1 to installed Equipment. | ||
q | Dress and otherwise protect cabling and wiring. | ||
q | Load provided provisioning software into the Equipment, per the engineering specification. |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
2.2.2.4 | Standalone Equipment Testing |
q | Power up Equipment under normal power conditions and verify proper power-up. | ||
q | Perform basic, standalone tests on the individual Equipment unit, per manufacturers standard installation and test procedures. | ||
q | Resolve all troubles encountered with Lucent-provided Equipment. | ||
q | Notify Customer of any troubles with Customer-provided equipment. | ||
q | All tests shall be All Tests Passed (ATP). (Testing specifically excludes unequipped slots and spares, which can be performed by Lucent for an additional charge.) | ||
q | Maintain test logs and trouble reports. |
2.2.2.5 | Installation Job Completion |
q | Remove from Customer site all tools and debris generated from the installation effort. | ||
q | Mark and return office drawings to Engineering. | ||
q | Provide Customer with all job documentation (e.g., job drawings, specifications), test records, and inventoried Equipment spares and excess material (e.g., cables, fuses) (which will be left at the Customer site). | ||
q | Verify proper completion of installation. | ||
q | Issue Job Completion Notice to Customer. |
2.2.3 | Installation Deliverables |
q | MOP | ||
q | Equipment installed, tested and ready for Integration | ||
q | Job specification and other job documentation | ||
q | Installation test records | ||
q | Inventoried Customer spares ordered with the Equipment | ||
q | Excess Customer-ordered/owned material (e.g., cables, fuses) |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
q | Job Completion Notice for Customer sign-off |
2.3 | Customer Responsibilities | |
2.3.1 | Installation Phase: |
q | Provide access (e.g., permissions, keys, access codes) to secured or guarded building and facilities. Provide access and space for delivery trucks and installation team (e.g., unloading space, building opening of adequate size, Equipment, storage areas, elevators, loading dock, switch, power rooms). | ||
q | Complete all site preparation tasks. [Customer will be responsible for additional charges for any additional work effort required, including site revisits, as a result of the site not being ready, and the schedule will be adjusted for the resulting delay, in accordance with Note 1 below.] | ||
q | Site preparation tasks will include but are not limited to: |
Ø | Provide appropriate HVAC (heating, ventilation, air conditioning), AC power (available within the installation area), a connected and grounded surge protector at the hatch plate, GPS antenna and mounting brackets (for CDMA applications), lighting, structural analysis, and fire protection/environmental hazard protections for installation site, as required by law and in accordance with equipment manufacturers specifications. | ||
Ø | Provide sufficient DC power, in accordance with equipment manufacturers specifications, to power the new equipment, and assure that all required DC power drops have been provided to the installation area, have been terminated to the power supply, and have been identified. | ||
Ø | Provide grounding system suitable for the Equipment. | ||
Ø | Provide environmental alarms. | ||
Ø | Remove all hazardous materials (e.g., asbestos) and correct any hazardous conditions that exist at the installation site. | ||
Ø | Provide installed and grounded towers, as well as tower lighting, if required. | ||
Ø | Provide installed, tested and grounded antennas, as well as antenna cables that are run to the Telco demarcation point, connectorized, labeled, and swept for all antenna faces. |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
Ø | Provide T1 or microwave facilities to Mobile Switch Center (MSC) that are installed, terminated at the Telco demarcation point, tested, and are operational, prior to the start of Cell Installation. | ||
Ø | Provide alarm blocks and cable designations. | ||
Ø | Provide aisle, shelf and unit designations. | ||
Ø | Verify that equipment floor load-bearing capacity is adequate (a structural analysis is recommended). |
q | Provide installation instructions/documentation and assignments for Customer-provided equipment. | ||
q | Obtain permits/licenses and variances, if required. If Lucent is required to obtain permits for the job, Customer will be responsible for any charges and will reimburse Lucent upon an invoicing of said charges. Customer agrees to authorize such invoicing by executing a Change Order (as defined in the Change Control Process section of this SOW) at Lucents request. | ||
q | Inform Lucent of the presence of any sensitive equipment at the work site (e.g., equipment sensitive to static electricity, heat or light). | ||
q | Make available sufficient floor space required for Equipment staging, storage and installation. | ||
q | Sign off on Installation Method of Procedure (MOP) document. | ||
q | The following items are Customer responsibilities, unless contracted to Lucent and identified on the purchase order: |
Ø | Provide all required bay frames, cabinets, and other support material. | ||
Ø | Provide all required cable rack, lighting and common systems. | ||
Ø | Provide all required connecting appliances (e.g., MDF terminal blocks, DSX jack and panel, timing sources). | ||
Ø | Provide sufficient DC power, in accordance with equipment manufacturers specifications, to power the new equipment. | ||
Ø | Provide Cell translations, including but not limited to, radio settings and power levels. |
q | Provide access (e.g., permissions, keys, access codes) to secured or guarded building and facilities. Provide access and space for delivery trucks and installation team (e.g., unloading space, building opening of adequate size, equipment, storage areas, elevators, loading dock, switch, power rooms). |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
q | Complete all site preparation tasks, including those identified by Lucents site survey. [Customer will be responsible for additional charges for any additional work effort required, including site revisits, as a result of the site not being ready, and the schedule will be adjusted for the resulting delay, in accordance with Note 1 below.] | ||
q | Site preparation tasks will include but are not limited to: |
Ø | Complete all tasks for the migration of traffic from the existing switch (including power-down). | ||
Ø | Verify that the operational T1 or microwave facilities between the Cell and the MSC have sufficient capacity. | ||
Ø | Remove all hazardous materials (e.g., asbestos) and correct any hazardous conditions that exist at the installation site. | ||
Ø | Provide alarm blocks and cable designations. | ||
Ø | Provide aisle, shelf and unit designations. | ||
Ø | Verify that equipment floor load-bearing capacity is adequate (a structural analysis is recommended). |
q | Provide installation instructions/documentation and assignments for Customer-provided equipment. | ||
q | Obtain permits/licenses and variances, if required. If Lucent is required to obtain permits for the job, Customer will be responsible for any charges and will reimburse Lucent upon an invoicing of said charges. Customer agrees to authorize such invoicing by executing a Change Order (as defined in the Change Control Process section of this SOW) at Lucents request. | ||
q | Inform Lucent of the presence of any sensitive equipment at the work site (e.g., equipment sensitive to static electricity, heat or light). | ||
q | Make available sufficient floor space required for Equipment staging, storage and installation. | ||
q | Sign off on Installation Method of Procedure (MOP) document. | ||
q | The following items are Customer responsibilities, unless contracted to Lucent and identified on the purchase order: |
Ø | Provide all required bay frames, cabinets, and other support material. | ||
Ø | Provide all required cable rack, lighting and common systems. | ||
Ø | Provide all required connecting appliances (e.g., MDF terminal blocks, DSX jack and panel, timing sources). |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
Ø | Provide sufficient DC power, in accordance with equipment manufacturers specifications, to power both Cells simultaneously or the new Equipment being added to the Cell. | ||
Ø | Provide Cell translations, including but not limited to, radio settings and power levels. |
2.4 | Schedule / Timeline |
2.5 | Exclusions |
q | Engineering drawings apply to the Equipment listed in this SOW and do not include creation or update of Customer office records. | ||
q | Price includes testing in accordance with Lucents and/or third-party manufacturers published specifications and/or standard installation and test procedures, which is to confirm standalone functionality of the individual Equipment unit. End-to-end, integration, interoperability, network or other types of testing are not included in this SOW. | ||
q | Site material requirements and its pricing are not included in this SOW. Such requirements and pricing shall be established after completion of the site survey or receipt of Customer-submitted site material data. The site materials and associated engineering and installation effort shall be quoted to Customer; and, upon approval, Customer shall submit a separate Purchase Order for such site materials and associated services. | ||
q | Modification to, or repair of, Customer-provided material is excluded from this SOW. New or used material provided by Customer shall be in such condition that it requires no repair and no adjustment or test effort in excess of that normal for new Equipment. | ||
q | The following items are excluded from this SOW: |
Ø | Site acquisitions | ||
Ø | Site building construction and modifications |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
Ø | AC/DC power to the site | ||
Ø | HVAC | ||
Ø | Emergency power/generators, grounding | ||
Ø | Permits/licenses | ||
Ø | Spares | ||
Ø | Product and services training | ||
Ø | Jumpers | ||
Ø | Effort to run, clean and connect fiber jumpers from the LGX to the Outside Plant | ||
Ø | Testing of spares | ||
Ø | Removal and/or relocation of existing equipment | ||
Ø | Cell Integration |
2.6 | Assumptions |
q | Unless otherwise agreed upon, all prices are based on installation intervals agreed by the parties in writing (including compressed schedules), or, if none, Lucents standard installation intervals for the product in question. | ||
q | Price includes allowance for normal travel and living for distances [***] between Lucent installation base location and Customer job site. Additional travel and living expenses will be billed as incurred. | ||
q | [***] | ||
q | Unless otherwise specified, all far-end terminations, including but not limited to DSX, LGX, power, alarms and grounding, must be on the same floor as the Equipment being installed; and cable runs will be a maximum of 100 feet for Equipment and 50 feet for power. | ||
q | Lucent shall provide protection for Customer equipment and buildings during the performance of the Services, in accordance with Lucents standard practices. |
2.7 | Service-Specific Acceptance |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
3 | General terms |
3.1 | Conditions |
q | Lucent reserves the right to determine which personnel to assign to perform Services. Lucent personnel shall at all times be subject to the employment conditions of Lucent and not those of Customer. If Lucent personnel are present on Customer premises, those Lucent personnel shall respect Customer on-site conditions. | ||
q | Lucent may use proprietary tools and software for providing this service. The stated price does not include the sale, licensing or transfer of such tools to Customer. | ||
q | All work will be performed during normal business hours 8 AM to 5 PM, local time, Monday through Friday unless different working hours/schedule have been specified elsewhere in the SOW. |
3.2 | Change Management |
3.3 | Warranty |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Customer | STARS # MWS-06-000044-A1 | ![]() |
4 | Pricing Section |
4.1 | Pricing Notes |
q | All prices are in $US, unless stated otherwise. | ||
q | |||
q | Lucents pricing, as listed herein, is subject to change if the services are provided in support of a governmental contract or are otherwise subject to a Prevailing Wage Law. The term Prevailing Wage Law means the federal Davis-Bacon Act (Title 40 U.S. Code, chapter 3, Section 276(a)) or any similar federal, state or local law or regulation requiring that workers under certain contracts be paid the prevailing local wage for the classification of work in question. Customer further agrees that, if a Prevailing Wage Law is applicable, an adjustment to the pricing shall be made in proportion to the increased amounts Lucent is required to pay as a result of application of the Prevailing Wage Law. Customer agrees to execute Change Orders at Lucents request to memorialize such pricing adjustment. |
4.2 | Pricing |
Copyright © 2005 Lucent Technologies, Inc. All Rights Reserved.
Attachment E-2
Per Market | ||||||||||||
Amendment 9- Lucent Core Integration Services Per Attachments A1 - A5 | [***] | [***] | [***] | |||||||||
Total | [***] | |||||||||||
Consultancies | Total | |||
[***] | [***] | [***] |
[***] | Price | |||
Per Market | ||||
a) if consultancy package purchased | [***] | [***] | ||
b) if consultancy package not purchased | [***] | [***] | ||
Amd 9 - Attachment D |
Amd 9 - BTS Integration - Attachment B | Per BTS/Carrier | [***] | ||
BTS, RNC, Juniper, Riverstone | ||||
Engineering & Installation Amd 9 - | Per Amd 8 | |||
Amd 9 - Attachments E1 - E2 | (pricing) | [***] |
Other Optional Services | [***] | [***] | [***] | |||
[***] | [***] | [***] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [***] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [***] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [***] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |

Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [*** ] |
Overall Equipment List | ||||||
Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [***] | |||
Overall Equipment List | ||||||
Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [***] | |||
Overall Equipment List | ||||||
Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [***] | |||
Overall Equipment List | ||||||
Item # | Description | Order Code | Quantity | |||
[***] | [***] | [***] | [***] | |||
Cricket Amendment No. 9 | ||
Attachment H |
Portfolio | Product Configuration or Feature Description | Delivery | ||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | |||||||
Segment | FID | (Feature Name) | Delivery Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | |||||||||||
Segment | FID | (Feature Name) | Delivery Type | Dependencies (FIDs) | List Price | Pricing Unit | ||||||
[***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | |||||||||||
Segment | FID | (Feature Name) | Delivery Type | Dependencies (FIDs) | List Price | Pricing Unit | ||||||
[***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | List Price | Pricing Unit | ||||||
[***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | List Price | Pricing Unit | ||||||
[***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | Delivery | ||||||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | List Price | Pricing Unit | ||||||
[***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||
Portfolio | Product Configuration or Feature Description | |||||
Segment | FID | (Feature Name) | Delivery Type | |||
[***] | [***] | [***] | [***] | |||
Portfolio | Product Configuration or Feature Description | |||||||||
Segment | FID | (Feature Name) | Delivery Type | Pricing Unit | ||||||
[***] | [***] | [***] | [***] | [***] | ||||||
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. |
Portfolio | Product Configuration or Feature Description | |||||||||||||||
Segment | FID | (Feature Name) | Delivery Type | Dependencies (FIDs) | ||||||||||||
[***] | [***] | [***] | [***] | [***] | ||||||||||||
Portfolio | Product Configuration or Feature Description | Delivery | Planning | Pricing | ||||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | Price | Unit | ||||||
[***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. |
Portfolio | Product Configuration or Feature Description | |||||||
Segment | FID | (Feature Name) | Delivery Type | Dependencies (FIDs) | ||||
[***] | [***] | [***] | [***] | [***] | ||||
Portfolio | Product Configuration or Feature Description | Delivery | Planning | Pricing | ||||||||
Segment | FID | (Feature Name) | Type | Dependencies (FIDs) | Price | Unit | ||||||
[***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. |
Hardware | Description | Order Code | Quantity | |||||||
[***] | [***] | [***] | [***] | [***] | ||||||
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. |
Hardware | Description | Order Code | Quantity | |||||||
[***] | [***] | [***] | [***] | [***] | ||||||
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. |
Hardware | Description | Order Code | Quantity | |||||||
[***] | [***] | [***] | [***] | [***] | ||||||
[*] CERTAIN MATERIAL (INDICATED BY AN ASTERISK) HAS BEEN OMITTED FROM THIS DOCUMENT PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. THE OMITTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. |