Amendment No. 3 to Stevedoring and Terminal Services Agreement among Horizon Lines of Alaska, LLC, Horizon Lines, LLC, and APM Terminals North America, Inc.
This amendment updates the existing agreement between Horizon Lines of Alaska, LLC, Horizon Lines, LLC (collectively, the Carrier), and APM Terminals North America, Inc. (the Contractor) regarding stevedoring and terminal services. It clarifies the definition of guaranteed cargo, adjusts exclusivity and bonus payment terms, and provides the Carrier with options to move certain vessel services to other terminals under specific conditions. The amendment also grants the Contractor a first right of refusal for stevedoring services at common user facilities in North America. Key dates and notice requirements are specified for exercising these options.
TO
STEVEDORING AND TERMINAL SERVICES AGREEMENT
A. | Carrier and Contractor entered into that certain Stevedoring and Terminal Services Agreement dated as of May 9, 2004, as amended by an Amendment No. 1 dated as of December 12, 2004, (Amendment No. 1), which Amendment No. 1 became void, and an Amendment No. 2 dated as of November 30, 2006 (Amendment No. 2) (as so amended, the Terminal Agreement). |
B. | Carrier and Contractor hereby intend to amend the Terminal Agreement as described below. |
1. | Definitions. All terms used herein, unless otherwise specified, shall have the meaning ascribed to them in the Terminal Agreement. |
2. | The first sentence of Section 2(b) of the Terminal Agreement is deleted and replaced with the following: For any Cargo transported by Carrier in its regularly scheduled Jones Act service on a Vessel that needs to call a terminal located in the respective territories listed in First Revised Exhibit A (each a Terminal Territory), Carrier shall guarantee to Contractor to move such cargo through a Terminal located in a Terminal Territory. |
3. | The following new sentence is added immediately after the second sentence of Section 2(b) of the Terminal Agreement: For the sake of clarity, Guaranteed Cargo shall not include: cargo transported on one-time international moves for dry-dock positioning voyages or one-time positioning voyages; or inter-coastal cargo defined as cargo transported in a new service originating and terminating between two ports in the lower 48 states provided that Carrier will use best efforts to use Contractors facilities/services in ports where such services call and further provided that Carrier will only use another facility if required to obtain cargo from or deliver cargo to a specific carrier. Further for the sake of clarity, Guaranteed Cargo shall include cargo transported on the TP1 vessel string, except as provided in Section 7 below. |
4. | The following is added as the new last sentence of Section 2(b) of the Terminal Agreement: If Contractor accepts the Guaranteed Cargo offered, Contractor shall provide Carrier the Services at the rates described in the Appendices to this Agreement and Carrier must exclusively use the relevant Terminal for such Guaranteed Cargo even if only a portion of the relevant Vessel is carrying such Guaranteed Cargo. |
5. | Sections 2(b)(i) and (ii) of the Terminal Agreement are deleted. |
6. | A new Section 2(f) is added to the Terminal Agreement, as follows: |
2010 | * | |
2011 | * | |
2012 | * | |
2013 | * | |
2014 | * | |
2015 | * |
7. | A new Section 2(g) is added to the Terminal Agreement as follows: |
(1) | First, between December 10, 2010 and December 31, 2010 (the First Option Date) Carrier may move the TP1 Service to a different container terminal facility without terminating this Agreement (the First Option), provided that (i) Carrier has an FMC- filed and executed vessel sharing, space charter or similar agreement for its TP1 Service with an ocean common carrier which has a financial stake or existing, binding contractual commitment in a container facility in the port where the TP1 Service calls, and Contractor and such other carrier are unable to reach mutual agreement upon the terms and conditions pursuant to which Contractor is willing to provide marine terminal and stevedoring services to such other carrier, and (ii) Carrier has delivered written notice of its election to exercise the First Option to Contractor at least ninety (90) days prior to the First Option Date and (iii) such other carrier uses *. |
2
(2) | Second, in the event that Carrier has not otherwise exercised the First Option such that Carrier continues operations at the Terminal Facility after the First Option Date, Carrier may on December 31, 2012 (the Second Option Date) move the TP1 Service to a different container terminal facility without terminating this Agreement (the Second Option), provided that in any such event, (i) Carrier has an FMC-filed and executed vessel sharing, space charter or similar agreement for its TP1 Service with an ocean common carrier which has a financial stake or existing, binding contractual commitment in a container facility in the port where the TP1 Service calls, and Contractor and such other carrier are unable to reach mutual agreement upon the terms and conditions pursuant to which Contractor is willing to provide marine terminal and stevedoring services to such other carrier, and (ii) Carrier has delivered written notice of its election to exercise the Second Option to Contractor at least one hundred eighty (180) days prior to the Second Option Date and (iii) such other carrier uses *. |
(3) | Third, Carrier may elect to postpone the exercise of the Second Option from December 31, 2012 to either December 31, 2013, or December 31, 2014, in Carriers discretion, provided that it gives written notice of such election to Contractor no later than the First Option Date. |
(4) | In the event that Carrier exercises any of the options set forth in Section 2(g) (1)-(3) herein, Carrier and Contractor will agree upon a reasonable transition period for the orderly, efficient and smooth transfer of Carriers operations to another container terminal and terminal services provider. |
(5) | Should Carrier exercise any of the options set forth in Section 2(g)(1)- (3) herein, the annual bonus payments set forth in Section 2(f) above shall be * for each year that the TP1 Service does not call at Contractors Terminal Facility through December 31, 2015 unless Carrier has similar regular liner service as it does on January 1, 2010 at Contractors Elizabeth, NJ Terminal. |
(6) | Should Carrier meet the obligations set forth in Section 2(g)(1)-(3) herein due to such other carrier having a contractual obligation in a container facility in the port where the TP1 Service calls, the exclusivity obligations will be reinstated upon the date of expiry of the vessel sharing agreement, space charter agreement, or similar agreement with such other carrier. |
8. | A new Section 2(h) is added to the Terminal Agreement as follows: Contractor has the first right of refusal for stevedoring Carriers Vessels in North America at Common User facilities. |
9. | Add a new Section 2(i) to the Terminal Agreement, as follows: |
3
10. | Section 3(a) of the Terminal Agreement is deleted in its entirety and replaced with the following: |
11. | A new Section 3(c) is added to the Terminal Agreement, as follows: |
(1) | If Contractor is unable to reach or regularly maintain gate turn times/berth/crane and productivity performance standards as set forth in Section 2.1.I.B. through 2.1.I.D. of Appendix I, as amended, of this Agreement, thereby adversely affecting Carrier, then both parties shall promptly meet to identify and resolve any issues. Carrier shall advise Contractor in writing of the failure of performance if meeting(s) at a local level did not result in resolution of the issues(s). |
(2) | Despite the implementation of resolution procedures, if Contractor is unable to maintain the performance standards as stated in 3(c)(1) on a regular basis, through no fault of Carrier, then Contractor, at its cost, will employ commercially reasonable measures to correct such performance shortfalls. |
(3) | If conditions which are the fault of Contractor become permanent and cannot be resolved by Contractor, then Carrier will have the right to terminate this Agreement for the Terminal(s) impacted by these performance standard shortfalls. Carrier must provide 90 days written notice after the resolution steps set forth above in Section 3(c)(1) and (2) above have been exhausted prior to terminating this Agreement for the Terminal(s) impacted |
4
12. | A new Section 6(d) is added to the Terminal Agreement, as follows: |
(1) | Genset Mounting and Dismounting |
(i) | Jacksonville: Contractor will to the extent possible keep gensets mounted to the chassis, provided the Carrier coordinates mount/dismount genset activity in writing to the Contactor. Contractor will follow Carriers instructions to the extent feasible but there is no penalty if not matched. |
(ii) | Los Angeles: Once Carrier has a dedicated genset and chassis fleet, Contractor will to the extent possible keep gensets mounted to the chassis, provided the Carrier coordinates mount/dismount genset activity in writing to the Contactor. Contractor will follow Carriers instructions to the extent feasible but there is no penalty if not matched. |
(iii) | Jacksonville and Los Angeles: In order to match empty reefers coming off the vessel to an under-slung genset chassis, the mechanics plug the reefer into the genset. If Carrier advises Contractor which genset to string and subsequently requests the unit to be unstring, then Contractor will bill Carrier to perform this activity. Contractor will provide back up for the activity by supplying the genset number and container number. In Los Angeles this service can only be provided once the Carrier has a dedicated genset and chassis fleet. |
(iv) | Jacksonville and Los Angeles: if a genset needs to be dismounted or serviced after receipt, then the drays, genset mount/dismount and grounding/mounting activities will be for Carriers account. |
(v) | Houston and Tacoma: Currently the services in 6(d) (1) (i), (ii) and (iii) are not available however if conditions change, Carrier and Contractor will discuss instituting these services at these locations. |
(2) | Pairing Reefers to Chassis with Gensets |
(i) | Jacksonville: To the extent possible, and based on Carriers instructions, Contractor will pair reefers to chassis with gensets from the ship or from the ground and no penalty if not matched. |
(ii) | Houston and Los Angeles: If there is a dedicated Carrier chassis and genset fleet then to the best possible extent Contractor will arrange for reefer street turns (empty reefers entering the facility from the street) to be received (gated in) without dismounting gensets. These units would then be provided for customer export bookings. If a genset needs to be dismounted or if a genset, chassis or container serviced after received, then the drays, genset mount/dismount and grounding/mounting activities will be for Carriers account. |
(iii) | Carrier and Contractor will form a working team to review the process of pairing reefers to chassis with gensets in Los Angeles. |
5
13. | A new Section 6(e) is added to the Terminal Agreement, as follows: |
(1) | Chassis Flip Charges apply in Los Angeles (mainly a wheeled operation) and Jacksonville (a wheeled operation). |
(2) | In Houston Contractor will not charge for flips of wheeled hazardous containers |
(3) | Except as set forth in Section 6(e) (1) and (2) herein, chassis flip charges apply to chassis flip services performed by Contractor hereunder. |
14. | A new Section 6(f) is added to the Terminal Agreement as follows: |
(1) | Contractor will work with Carrier in providing on Terminal asset management in 2011 as per sections 6(f) (2) through (5) below if Carrier changes to a dedicated fleet of chassis and gensets. If Carrier has a dedicated fleet of chassis and/or gensets, Carrier would then need to have visibility to any/all gate transactions involving chassis and genset equipment to include bare chassis gate movements. Carrier will be required to provide Contractor with a fleet file inclusive of a list of all Carrier chassis, containers and gensets. |
(2) | On Terminal asset inventories: System inventories for Carrier chassis designated as the owner chassis/gensets will be available through on line reports. |
(3) | Genset Inventories and Reconciliation: As requested by Carrier, Contractor can provide this on a man hour basis or at a mutually agreed to flat rate. |
(4) | Chassis Inventories and Reconciliation: As requested by Carrier, Contractor can provide this on a man hour basis or at a mutually agreed to flat rate. |
(5) | Contractor in conjunction with Carrier will define the process (i) to ensure loaded and empty containers are mounted on road-worthy chassis, and (ii) to identify and segregate deadlined chassis on the Terminal. This process will be included in the Working Procedures Manuals. |
6
15. | A new Section 6(g) is added to the Terminal Agreement as follows: |
(1) | Houston and Jacksonville: Contractor will assist Carrier with any claims to the Port Authority for Port Authority crane breakdowns. If the Port Authority reimburses or provides a payment to Contractor for the Port crane downtime then Contractor will remit these funds to Carrier. |
(2) | Los Angeles: |
(i) | Contractor will pre-mount * empty reefers and shift them to the pre-trip pad by the close of business of the shift following vessel discharge, if Carrier advises correct reefer types. Carrier will be charged per item no. 21 Premounting of Empties in the Second Revised Appendix II Rate Schedules. If Carrier does not advise correct reefer types and additional pre-mounts are required, any additional costs will be for Carriers account. This is in addition to the requirement to have * empty reefers positioned to the reefer pads daily. |
(ii) | On or after December 11, 2010, if the Carrier expands its international service as an ocean common carrier service using the TP1 vessel string, Contractor will have a separate area in the yard for Carrier loads; And |
(a) | Contractor will discharge * Carrier international cargo laden containers to wheels; and |
(b) | Parties will discuss and implement the appropriate services required to support Carrier customer service level for the TP1 Service. |
(3) | Tacoma: Carrier to utilize the pool of funds made available by the Port of Tacoma but will work with Contractor to prioritize the funds to consider investments in the Tacoma Terminal. |
(4) | Contractor and Carrier will work together to improve processes. Working Procedures Manuals to be updated in each Terminal within 60 days of signing Amendment No. 3 to this Agreement. |
16. | Section 10(b), (g), and (h) of the Terminal Agreement are deleted and replaced with the following: |
7
(i) | $1,000/package (a package being defined as including a unitized load, group or assemblage and shall include a, skid, pallet, cradle or the like) |
(ii) | The limitation under the Hague-Visby Rules as amended at Brussels December 21, 1979 (S.D.R. Protocol). |
17. | New Sections 10(o), (p), and (q) are added to the Terminal Agreement as follows: |
8
(i) | Notify Contractor, in advance and in writing of Carriers intention to reimburse Contractor for the cost of obtaining increased insurance to cover the additional risk imposed upon Contractor in such case; or |
(ii) | Indemnify Contractor against any liability in excess of Contractors maximum limitation amount as described in (g) above. |
18. | A new Section 12 (d) is added to the Terminal Agreement, as follows: |
19. | Section 15(c) of the Terminal Agreement is deleted and replaced with the following: Except for retroactive ILA or ILWU agreements and assessments: neither party shall be liable hereunder for charges if Contractor fails to bill for activity that occurred within six months from the date of the activity; neither party shall be required to return an overpayment to the other party if the party that overpaid fails to notify the other party within six months after the date of activity that resulted in such overpayment; and Carrier will not request a refund or dispute an invoice that has been paid that is older than six months. |
20. | A new Section 15(d) is added to the Terminal Agreement, as follows: |
If Carrier has a vessel sharing, space charter or similar agreement with respect to the TP1 vessel string, Contractor shall invoice vessel related terminal fees and expenses in accordance with the agreed split of such fees and expenses instructed by Carrier so long as such other carrier or carriers consent to such agreed split of fees and expenses in writing. |
21. | The Terminal Agreements Exhibit A is deleted and replaced in its entirety with the attached First Revised Exhibit A, which is made a part of this Amendment No. 3. All references to Exhibit A in the Terminal Agreement shall be changed to First Revised Exhibit A. |
22. | Section 2.1.I. of Appendix I of the Terminal Agreement is revised by redesignating it as Section 2.1.I.A. |
9
23. | New Sections 2.1.I.B., 2.1.I.C., and 2.1.I.D. are added to Appendix I of the Terminal Agreement as follows: |
(1 | ) | Houston. | Berth: | Thursday 0700 to Friday 0600 | ||||||||
Cranes: | Crane Density * cranes Thursday 0700 to 1800, * cranes Thursday 1900 to Friday 0600. Crane density provided crane split/moves allows for * or * cranes and cutoff procedures adhered to. | |||||||||||
Productivity: | * moves per hour, average moves per hour per crane per vessel operation. |
(2 | ) | Jacksonville | Berth: | Tuesday and Friday 0700 to 1800 | ||||||||
Cranes: | * cranes provided crane split and move count allows for * cranes. | |||||||||||
Productivity: | * moves per hour, average moves per hour per crane per vessel operation. |
(3 | ) | Los Angeles | Berth: | Thursday 0800 to Saturday 0500 and Sunday 0800 to Monday 0500 | ||||||||
Cranes: | * cranes provided crane split and move count allows for * cranes Friday 0800 to Saturday 0500 and * crane Thursday 0800 to 1800. | |||||||||||
From 2011, Contractor will provide * cranes on Thursday day or * crane Thursday second shift if change in inbound volumes requires the additional crane. | ||||||||||||
Productivity: | Contractor will complete the vessel by Saturday 0500 and Monday 0500 provided that split/moves allows, cargo cut offs are defined and agreed to in updated Working | |||||||||||
Procedures Manual and there were no circumstances beyond the control of Contractor which affected completion of vessel within the above pro forma window. | ||||||||||||
It is not the intent to work vessel on 2nd or 3rd shift Thursday. | ||||||||||||
Both teams to work together making shift ganging decisions that will not compromise Carriers vessel stow and customer service requirements nor will they impact the ability to stevedore an efficient and cost effective operation. | ||||||||||||
This section based on vessel capacities current as of January 1, 2010. |
10
(4 | ) | Tacoma | Berth: | ALA 1 Wednesday 0700 to Wednesday 2400 ALA 2 Friday 0700 to Friday 2400 PEX Sunday 0700 to Sunday 1800 | ||||||||
Cranes: | Sufficient cranes to complete vessel within pro forma window. | |||||||||||
Productivity: | Contractor will complete the vessels by Wednesday 2400 (2200 in winter months), and Friday 2400 (2200 in winter months) provided that split/moves allows for at least four crane split for 8 hours, cargo cut offs are defined and agreed to in updated Working Procedures Manual and there were no circumstances beyond the control of Contractor which affected completion of vessel within the above pro forma window. Contractor will complete PEX vessels by Sunday 1800. | |||||||||||
Both teams to work together making shift ganging decisions that will not compromise Carriers vessel stow and customer service requirements nor will they impact the ability to stevedore an efficient and cost effective operation. | ||||||||||||
This section is based on the vessel capacities current as of January 1, 2010. | ||||||||||||
Additional Agreement: | ||||||||||||
Tuesday 1800 to Wednesday 0700 Berth/Crane(s) will be made available if operationally feasible. | ||||||||||||
Thursday 1800 to Friday 0700 Berth/Crane(s) will be made available if operationally feasible. | ||||||||||||
Contractor acknowledges that Carrier may have a summer service that may require a berth/crane(s) on Monday. Contractor will review request for summer service annually on 60 day notice from Carrier and use best efforts to provide cranes and berth required. |
11
(1) | Houston: Contractor to achieve an average gate turn time of * minutes for a single transaction and * minutes for a double transaction. Contractor will also strive to achieve lower gate turn times of * minutes for a single transaction and * minutes for a double transaction. |
(2) | Jacksonville: Contractor to achieve an average gate turn time of * minutes for a single transaction and * minutes for a double transaction. Contractor will also strive to achieve lower gate turn times of * minutes for a single transaction and * minutes for a double transaction. |
(3) | Los Angeles: Contractor to achieve an average gate turn time of * minutes for a single transaction and * minutes for a double transaction for both domestic and international cargo. Contractor will also strive to achieve lower gate turn times of * minutes for a single transaction and * minutes for a double transaction. |
(i) | Contractor will provide flex gates on Friday 1st and 2nd shifts. |
(ii) | When Carrier no longer uses the equipment of another carrier which is also a customer of Contractorthat iswhen Carrier has its own separate and distinct equipment pool, Contractor will provide Carrier with a separate empty pile. |
(iii) | Contractor will work with Carrier to take actionable steps to reduce gate turn times for Carrier which includes the international requirements. |
(4) | Tacoma: Until such time as Contractor has another carrier on terminal, Contractor to achieve an average gate turn-time of * minutes for a single transaction and * minutes for a double transaction. If and when Contractor has another carrier on terminal, Contractor to achieve an average gate turn-time of * minutes for a single transaction and * minutes for a double transaction. Contractor will also strive to achieve lower gate turn times of * minutes for a single transaction and * minutes for a double transaction. |
(5) | In all cases, the turn time is measured from gate pedestal to out gate and does not include trouble transactions or Carrier not having sufficient good order equipment available. |
12
24. | All references to Appendix I in the Terminal Agreement shall be changed to Appendix I, as amended. |
25. | The Terminal Agreements Revised Appendix II is deleted and replaced in its entirety with the attached Second Revised Appendix II, which is made a part of this Amendment No. 3. All references to Appendix II and Revised Appendix II in the Terminal Agreement shall be changed to Second Revised Appendix II. |
26. | Effective Date. The Rates in Second Revised Appendix II shall become effective as of January 1, 2010, except as provided in Section 9 above. All other terms set forth in this Amendment No. 3 shall become effective as of June 7, 2010. |
27. | This Amendment No. 3 supersedes and replaces the terms and conditions of the Memorandum of Understanding among Horizon Lines, LLC, Horizon Lines of Alaska, LLC and APM Terminals North America, Inc. entered into as of January 27, 2010. |
28. | No Other Modification. The Terminal Agreement is only modified as set forth herein and in all other respects remains in full force and effect. |
29. | Governing Law. The validity, meaning and effect of this Amendment No. 3 shall be determined in accordance with the Applicable Law clause of the Terminal Agreement. |
30. | Counterparts. This Amendment No. 3 may be executed in two counterparts, each of which shall be deemed an original, but all of which together shall be constitute one and the same instrument. |
13
HORIZON LINES, LLC | ||||||
By: | /s/ Robert Zuckerman | |||||
Name: | Robert Zuckerman | |||||
Its: | Vice President | |||||
HORIZON LINES OF ALASKA, LLC | ||||||
By: | /s/ Robert Zuckerman | |||||
Name: | Robert Zuckerman | |||||
Its: | Vice President | |||||
APM TERMINALS NORTH AMERICA, INC. | ||||||
By: | /s/ Martin Oppenheimer | |||||
Name: | Martin Oppenheimer | |||||
Its: | Director, Contracting and Pricing |
14
EXCLUSIVE TERMINALS
This First Revised Exhibit A is attached to and made a part of the
Stevedoring and Terminal Services Agreement,
Dated May 9th, 2004, as amended
Among Horizon Lines, LLC, Horizon Lines of Alaska, LLC and APM Terminals North America, Inc.
Location of Terminal | Terminal Territory | |
Port Elizabeth, New Jersey | State of New York or New Jersey | |
Jacksonville, Florida | Range from Jacksonville, Florida to Savannah, Georgia | |
Los Angeles, California | Southern California | |
Tacoma, Washington | State of Washington | |
Houston, Texas or successor terminal In Houston, Texas | State of Texas |
15

Horizon Lines
Terminal Services Rates at
APM Terminals Jacksonville, FL
Rates Effective January 1, 2010 to September 30, 2010
1. A. Discharge or Load Base Rate per marine lift | $ | * | ||||||
B. Transshipment per move | $ | * | ||||||
C. Shifting Cell to Cell within the same hatch | $ | * | ||||||
D. Restowing container Cell to Dock to Cell | $ | * | ||||||
E. Overheight unit lifted with overheight spreader (no wires) | $ | * | per lift |
A. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge |
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates |
B. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling | ||
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates | ||
ii. | Contract charge for bundling / unbundling |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
C. | If the contractor locks (or unlocks) and secures empty flatracks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flats are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. | A. Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, and administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | $ | * per loaded reefer | |||||
B. Daily Reefer monitoring and electric charges per calendar day or portion thereof (minimum one day charge). | $ | * Daily charge | ||||||
First Calendar Day to receive a * discount from stated rate. | ||||||||
3. | Maintenance and Repair (M and R) Man Hour Rates |
ST $ * | OT $ * | DT $ * | DOT $ * |
Installing/Removing Gensets | 30 minutes at the applicable M and R man hour rate plus $* | |
Fueling Gensets | 12 minutes at the applicable M and R man hour rate | |
Stringing Gensets | 12 minutes at the applicable M and R man hour rate |
4. A. Standby / Guarantee per Gang per hour Straight Time | ||||
One Gang | $ * | |||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
B. Extra Labor / Heavy Lifts per Gang per hour Straight Time | ||||
One Gang | $ * | |||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
C. Detentions per Gang per hour Straight Time (See Appendix 1 Detentions for list of billable and non-billable detentions) | ||||
One Gang | $ * | |||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
5. Overtime Differentials per gang per hour | ||||
A. Overtime | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
2
B. Double Time | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
C. Double Overtime | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
D. Double Double Overtime | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * |
6. | Overtime Gate Charges Extra labor plus equipment per Items 13 and 12 below prorated between carriers based on percentage of moves utilizing gate outside standard terminal gate hours. Current standard gate hours are 0800 to 1700 Monday, Wednesday, and Thursday and 0700 to 1700 Tuesday and Friday. Holiday gates which are included in the base lift rate are stated on the attached schedule. | |
UMS reserves the right to change the standard gate hours if proforma or volume changes warrant it. If the terminal operator chooses to open during the lunch period or operate flex gates there will be no extra charge to the carrier. Overtime gate charges also apply to ILA holidays. Note: A flat fee of $ * will be charged for receiving containers between 1700 to 1900 hours on Friday. |
7. | Extra Gate Moves (exceeding the * gate moves included per vessel lift). Billing to be done on a calendar month basis. | $ | * per move | |||||||
8. | Mounting/Grounding | Straight Time $ * | ||||||||
Overtime $ * |
** | Subject to minimum labor guarantees |
9. | Miscellaneous Parts for Roadability Carrier to negotiate directly with M and R vendor. This is not applicable to Maersk owned chassis. |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
3
10. | Maintenance Carrier to handle directly with M and R vendor. |
11. | Drayage | |||
Customs Vacis/Security/Government exams | Per Terminal Tariff | |||
Other drays within terminal | $ * one way |
12. | Equipment Rental Rates (when ordered by Carrier; excludes operator) |
- Top Loader | $ * per hour | |||
- Yard Hustler | $ * per hour | |||
- Empty Handler | $ * per hour | |||
- Bombcart | $ * per hour | |||
- Container Crane | Per APM Terminals contract rate with Port Authority |
13. | Extra Labor Rates | Straight Time | $ * Double Time | $ * | ||||
Overtime | $ * Double Overtime | $ * | ||||||
14. | Dockage and Wharfage | Charged at APM Terminals contract rate with Port Authority. | ||||||
15. | Line Handling | Actual Man hours at Extra labor rates plus any man hour guarantees. |
16. | Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * gate moves or allowed mounting/grounding and will be billed $ * per container. (Excludes demurrage) |
17. | Terminal storage charges |
Storage of empty containers | $ * per unit per day |
Empty allowance will be determined by multiplying the Carriers container lift volume each month times * times the number of days in the month. Excess empty container days over such allowed free days will be charged monthly at the following rate per container per day. (Free Days = Lifts x * x Days in Period) | ||
Notwithstanding the means of calculating Carriers empty allowance stated above, the parties agree when the Contractor notifies the Carrier that empty storage of equipment meets or exceeds the storage cap, Carrier will be required to present the respective terminal with an empty evacuation plan to reduce the number of empties below the cap within a fourteen (14) day period. Daily storage cap is equal to * of the Carriers previous years annual throughput. |
18. | Demurrage | Terminal Operator will bill, collect, and retain demurrage from carrier according to the terminal tariff in effect on October 15, 2006. Below is the table of rates from the terminal tariff. |
Free time for export cargo is | * calendar days. | |
Free time for import cargo is | * business days for dry containers and * business days for temperature controlled containers. |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
4
Demurrage Rates (per 20/40 container per calendar day or part thereof) | |||||||||
Inbound/Outbound/Transshipments | |||||||||
I) | One to Ten (1 10) Days (first period) | ||||||||
Dry General Purpose containers/Non-operating Reefers | $ | * | |||||||
Operating Reefers | $ | * | |||||||
Flat Racks, Open Tops, and Special Equipment | $ | * | |||||||
Tank Containers | $ | * | |||||||
II) | Eleventh Day and Above (second period) | ||||||||
Dry General Purpose containers/Non-operating Reefers | $ | * | |||||||
Operating Reefers | $ | * | |||||||
Flat Racks, Open Tops, and Special Equipment | $ | * | |||||||
Tank Containers | $ | * |
19. | Lashing/Unlashing of breakbulk cargo on board vessel | Extra labor man hour rates plus materials at cost plus * | ||
20. | Bundling of Chassis/Flat Racks | $ * per chassis/flat plus materials |
** | Subject to minimum labor guarantees |
21. | Out of service equipment (containers and chassis) remaining on terminal in excess of * calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container/chassis per day. | |
If container is able to be stacked in a normal manner and fits in one container slot then storage only applies. (Item 17 above) |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
5
22. | Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Items 13 and 12 above). | |||||||
23. | Chassis Switching charge | Straight Time | $ * | |||||
Overtime | $ * | |||||||
To/From truckers equipment. From/To chassis. | ||||||||
Switching of reefer containers from underslung genset chassis. | . | |||||||
25. | Reefer Fuel will be charged based on the following formula: | |||||||
The total number of running reefers loaded and discharged from vessels and barges for the month times * times * gallons per reefer times the average cost of a gallon of reefer fuel for the month at fuel vendors charge to Contractor plus *. |
26. | Security Guard, on Overtime | $ * per hour |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
6

Terminal Services Rates at
APM Terminals Jacksonville, FL
Agreement Appendix V and VI
1. A. Discharge or Load Base Rate per marine lift | $ | * | ||||
i) Lift rate 1A will be discounted as follows: | ||||||
Calendar years 2011 and 2012 | $ * per lift discount | |||||
Calendar years 2013 through 2015 | $ * per lift discount | |||||
B. Transshipment per move | $ | * | ||||
C. Shifting Cell to Cell within the same hatch | $ | * | ||||
D. Restowing container Cell to Dock to Cell | $ | * | ||||
E. Overheight unit lifted with overheight spreader (no wires) | $ | * per lift |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
7
D. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge |
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates |
E. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling | ||
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates |
ii. | Contract charge for bundling / unbundling |
F. | If the contractor locks (or unlocks) and secures empty flatracks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flats are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. | A. Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, and administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | $ * per loaded reefer | ||
B. Daily Reefer monitoring and electric charges per calendar day or portion thereof (minimum one day charge). | $ * Daily charge | |||
First Calendar Day to receive a * discount from stated rate. | ||||
3. | Maintenance and Repair (M and R) Man Hour Rates |
ST $ * | OT $ * | DT $ * | DOT $ * |
Installing/Removing Gensets | 30 minutes at the applicable M and R man hour rate plus $ * | |
Fueling Gensets | 12 minutes at the applicable M and R man hour rate | |
Stringing Gensets | 12 minutes at the applicable M and R man hour rate |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
8
4. A. Standby / Guarantee per Gang per hour Straight Time | ||||
One Gang | $ * | |||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
B. Extra Labor / Heavy Lifts per Gang per hour Straight Time | ||||
One Gang | $ * | |||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
C. Detentions per Gang per hour Straight Time (See Appendix 1 Detentions for list of billable and non-billable detentions) | ||||
One Gang | $ * | |||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
5. Overtime Differentials per gang per hour | ||||
A. Overtime | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
B. Double Time | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
C. Double Overtime | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * | |||
D. Double Double Overtime | One Gang | $ * | ||
Two Gangs | $ * | |||
Three Gangs | $ * |
6. | Overtime Gate Charges Extra labor plus equipment per Items 13 and 12 below prorated between carriers based on percentage of moves utilizing gate outside standard terminal gate hours. Current standard gate hours are 0800 to 1700 Monday, Wednesday, and Thursday and 0700 to 1700 Tuesday and Friday. Holiday gates which are included in the base lift rate are stated on the attached schedule. | |
UMS reserves the right to change the standard gate hours if proforma or volume changes warrant it. If the terminal operator chooses to open during the lunch period or operate flex gates there will be no extra charge to the carrier. Overtime gate charges also apply to ILA holidays. | ||
Note: A flat fee of $ * will be charged for receiving containers between 1700 to 1900 hours on Friday. |
7. | Extra Gate Moves (exceeding the * gate moves included per vessel lift). Billing to be done on a calendar month basis. | $ | * per move | |||||||
8. | Mounting/Grounding | Straight Time $ * | ||||||||
Overtime $ * |
** | Subject to minimum labor guarantees |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
9
9. | Miscellaneous Parts for Roadability Carrier to negotiate directly with M and R vendor. | |
This is not applicable to Maersk owned chassis. | ||
10. | Maintenance Carrier to handle directly with M and R vendor. |
11. | Drayage | |||
Customs Vacis/Security/Government exams | Per Terminal Tariff | |||
Other drays within terminal | $ * one way |
12. | Equipment Rental Rates (when ordered by Carrier; excludes operator) |
- Top Loader | $ * per hour | |||
- Yard Hustler | $ * per hour | |||
- Empty Handler | $ * per hour | |||
- Bombcart | $ * per hour | |||
- Container Crane | Per APM Terminals contract rate with Port Authority |
13. | Extra Labor Rates | Straight Time | $ * Double Time | $ * | ||||
Overtime | $ * Double Overtime | $ * | ||||||
14. | Dockage and Wharfage | Charged at APM Terminals contract rate with Port Authority. | ||||||
15. | Line Handling | Actual Man hours at Extra labor rates plus any man hour guarantees. |
16. | Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * or allowed mounting/grounding and will be billed $ * per container. (Excludes demurrage) |
17. | Terminal storage charges |
Storage of empty containers | $ * per unit per day |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
10
parties agree when the Contractor notifies the Carrier that empty storage of equipment meets or exceeds the storage cap, Carrier will be required to present the respective terminal with an empty evacuation plan to reduce the number of empties below the cap within a fourteen (14) day period. Daily storage cap is equal to * of the Carriers previous years annual throughput.
18. | Demurrage | Terminal Operator will bill, collect, and retain demurrage from carrier according to the terminal tariff in effect on October 15, 2006. Below is the table of rates from the terminal tariff. |
Free time for export cargo is | * calendar days. | ||
Free time for import cargo is | * business days for dry containers and * business days for temperature controlled containers. |
Demurrage Rates (per 20/40 container per calendar day or part thereof) | |||||||||
Inbound/Outbound/Transshipments | |||||||||
I) | One to Ten (1 10) Days (first period) | ||||||||
Dry General Purpose containers/Non-operating Reefers | $ | * | |||||||
Operating Reefers | $ | * | |||||||
Flat Racks, Open Tops, and Special Equipment | $ | * | |||||||
Tank Containers | $ | * | |||||||
II) | Eleventh Day and Above (second period) | ||||||||
Dry General Purpose containers/Non-operating Reefers | $ | * | |||||||
Operating Reefers | $ | * | |||||||
Flat Racks, Open Tops, and Special Equipment | $ | * | |||||||
Tank Containers | $ | * |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO___ |
11
19. | Lashing/Unlashing of breakbulk cargo on board vessel | Extra labor man hour rates plus materials at cost plus * | ||||
20. | Bundling of Chassis/Flat Racks | $ * per chassis/flat plus materials |
** | Subject to minimum labor guarantees |
21. | Out of service equipment (containers and chassis) remaining on terminal in excess of * calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container/chassis per day. | |
If container is able to be stacked in a normal manner and fits in one container slot then storage only applies. (Item 17 above) | ||
22. | Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Items 13 and 12 above). |
23. | Chassis Switching charge | Straight Time | $ * | |||
Overtime | $ * | |||||
To/From truckers equipment. From/To chassis. Switching of reefer containers from underslung genset chassis. | ||||||
24. | Reefer Fuel will be charged based on the following formula: | |||||
The total number of running reefers loaded and discharged from vessels and barges for the month times * times * gallons per reefer times the average cost of a gallon of reefer fuel for the month at fuel vendors charge to Contractor plus *. | ||||||
Once Horizon has a dedicated genset fleet and upon Horizon providing a minimum 30 days advance notice in writing, fuel will be based on actual fuel placed in gensets. Cost will be based on the average weekly cost as published by government at the following web site (or similar web site if this site no longer exists) http://tonto.eia.doe.gov/oog/info/gdu/gasdiesel.asp |
25. | Security Guard, on Overtime | $ * per hour |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
12

Terminal Services Rates at
APM Terminals Los Angeles, CA
1. | A. | Discharge or Load Base Rate per marine lift | $ * | |||
B. | Transshipment per move | $ * | ||||
C. | Shifting Cell to Cell within the same hatch | $ * | ||||
D. | Restowing container Cell to Dock to Cell | $ * | ||||
E. | Overheight unit lifted with overheight spreader (no wires) | $ * per lift |
A. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge | ||
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
13
B. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling | ||
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates | ||
ii. | Contract charge for bundling / unbundling |
C. | If the contractor locks (or unlocks) and secures empty flatracks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flats are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. | A. | Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | $ * per loaded reefer | |||
B. | Daily Reefer monitoring and electric charges per calendar day or portion thereof (minimum one day) | $ * Daily charge | ||||
First Calendar Day to receive a * discount from stated rate. |
3. | Maintenance and Repair (M and R) Man Hour Rates |
1st Shift Straight Time | $ * | 1st Shift Overtime | $ * | |||
2nd Shift Straight Time | $ * | 2nd Shift Overtime | $ * | |||
3rd Shift Straight Time | $ * | 3rd Shift Overtime | $ * |
Installing or Removing Gensets | - 30 minutes at the applicable M and R man hour rate plus $ * | |
Fueling Gensets | - 12 minutes at the applicable M and R man hour rate | |
Fuel for Gensets: | - covered in item no. 27 | |
Stringing of Gensets | - 15 minutes at the applicable M and R man hour rate |
4. | A. | Standby/Guarantee per Gang per hour | ||||
Weekday, 1st Shift Straight Time | $ * | |||||
In addition, overtime differentials (Item 5) will apply based on period. | ||||||
B. | Extra Labor/Heavy Lifts per Gang per hour | |||||
Weekday, 1st Shift Straight Time | $ * | |||||
In addition, overtime differentials (Item 5) will apply based on period. |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
14
C. | Detentions per Gang per Hour | |||||
(See Appendix 1 Detentions for list of billable and non-billable detentions) | ||||||
Weekday, 1st Shift Straight Time | $ * | |||||
In addition, overtime differentials (Item 5) will apply based on period. |
5. | Overtime Differentials per Gang per hour |
Weekday, 2nd Shift | $ * | Weekend, 3rd Shift | $ * | |||
Weekday, 3rd Shift | $ * | Holiday, 1st/2nd Shift Weekday | $ * | |||
Weekend, 1st Shift | $ * | Holiday, 3rd Shift Weekday | $ * | |||
Weekend, 2nd Shift | $ * |
6. | Overtime Gate Charges Extra labor plus equipment per Items 14 and 12 prorated between Carriers based on percentage of moves utilizing gate. Terminal to charge only when outside of First and Second shift on straight time workdays (i.e. Monday through Friday excluding Holidays). Holiday gates which are included in the base lift rate are stated on attached schedule. Flex gate on first and second shift Friday will be provided at no extra charge. |
7. | Extra Gate Moves (exceeding the * gate moves included per vessel lift). Billing to be done on a calendar month basis. | $ * per move |
8. | Mounting/Grounding | Weekday, 1st Shift | $ * per move | |||
Weekday, 2nd Shift | $ * per move | |||||
Weekday, 3rd Shift | $ * per move | |||||
Weekend, 1st/2nd Shift | $ * per move | |||||
Weekend, 3rd Shift | $ * per move |
** | Subject to minimum labor guarantee |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
15
9. | Miscellaneous Parts for Roadability Carrier to handle directly with M and R vendor. This is not applicable to Maersk owned chassis. |
10. | Lashing/Unlashing of breakbulk cargo on board vessel | Extra labor man hour rates plus materials at cost plus * |
11. | This item intentionally left blank. | |
12. | Equipment Rental Rates (when ordered by Carrier; excludes operator) |
- Top Loader | $ * per hour | |
- Yard Hustler | $ * per hour | |
- Empty Handler | $ * per hour | |
- Transtainer | $ * per hour | |
- Bombcart | $ * per hour | |
- Container Crane | $ * per hour |
13. | Container lift on/lift off Rail Car at on dock rail facility | $ * per lift | ||
14. | Extra Labor Rates per man hour subject to minimum guarantees |
Weekday, 1st Shift | $ * | Weekend, 1st Shift | $ * | |||
Weekday, 2nd Shift | $ * | Weekend, 2nd Shift | $ * | |||
Weekday, 3rd Shift | $ * | Weekend, 3rd Shift | $ * |
15. | Line Handling Carrier to handle payment directly with vendor. | |
16. | Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * gate moves or allowed mounting/grounding and will be billed $ * per container for receipt/delivery (Excludes demurrage). |
17. | Terminal storage charges |
Storage of empty containers | $ * per unit per day |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
16
18. | Demurrage Terminal Operator will bill, collect, and retain demurrage from carrier according to the terminal tariff. |
19. | Custom Vacis/Security /USDA Exams/other government exams | Per Terminal Tariff | ||||
Other drays within terminal premises not associated with throughput cycle. | $ * one way | |||||
20. | Bundling of Chassis/Flat Racks, | Weekday, 1st Shift | $ * per chassis/flat bundled plus materials | |||
21. | Premounting of Empties | Weekday, 1st Shift | $ * per unit | |||
Weekday, 2nd Shift | $ * per unit |
22. | Out of service equipment (containers and chassis) remaining on terminal in excess of * calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container per day. | |
If container is able to be stacked in a normal manner and fits in one container slot then storage (Item 17) only applies. | ||
23. | Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Items 14 and 12 above). | |
24. | Fuel Surcharge (as of January 2010) $ * per lift Fuel Surcharge is based on the Bureau of Labor Statistics Producer Price Index No 2 Diesel Fuel with February 2004 to February 2005 as the basis. This will be reviewed / adjusted once a year if fuel prices fall below the February 2005 level and eliminated if prices fall below the February 2004 level. |
25. | Chassis Switching charge | Weekday, 1st Shift | $ * per move | |||
Weekday, 2nd Shift | $ * per move | |||||
Weekday, 3rd Shift | $ * per move | |||||
Weekend, 1st/2nd Shift | $ * per move | |||||
Weekend, 3rd Shift | $ * per move |
Switching of reefer containers from underslung genset chassis
** | Subject to minimum labor guarantees |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
17
26. | Reefer Fuel will be charged based on the following formula | |
The total number of running reefers loaded and discharged from vessels and barges for the month times * times * gallons per reefer times the average cost of a gallon of reefer fuel for the month at fuel vendors charge to Contractor plus *. | ||
Once Horizon has a dedicated genset fleet and upon Horizon providing a minimum 30 days advance notice in writing, fuel will be based on actual fuel placed in gensets. Cost will be based on the average weekly cost as published by government at the following web site (or similar web site if this site no longer exists) http://tonto.eia.doe.gov/oog/info/gdu/gasdiesel.asp |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
18

Terminal Services Rates at
APM Terminals Los Angeles, CA
Agreement Appendix V and VI
1. A. | Discharge or Load Base Rate per marine lift up to * lifts per calendar year | $ | * | |||
* lifts and above per calendar year | $ | * |
B. | Transshipment per move | $ | * | |||||||
C. | Shifting Cell to Cell within the same hatch | $ | * | |||||||
D. | Restowing container Cell to Dock to Cell | $ | * | |||||||
E. | Overheight unit lifted with overheight spreader (no wires) | $ | * | per lift |
Horizon Lines Initials _TC____ | ||
Second Revised Appendix II | APMT Initials _MO____ |
19
G. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge |
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates |
H. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling |
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates | ||
ii. | Contract charge for bundling / unbundling |
I. | If the contractor locks (or unlocks) and secures empty flatracks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flats are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. A. | Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | $ * per loaded reefer | ||||
B. | Daily Reefer monitoring and electric charges per calendar day or portion thereof (minimum one day) | $ * Daily charge | ||||
First Calendar Day to receive a * discount from stated rate. |
Horizon Lines Initials _TC____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
20
3. | Maintenance and Repair (M and R) Man Hour Rates | |||||||
1st Shift Straight Time | $ * | 1st Shift Overtime | $ * | |||||
2nd Shift Straight Time | $ * | 2nd Shift Overtime | $ * | |||||
3rd Shift Straight Time | $ * | 3rd Shift Overtime | $ * |
Installing or Removing Gensets | - 30 minutes at the applicable M and R man hour rate plus $ * | |||
Fueling Gensets | - 12 minutes at the applicable M and R man hour rate | |||
Fuel for Gensets: | - covered under item no. 27 | |||
Stringing of Gensets | - 15 minutes at the applicable M and R man hour rate |
4. A. | Standby/Guarantee per Gang per hour | |||
Weekday, 1st Shift Straight Time | $ * |
B. | Extra Labor/Heavy Lifts per Gang per hour | |||||||
Weekday, 1st Shift Straight Time | $ | * |
C. | Detentions per Gang per Hour (See Appendix 1 Detentions for list of billable and non-billable detentions) | |||||||
Weekday, 1st Shift Straight Time | $ | * |
5. | Overtime Differentials per Gang per hour | |||||||||||||
Weekday, 2nd Shift | $ * | Weekend, 3rd Shift | $ | * | ||||||||||
Weekday, 3rd Shift | $ * | Holiday, 1st/2nd Shift Weekday | $ | * | ||||||||||
Weekend, 1st Shift | $ * | Holiday, 3rd Shift Weekday | $ | * | ||||||||||
Weekend, 2nd Shift | $ * |
6. | Overtime Gate Charges Extra labor plus equipment per Items 14 and 12 prorated between Carriers based on percentage of moves utilizing gate. Terminal to charge only when outside of First and Second shift on straight time workdays (i.e. Monday through Friday excluding Holidays). Holiday gates which are included in the base lift rate are stated on attached schedule. Flex gate on first and second shift Friday will be provided at no extra charge. |
7. | Extra Gate Moves (exceeding the * gate moves included per vessel lift). Billing to be done on a calendar month basis. | $ * per move |
Horizon Lines Initials _TC____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
21
8. | Mounting/Grounding | Weekday, 1st Shift | $ * per move | ||||||||
Weekday, 2nd Shift | $ * per move | ||||||||||
Weekday, 3rd Shift | $ * per move | ||||||||||
Weekend, 1st/2nd Shift | $ * per move | ||||||||||
Weekend, 3rd Shift | $ * per move |
** | Subject to minimum labor guarantee |
9. | Miscellaneous Parts for Roadability Carrier to handle directly with M and R vendor. This is not applicable to Maersk owned chassis. |
10. | Lashing/Unlashing of breakbulk cargo on board vessel | Extra labor man hour rates plus materials at cost plus * percent |
11. | This item intentionally left blank. |
12. | Equipment Rental Rates (when ordered by Carrier; excludes operator) |
- Top Loader - - Yard Hustler - - Empty Handler - - Transtainer - - Bombcart - - Container Crane | $ * per hour $ * per hour $ * per hour $ * per hour $ * per hour $ * per hour |
13. | Container lift on/lift off Rail Car at on dock rail facility | $ * per lift | |||||||||
14. | Extra Labor Rates per man hour subject to minimum guarantees |
Weekday, 1st Shift | $ * | Weekend, 1st Shift | $ * | |||||
Weekday, 2nd Shift | $ * | Weekend, 2nd Shift | $ * | |||||
Weekday, 3rd Shift | $ * | Weekend, 3rd Shift | $ * |
Horizon Lines Initials _TC_____ | ||
Second Revised Appendix II | APMT Initials _MO_____ |
22
15. | Line Handling Carrier to handle payment directly with vendor. |
16. | Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * gate moves or allowed mounting/grounding and will be billed $ * per container for receipt/delivery (Excludes demurrage). |
17. | Terminal storage chargesc Storage of empty containers | $ | * | per unit per day |
18. | Demurrage Terminal Operator will bill, collect, and retain demurrage from carrier according to the terminal tariff. |
19. | Custom Vacis/Security /USDA Exams/other government exams | Per Terminal Tariff | ||||
Other drays within terminal premises not associated with throughput cycle. | $ | * | one way | |||
20. | Bundling of Chassis/Flat Racks, Weekday, 1st Shift | $ | * | per chassis/flat bundled plus materials | ||
21. | Premounting of Empties Weekday, 1st Shift | $ | * | per unit | ||
Weekday, 2nd Shift | $ | * | per unit |
22. | Out of service equipment (containers and chassis) remaining on terminal in excess of * calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container per day. |
Second Revised Appendix II | APMT Initials _MO___ |
23
23. | Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Items 14 and 12 above). |
24. | Fuel Surcharge as of January 2010 Fuel Surcharge is based on the Bureau of Labor Statistics Producer Price Index No 2 Diesel Fuel with February 2004 to February 2005 as the basis. This will be reviewed / adjusted once a year if fuel prices fall below the February 2005 level and eliminated if prices fall below the February 2004 level. | $ | * | per lift | ||||||
25. | Chassis Switching charge | Weekday, 1st Shift | $ | * | per move | |||||
Weekday, 2nd Shift | $ | * | per move | |||||||
Weekday, 3rd Shift | $ | * | per move | |||||||
Weekend, 1st/2nd Shift | $ | * | per move | |||||||
Weekend, 3rd Shift | $ | * | per move |
Switching of reefer containers from underslung genset chassis
** | Subject to minimum labor guarantees |
26. | Reefer Fuel will be charged based on the following formula The total number of running reefers loaded and discharged from vessels and barges for the month times * times * gallons per reefer times the average cost of a gallon of reefer fuel for the month at fuel vendors charge to Contractor plus *. |
Second Revised Appendix II | APMT Initials _MO___ |
24

Terminal Services Rates at
APM Terminals Tacoma, WA
1. A. | Discharge or Load Base Rate per marine lift | $ * | ||
B. | Transshipment per move | $ * | ||
C. | Shifting Cell to Cell within the same hatch | $ * | ||
D. | Restowing container Cell to Dock to Cell | $ * | ||
E. | Overheight unit lifted with overheight spreader (no wires) | $ * per lift |
* | Specifically, |
Drivers receiving /delivering live reefers must be processed by * hours.
Drivers receiving import loads must be processed by * hours.
Drivers delivering wheeled export loads (except live reefers) must be processed by *.
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
25
J. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge | ||
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates |
K. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling | ||
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates | ||
ii. | Contract charge for bundling / unbundling |
L. | If the contractor locks (or unlocks) and secures empty flatracks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flats are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. A. | Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | $ * per loaded reefer | ||
B. | Daily Reefer monitoring and electric charges per calendar day or portion thereof (minimum one day charge) | $ * Daily charge |
3. | Maintenance and Repair (M and R) Man Hour Rates | |||||||
1st Shift Straight Time | $ * | 1st Shift Overtime | $ * | |||||
2nd Shift Straight Time | $ * | 2nd Shift Overtime | $ * | |||||
3rd Shift Straight Time | $ * | 3rd Shift Overtime | $ * |
Installing or Removing Gensets | - 30 minutes at the applicable M and R man hour rate plus $ * | |
Fueling Gensets | - 12 minutes at the applicable M and R man hour rate | |
Stringing of Gensets | - 15 minutes at the applicable M and R man hour rate |
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
26
4. A. | Standby/Guarantee per Gang per hour | |||
Weekday, 1st Shift Straight Time | $ * |
B. | Extra Labor/Heavy Lifts per Gang per hour | |||
Weekday, 1st Shift Straight Time | $ * |
C. | Detentions per Gang per Hour | |||
(See Appendix 1 Detentions for list of billable and non-billable detentions) | ||||
Weekday, 1st Shift Straight Time | $ * |
5. | Overtime Differentials per gang per hour | |||||||
Weekday, 2nd Shift | $ * | Weekend, 3rd Shift | $ * | |||||
Weekday, 3rd Shift | $ * | Holiday, 1st/2nd Shift Weekday | $ * | |||||
Weekend, 1st Shift | $ * | Holiday, 3rd Shift Weekday | $ * | |||||
Weekend, 2nd Shift | $ * |
6. | Overtime Gate Charges Extra labor plus equipment per Items 13 and 12 below prorated between carriers based on percentage of moves utilizing gate outside standard terminal gate hours. Current standard gate hours are 0800 to 1700 Monday through Friday on straight time workdays. If the terminal operator chooses to open during the lunch period or operate flex gates there will be no extra charge to the carrier. Overtime gate charges also apply to ILWU holidays. Holiday gates which are included in the base lift rate are stated on attached schedule. | |
A flat rate will apply for second shift gate on Tuesday or Thursday of $ * per shift, and a flat rate on Wednesday or Friday of $ * per shift. If Horizon Lines wishes to remain open from 1700 -1800 any night this cost will be absorbed by Horizon Lines. | ||
A flat rate of $ * will be charged for 1st /2nd shift gate on Saturdays. This was increased in August 2008. |
7. | Extra Gate Moves (exceeding the * gate moves included per vessel lift). Billing to be done on a calendar month basis. | $ * per move |
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
27
8. | Mounting/Grounding | Weekday, 1st Shift | $ * per move | |||
Weekday, 2nd Shift | $ * per move | |||||
Weekday, 3rd Shift | $ * per move | |||||
Weekend, 1st/2nd Shift | $ * per move | |||||
Weekend, 3rd Shift | $ * per move |
** | Subject to minimum labor guarantees |
Mounting and Grounding will only be charged when performed outside of the normal throughput cycle. This includes but is not limited to digging out empty containers by container number, for sale containers, off hire containers, containers moving to/from repair, unusual requests requiring restacking of full containers, etc. Each container that is required to be handled within stack to carry out request will be charged a mount and/or ground fee. Also, this would apply if there is an overall change by Horizon Lines in the mode of operation. This rate will include drayage of container within the terminal. In regards to For Sale and Off Hire containers, if a trucker requests a specific container number, then Contractor will charge a mounting/grounding charge per move shifted/handled, excluding the move for the container delivered. | ||
In addition, in the event that the Carrier changes its mode of operation or makes a special request to the Contractor not covered by this Agreement, in either case, Contractor reserves the right to order a dedicated yard detail and charge Carrier at Extra labor plus equipment rates (Items 13 and 12 below). | ||
Mounting/Grounding charges do not apply to the switch out of insulated containers occurring two times per year however drayage charges do apply. | ||
9. | Miscellaneous Parts for Roadability Carrier to handle directly with M and R vendor. This is not applicable to Maersk owned chassis. |
10. | Lashing/Unlashing of breakbulk cargo on board vessel | Extra labor man hour rates plus materials at cost plus * percent |
11. | Maintenance Carrier to handle directly with M and R vendor. |
12. | Equipment Rental Rates (when ordered by Carrier; excludes operator) | |||
- Top Loader | $ * per hour | |||
- Yard Hustler | $ * per hour | |||
- Empty Handler | $ * per hour | |||
- Transtainer | $ * per hour | |||
- Bombcart | $ * per hour | |||
- Container Crane | $ * per hour |
13. | Extra Labor Rates per man hour subject to minimum guarantees | |||||||
Weekday, 1st Shift | $ * | Weekend, 1st Shift | $ * | |||||
Weekday, 2nd Shift | $ * | Weekend, 2nd Shift | $ * | |||||
Weekday, 3rd Shift | $ * | Weekend, 3rd Shift | $ * | |||||
14. | Line Handling Carrier to make payment directly to vendor. |
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
28
15. | Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * gate moves or allowed mounting/grounding and will be billed $ * per container for receipt/delivery (Excludes demurrage). |
16. | Terminal storage charges | |||
Storage of empty containers | $ * per unit per day |
17. | Demurrage Terminal Operator will bill, collect, and retain demurrage from carrier per terminal tariff in effect on October 15, 2006. Below is table of rates from terminal tariff. |
Charge per Day for the | Charge per Day for Each | |||||||
1st Five Days or | Additional Day Over | |||||||
Fraction Thereof | Five Days or Fraction Thereof | |||||||
Inbound | ||||||||
Up to 20 ft | $ | * | $ | * | ||||
Over 20 ft to 40 ft | $ | * | $ | * | ||||
Over 40 ft | $ | * | $ | * | ||||
Outbound | ||||||||
20 ft | $ | * | $ | * | ||||
Over 20 ft to 40 ft | $ | * | $ | * | ||||
Over 40 ft | $ | * | $ | * |
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
29
18. | Customs Vacis/Security/USDA Exams/Other government exams | Per Terminal Tariff | ||
Other drays within terminal premises not associated with throughput cycle. | $ * one way | |||
Dray charge to empty annex lot for seasonal equipment change | $ * per container | |||
19. | Bundling of Chassis/Flat Racks, Weekday, 1st Shift | $ * per chassis/flat bundled plus materials |
20. | Out of service equipment (containers and chassis) remaining on terminal in excess of * calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container per day. |
21. | Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Items 13 and 12 above). |
22. | Fuel Surcharge as of January 2010 | $ * per lift |
23. | Chassis Switching charge | Weekday, 1st Shift | $ * per move | |||
Weekday, 2nd Shift | $ * per move | |||||
Weekday, 3rd Shift | $ * per move | |||||
Weekend, 1st/2nd Shift | $ * per move | |||||
Weekend, 3rd Shift | $ * per move |
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
30
Switching of reefer containers from underslung genset chassis
** | Subject to minimum labor guarantees |
24. | Reefer Fuel will be charged based on the following formula: | |
The total number of running reefers loaded and discharged from vessels and barges for the month times * times * gallons per reefer times the average cost of a gallon of reefer fuel for the month at fuel vendors charge to Contractor plus *. |
25. | Security Guard man hour rates when requested by Horizon | $ * per man hour |
26. | A copy of the Interim Local Agreement for CY Empty Storage is attached hereto and made a part of the Second Revised Appendix II relating to Tacoma. |
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
31
1. | APMT will no longer move Horizon Lines equipment to the dirt lot, but rather, the equipment would be stored in the APM Terminals CY. | ||
2. | The daily CY storage empty cap will be * empties. A flat rate will be charged for the storage of empties at $ * per month when at or below * empties. | ||
3. | APM Terminals will notify Horizon Lines when the storage of empty containers exceeds the cap of * empties. Horizon Lines will be required to present APM Terminals with an empty evacuation plan to reduce to number of empties below the cap within a fourteen (14) day period from the time of notification. The movement of empties (inside the terminal) associated with reducing the CY storage count will be charged as the mounting and grounding rate under section 8 of the Terminal Services Agreement. Other related charges would be for Horizon Lines account. |
Horizon Lines | APM Terminals Pacific Ltd. | |||||
/s/ Chris Novosad | /s/ Jonathan R. Goldmer | |||||
Signature | Signature | |||||
Chris Novosad | Jonathan R. Goldmer | |||||
Name | Name | |||||
9/23/09 | 9/23/09 | |||||
Date | Date |
Horizon Lines Initials TC | ||
Second Revised Appendix II | APMT Initials MO |
32

Terminal Services Rates at
APM Terminals Tacoma, WA
as per Contract Appendix V and VI
1. | A. Discharge or Load Base Rate per marine lift | $ * | ||||
B. Transshipment per move | $ * | |||||
C. Shifting Cell to Cell within the same hatch | $ * | |||||
D. Restowing container Cell to Dock to Cell | $ * | |||||
E. Overheight unit lifted with overheight spreader (no wires) | $ * | per lift |
Second Revised Appendix II | APMT Initials _MO___ |
33
* | Specifically, |
Drivers receiving /delivering live reefers must be processed by * hours.
Drivers receiving import loads must be processed by * hours.
Drivers delivering wheeled export loads (except live reefers) must be processed by *.
M. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge |
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates |
N. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling | ||
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates | ||
ii. | Contract charge for bundling / unbundling |
O. | If the contractor locks (or unlocks) and secures empty flatracks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flats are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. | A. | Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | $ * per loaded reefer |
Second Revised Appendix II | APMT Initials _MO___ |
34
B. | Daily Reefer monitoring and electric charges per calendar day or | $ * Daily charge | ||||
portion thereof (minimum one day charge) | ||||||
First Calendar Day to receive a * discount from stated rate. |
3. | Maintenance and Repair (M and R) Man Hour Rates |
1st Shift Straight Time | $ * | 1st Shift Overtime | $ * | |||||
2nd Shift Straight Time | $ * | 2nd Shift Overtime | $ * | |||||
3rd Shift Straight Time | $ * | 3rd Shift Overtime | $ * | |||||
Installing or Removing Gensets | - 30 minutes at the applicable M and R man hour rate plus $ * | |||||||
Fueling Gensets | - 12 minutes at the applicable M and R man hour rate | |||||||
Stringing of Gensets | - 15 minutes at the applicable M and R man hour rate |
4. | A. Standby/Guarantee per Gang per hour |
Weekday, 1st Shift Straight Time | $ * |
B. | Extra Labor/Heavy Lifts per Gang per hour |
Weekday, 1st Shift Straight Time | $ * |
C. | Detentions per Gang per Hour (See Appendix 1 Detentions for list of billable and non-billable detentions) |
Weekday, 1st Shift Straight Time | $ * |
5. | Overtime Differentials per gang per hour |
Weekday, 2nd Shift | $ * | Weekend, 3rd Shift | $ * | |||||
Weekday, 3rd Shift | $ * | Holiday, 1st/2nd Shift Weekday | $ * | |||||
Weekend, 1st Shift | $ * | Holiday, 3rd Shift Weekday | $ * | |||||
Weekend, 2nd Shift | $ * |
6. | Overtime Gate Charges Extra labor plus equipment per Items 13 and 12 below prorated between carriers based on percentage of moves utilizing gate outside standard terminal gate hours. Current standard gate hours are 0800 to 1700 Monday through Friday on straight time workdays. If the terminal operator chooses to open during the lunch period or operate flex gates there will be no extra charge to the carrier. Overtime gate charges also apply to ILWU holidays. Holiday gates which are included in the base lift rate are stated on attached schedule. |
Second Revised Appendix II | APMT Initials _MO___ |
35
A flat rate will apply for second shift gate on Tuesday or Thursday of $ * per shift, and a flat rate on Wednesday or Friday of $ * per shift. If Horizon Lines wishes to remain open from 1700 -1800 any night this cost will be absorbed by Horizon Lines. | ||
A flat rate of $ * will be charged for 1st /2nd shift gate on Saturdays. This was increased in August 2008. |
7. | Extra Gate Moves (exceeding the * gate moves included per | $ * per move | ||
vessel lift). Billing to be done on a calendar month basis. |
8. | Mounting/Grounding | Weekday, 1st Shift | $ * per move | |||
Weekday, 2nd Shift | $ * per move | |||||
Weekday, 3rd Shift | $ * per move | |||||
Weekend, 1st/2nd Shift | $ * per move | |||||
Weekend, 3rd Shift | $ * per move | |||||
** | Subject to minimum labor guarantees |
Mounting and Grounding will only be charged when performed outside of the normal throughput cycle. This includes but is not limited to digging out empty containers by container number, for sale containers, off hire containers, containers moving to/from repair, unusual requests requiring restacking of full containers, etc. Each container that is required to be handled within stack to carry out request will be charged a mount and/or ground fee. Also, this would apply if there is an overall change by Horizon Lines in the mode of operation. This rate will include drayage of container within the terminal. In regards to For Sale and Off Hire containers, if a trucker requests a specific container number, then Contractor will charge a mounting/grounding charge per move shifted/handled, excluding the move for the container delivered. | ||
In addition, in the event that the Carrier changes its mode of operation or makes a special request to the Contractor not covered by this Agreement, in either case, Contractor reserves the right to order a dedicated yard detail and charge Carrier at Extra labor plus equipment rates (Items 13 and 12 below). | ||
Mounting/Grounding charges do not apply to the switch out of insulated containers occurring two times per year however drayage charges do apply. | ||
9. | Miscellaneous Parts for Roadability Carrier to handle directly with M and R vendor. This is not applicable to Maersk owned chassis. |
10. | Lashing/Unlashing of breakbulk cargo on board vessel | Extra labor man hour rates plus materials at cost plus * percent |
11. | Maintenance Carrier to handle directly with M and R vendor. |
Second Revised Appendix II | APMT Initials _MO___ |
36
12. | Equipment Rental Rates (when ordered by Carrier; excludes operator) |
- Top Loader | $ * per hour | |
- Yard Hustler | $ * per hour | |
- Empty Handler | $ * per hour | |
- Transtainer | $ * per hour | |
- Bombcart | $ * per hour | |
- Container Crane | $ * per hour |
13. | Extra Labor Rates per man hour subject to minimum guarantees |
Weekday, 1st Shift | $ * | Weekend, 1st Shift | $ * | |||
Weekday, 2nd Shift | $ * | Weekend, 2nd Shift | $ * | |||
Weekday, 3rd Shift | $ * | Weekend, 3rd Shift | $ * |
14. | Line Handling Carrier to make payment directly to vendor. |
15. | Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * gate moves or allowed mounting/grounding and will be billed $ * per container for receipt/delivery (Excludes demurrage). |
16. | Terminal storage charges |
Storage of empty containers | $ * per unit per day |
17. Demurrage | Terminal Operator will bill, collect, and retain demurrage from carrier per terminal tariff in effect on October 15, 2006. Below is table of rates from terminal tariff. |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
37
Charge per Day for the | ||||||
1st Five Days or | Charge per Day for Each Additional Day Over | |||||
Fraction Thereof | Five Days or Fraction Thereof | |||||
Inbound | ||||||
Up to 20 ft | $ | * | $ | * | ||
Over 20 ft to 40 ft | $ | * | $ | * | ||
Over 40 ft | $ | * | $ | * | ||
Outbound | ||||||
20 ft | $ | * | $ | * | ||
Over 20 ft to 40 ft | $ | * | $ | * | ||
Over 40 ft | $ | * | $ | * |
18. | Customs Vacis/Security/USDA Exams/Other government exams | Per Terminal Tariff | ||
Other drays within terminal premises not associated with throughput cycle. | $ * one way | |||
Dray charge to empty annex lot for seasonal equipment change | $ * per container | |||
19. | Bundling of Chassis/Flat Racks, Weekday, 1st Shift | $ * per chassis/flat bundled plus materials |
20. | Out of service equipment (containers and chassis) remaining on terminal in excess of 30 calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container per day. |
Horizon Lines Initials __TC_____ | ||
Second Revised Appendix II | APMT Initials __MO_____ |
38
21. Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Items 13 and 12 above). | ||||
22. Fuel Surcharge as of January 2010 | $ * per lift | |||
Fuel Surcharge is based on the Bureau of Labor Statistics Producer Price Index No 2 Diesel Fuel with February 2004 to February 2005 as the basis. This will be reviewed / adjusted once a year if fuel prices fall below the February 2005 level and eliminated if prices fall below the February 2004 level. |
23. Chassis Switching charge | Weekday, 1st Shift | $ * per move | ||
Weekday, 2nd Shift | $ * per move | |||
Weekday, 3rd Shift | $ * per move | |||
Weekend, 1st/2nd Shift | $ * per move | |||
Weekend, 3rd Shift | $ * per move |
To/From truckers equipment From/To chassis | ||||
Switching of reefer containers from underslung genset chassis |
** | Subject to minimum labor guarantees |
24. Reefer Fuel will be charged based on the following formula: | ||||
The total number of running reefers loaded and discharged from vessels and barges for the month times * times * gallons per reefer times the average cost of a gallon of reefer fuel for the month at fuel vendors charge to Contractor plus *. | ||||
Once Horizon has a dedicated genset fleet and upon Horizon providing a minimum 30 days advance notice in writing, fuel will be based on actual fuel placed in gensets. Cost will be based on the average weekly cost as published by government at the following web site (or similar web site if this site no longer exists) http://tonto.eia.doe.gov/oog/info/gdu/gasdiesel.asp | ||||
25. Security Guard man hour rates when requested by Horizon hour | $ * per man | |||
26. A copy of the Interim Local Agreement for CY Empty Storage is attached hereto and made a part of the Second Revised Appendix II relating to Tacoma |
Second Revised Appendix II | APMT Initials _MO___ |
39
1. | APMT will no longer move Horizon Lines equipment to the dirt lot, but rather, the equipment would be stored in the APM Terminals CY. |
2. | The daily CY storage empty cap will be * empties. A flat rate will be charged for the storage of empties at $ * per month when at or below * empties. |
3. | APM Terminals will notify Horizon Lines when the storage of empty containers exceeds the cap of * empties. Horizon Lines will be required to present APM Terminals with an empty evacuation plan to reduce to number of empties below the cap within a fourteen (14) day period from the time of notification. The movement of empties (inside the terminal) associated with reducing the CY storage count will be charged as the mounting and grounding rate under section 8 of the Terminal Services Agreement. Other related charges would be for Horizon Lines account. |
Horizon Lines | APM Terminals Pacific Ltd. | |||
/s/ Chris Novosad | /s/ Jonathan R. Goldmer | |||
Chris Novosad | Jonathan R. Goldmer | |||
9/23/09 | 9/23/09 |
Second Revised Appendix II | APMT Initials _MO___ |
40

Terminal Services Rates at
APM Terminals Houston, TX
1. A. Discharge or Load Base Rate per marine lift | $ * | |
B. Transshipment per move | $ * | |
C. Shifting Cell to Cell within the same hatch | $ * | |
D. Restowing container Cell to Dock to Cell | $ * | |
E. Overheight unit lifted with overheight spreader (no wires) | $ * per lift |
A. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge |
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates plus mounting or grounding charge |
Second Revised Appendix II | APMT Initials _MO___ |
41
B. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling | ||
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates | ||
ii. | Contract charge for bundling / unbundling | ||
iii. | Mounting or grounding charge for each chassis or flat |
C. | If the contractor locks (or unlocks) and secures empty flat racks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flat racks are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. A. Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | ||
$ * per loaded reefer | ||
B. Daily Reefer monitoring and electric charges per calendar day or | $ * Daily charge | |
portion thereof (minimum one day charge) | ||
First Calendar Day to receive a * discount from stated rate |
3. See Item 9 for Maintenance and Repair (M and R) Man Hour Rates. | ||
Installing or Removing Gensets | 30 minutes at the applicable M and R man hour rate plus $ * | |
Fueling Gensets | 12 minutes at the applicable M and R man hour rate | |
Reefer Data Download | $ * per reefer | |
Stringing Gensets | 15 minutes at the applicable M and R man hour rate |
One Gang Barge | $ * | |||
One Gang Vessel | $ * | |||
Two Gang Vessel | $ * | |||
Three Gang Vessel ** | $ * |
One Gang Barge | $ * | |||
One Gang Vessel | $ * | |||
Two Gang Vessel | $ * | |||
Three Gang Vessel ** | $ * |
Second Revised Appendix II | APMT Initials _MO___ |
42
One Gang Barge | $ * | |||
One Gang Vessel | $ * | |||
Two Gang Vessel | $ * | |||
Three Gang Vessel ** | $ * |
** | for 4A, 4B, and 4C the three gang rate will be effective from the first vessel after Amendment No. 3 signed. In addition if gangs are hire for less than 8 hours Horizon Lines will cover labor with 8 hour guarantees. |
5. Overtime Differentials per gang per hour | ||||
A. Overtime | One Gang Barge | $ * | ||
One Gang Vessel | $ * | |||
Two Gangs Vessel | $ * | |||
Three Gang Vessel ** | $ * | |||
B. Double Time | One Gang Barge | $ * | ||
One Gang Vessel | $ * | |||
Two Gangs Vessel | $ * | |||
Three Gang Vessel ** | $ * |
** | for 5A and 5B the three gang rate will be effective from the first vessel after Amendment No. 3 signed. In addition if gangs are hire for less than 8 hours Horizon Lines will cover labor with 8 hour guarantees |
6. Extra Gate Moves (exceeding the * gate moves included per vessel lift). Billing to be done on a calendar month basis. | $ * per move | |||
7. Mounting/Grounding activity not included in base rate | Straight Time $ | * | ||
Overtime $ | * |
** | Subject to minimum labor guarantees |
Second Revised Appendix II | APMT Initials _MO___ |
43
8. Miscellaneous Parts for Roadability cost plus *. This is not applicable to Maersk owned chassis. | ||||||
9. Maintenance Day Shift | ST $ * | OT $ * | DT $ * |
10. Drayage | ||
To or From on Terminal Rail | $ * one way | |
USDA Dray | $ * one way | |
US Customs or others dray within terminal | $ * one way | |
Customs Vacis/Security exams | Per Terminal Tariff |
11. Equipment Rental Rates (when ordered by Carrier; excludes operator) | ||
- Top Loader | $ * per hour | |
- Yard Hustler | $ * per hour | |
- Empty Handler | $ * per hour | |
- Transtainer | $ * per hour | |
- Bombcart | $ * per hour | |
- Container Crane | $ * per hour |
12. | Overtime Gate Charges Extra labor plus equipment per Items 13 and 11 prorated between carriers based on percentage of moves utilizing gate outside standard terminal gate hours. Current standard gate hours are 0700 to 1800 Monday through Friday. Holiday gates which are included in the base lift rate are stated on attached schedule. | |
UMS reserves the right to adjust standard gate hours but not without the mutual consent of Horizon Lines, who can not unreasonably object to such a change without conclusive evidence that UMS agrees support a negative financial impact to Horizon Lines. If the terminal operator chooses to open during the lunch period or operate flex gates, there will be no extra charge to the carrier. Overtime gate charges also apply to ILA holidays. |
13. Extra Labor Rates | Straight Time $ * | Overtime $ * | Double Time $ * |
14. | Line Handling Carrier to arrange directly with vendor. |
15. | Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * gate moves or allowed mounting/grounding and will be billed $ * per container. (Excludes demurrage) |
16. | Terminal storage charges |
Storage of empty containers | $ * per unit per day |
Second Revised Appendix II | APMT Initials _MO___ |
44
17. | Demurrage Terminal Operator will bill, collect, and retain demurrage from carrier per terminal tariff in effect on October 15, 2006. Below is table of rates from terminal tariff. |
Free time for import cargo is * business days for dry containers and * business days for temperature controlled containers.
I) One to Ten (1 10) Days (first period) | ||
Dry General Purpose containers/Non-operating | $ * | |
Reefers | ||
Operating Reefers | $ * | |
Flat Racks, Open Tops, and Special Equipment | $ * | |
Tank Containers | $ * | |
II) Eleventh Day and Above (second period) | ||
Dry General Purpose containers/Non-operating | $ * | |
Reefers | ||
Operating Reefers | $ * | |
Flat Racks, Open Tops, and Special Equipment | $ * | |
Tank Containers | $ * |
18. Lashing/Unlashing of breakbulk cargo on board vessel | Extra labor man hour rates plus | |
materials at cost plus * percent |
Second Revised Appendix II | APMT Initials _MO___ |
45
19. Bundling of Chassis/Flat Racks | $ * per chassis/flat plus materials |
20. | Out of service equipment (containers and chassis) remaining on terminal in excess of * calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container per day. If container is able to be stacked in a normal manner and fits in one container slot then storage (Item 16) only applies. |
21. | Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Items 13 and 11 above). |
22. Fuel Surcharge (as of January 2010) | $ * per lift | |
Fuel Surcharge is based on the Bureau of Labor Statistics Producer Price Index No 2 Diesel Fuel with February 2004 to February 2005 as the basis. This will be reviewed / adjusted once a year if fuel prices fall below the February 2005 level and eliminated if prices fall below the February 2004 level. |
23. Chassis Switching charge | Straight Time Overtime | $ * $ * |
Switching of reefer containers from underslung genset chassis
Chassis switch/flips for hazardous containers on wheels is not billable
** | Subject to minimum labor guarantees |
24. | Reefer Fuel will be charged based on the following formula: |
Second Revised Appendix II | APMT Initials _MO___ |
46

Terminal Services Rates at
APM Terminals Elizabeth, NJ
Effective January 1, 2010 to September 30, 2010
1. A. Discharge or Load Base Rate per marine lift | $ | * | ||
B. Transshipment per move | $ | * | ||
C. Shifting Cell to Cell within the same hatch | $ | * | ||
D. Restowing container Cell to Dock to Cell | $ | * | ||
E. Overheight unit lifted with overheight spreader (no wires) | $ | * | per lift |
A. | If received at gate bundled then we will charge |
a. | If can use standard spreader bar, charge will be one base lift rate for load or discharge |
b. | If requires wires to load/discharge, then will be charged per Extra labor hourly lifting rates plus mounting or grounding charge |
B. | If requested to be bundled/unbundled by Horizon Lines |
a. | If can use standard spreader bar, charge will be the following: |
i. | One base lift rate for load or discharge | ||
ii. | Contract charge for bundling/unbundling | ||
iii. | Mounting or grounding charge for the 2nd to 5th chassis/flat |
b. | If requires wires than charges will be the following: |
i. | Per Extra labor hourly lifting rates | ||
ii. | Contract charge for bundling / unbundling | ||
iii. | Mounting or grounding charge for each chassis or flat |
Second Revised Appendix II | APMT Initials _MO___ |
47
C. | If the contractor locks (or unlocks) and secures empty flat racks pierside and lifts to/from vessel as one unit, the carrier will be charged the base lift rate for each individual flat rack loaded/discharged provided that the contractor follows the stow plan provided by the carrier with relation to the stowage of flatracks. (i.e. If 4 flat racks are locked together shoreside and lifted as one unit to the vessel, the lift charge to the carrier will be 4 x base lift rate) |
2. A. Reefer Differential assessed to each loaded reefer for plug/unplug services, quality check at time of discharge /loading, record keeping, and administrative services. This rate does not include pre-tripping, labor to fuel genset, cleaning, reefer wash, M&R, genset mount/dismount, and fuel. Rate to be charged also for reefers received/delivered with no vessel activity. | $ * per loaded reefer | |||
B. Daily Reefer monitoring and electric charges per calendar day or portion thereof (minimum one day charge) | $ * Daily charge | |||
First Calendar Day to receive a * discount from stated rate. | ||||
3. Maintenance and Repair (M and R) Man Hour Rates |
Straight Time $ * | Overtime $ * | Double Time $ * |
Installing or Removing Gensets | - 30 minutes at the applicable M and R man hour rate plus $ * | |
Fueling Gensets | - 12 minutes at the applicable M and R man hour rate |
4. A. Standby / Guarantee per Gang per hour Straight Time | ||||||
One Gang | $ | * | ||||
Two Gangs | $ | * | ||||
Three Gangs | $ | * | ||||
B. Extra Labor / Heavy Lifts per Gang per hour Straight Time | ||||||
One Gang | $ | * | ||||
Two Gangs | $ | * | ||||
Three Gangs | $ | * | ||||
C. Detentions per Gang per Hour Straight Time | ||||||
(See Appendix 1 Detentions for list of billable and non-billable detentions) | ||||||
One Gang | $ | * | ||||
Two Gangs | $ | * | ||||
Three Gangs | $ | * | ||||
5. Overtime Differentials per gang per hour | ||||||
A. Overtime | One Gang | $ | * | |||
Two Gangs | $ | * | ||||
Three Gangs | $ | * | ||||
B. Double Time | One Gang | $ | * | |||
Two Gangs | $ | * | ||||
Three Gangs | $ | * |
Second Revised Appendix II | APMT Initials _MO___ |
48
6. Overtime Gate Charges Extra labor plus equipment per Items 14 and 12 below prorated between carriers based on percentage of moves utilizing gate outside standard terminal gate hours. Holiday gates which are included in the base lift rate are stated on attached schedule. | ||||
Flat charge of $ * per hour to be charged for gate on Friday past 1700. Current standard gate hours are 0600 to 1700 Monday through Friday. | ||||
UMS reserves the right to adjust standard gate hours but not without the mutual consent of Horizon Lines, who can not unreasonably object to such a change without conclusive evidence that UMS agrees support a negative financial impact to Horizon Lines. Horizon Lines agrees that UMS can change the opening gate hour from 0600 to 0700 without their objection. If the terminal operator chooses to open during the lunch period or operate flex gates, there will be no extra charge to the carrier. Overtime gate charges also apply to ILA holidays. | ||||
Flat charge of $ * per hour to be charged for receiving gate on Friday from 1700. If the terminal causes gate to go past 1700, then no charge will be made from 1700 to 1800. | ||||
7. Extra Gate Moves (exceeding the * gate moves included per vessel lift). Billing to be done on a calendar month basis. | $ * per move | |||
8. Mounting/Grounding | Straight Time $ * | |||
Overtime $ * |
** | Subject to minimum labor guarantees |
Second Revised Appendix II | APMT Initials _MO___ |
49
9. Miscellaneous Parts for Roadability Carrier to handle directly with M and R vendor. This is not applicable to Maersk owned chassis. | ||||
10. Maintenance Carrier to handle directly with M and R vendor. | ||||
11. Rail Drayage to/from Express Port | $ * one way | |||
Port shuttle within Port Elizabeth/Port Newark | $ * one way | |||
12. Equipment Rental Rates (when ordered by Carrier; excludes operator) |
- Top Loader | $ * per hour | |
- Yard Hustler | $ * per hour | |
- Empty Handler | $ * per hour | |
- Transtainer | $ * per hour | |
- Bombcart | $ * per hour | |
- Container Crane | $ * per hour |
13. Wharfage Non-Containerized Cargo | According to Port Authority tariff (current fmc schedule | |
PA-10). See also Item number 25. |
14. Extra Labor Rates | Straight Time $ * | Overtime $ * | Double Time $ * |
15. Stuffing and Stripping Rates | APMT no longer handles CFS Stuffing/Stripping for containers and POVs. | |||||||
Flat Rack cargo per 20 flat | $ | * | ||||||
Flat Rack cargo per 40 flat | $ | * |
CFS rates include drayage to/from on dock warehouse. Rate includes normal chocking and bracing but does not include securing materials for flats or special securing of autos. Subject to on terminal Contractors warehouse being available. | ||||
16. Line Handling per activity (i.e. two charges per call) | ||||
Straight Time | $ | * | ||
Overtime (except from 2300 to 0600) | $ | * | ||
Overtime (2300 to 0600) | $ | * | ||
17. Full containers received over the road and redelivered without loading or discharging to or from vessel are not included in the * gate moves or allowed mounting/grounding and will be billed $ * per container for receipt and redelivery of a container. (Excludes demurrage) | ||||
18. Terminal storage charges |
Storage of empty containers | $ * per unit per day |
Empty allowance will be determined by multiplying the Carriers container lift volume each month times * times the number of days in the month. Excess empty container days over such allowed free days will be charged monthly at the following rate per container per day. (Free Days = Lifts x * x Days in Period) |
Second Revised Appendix II | APMT Initials _MO___ |
50
Notwithstanding the means of calculating Carriers empty allowance stated above, the parties agree when the Contractor notifies the Carrier that empty storage of equipment meets or exceeds the storage cap, Carrier will be required to present the respective terminal with an empty evacuation plan to reduce the number of empties below the cap within a fourteen (14) day period. Daily storage cap is equal to * of the Carriers previous years annual throughput. |
19. Demurrage | Terminal Operator will bill, collect, and retain demurrage from carrier according to the terminal tariff. The only exception is that the Contractor shall grant Carrier * business days free time for autoracks, pallet loads, and dunnage provided that Carrier provides a list of these containers to Contractor 48 hours prior to vessels arrival. |
20. Lashing/Unlashing of break bulk cargo on board vessel | Extra labor man hour rates plus | |
materials at cost plus * percent | ||
21. Customs Vacis/Security exams | Per Terminal Tariff | |
Other drays within terminal premises not | $ * one way | |
associated with throughput cycle. | ||
22. Bundling of Chassis/Flat Racks | $ * per chassis/flat plus materials |
** | Subject to minimum labor guarantees |
23. Out of service equipment (containers and chassis) remaining on terminal in excess of calendar days w/o approval from carrier to proceed with necessary repairs will be assessed a storage charge $ * per container per day. | ||||
If container is able to be stacked in a normal manner and fits in one container slot then storage (Item 18) only applies. | ||||
24. Any services not covered by above rates will be charged per terminal tariff. If not listed in terminal tariff or in above rates then services to be charged on Extra labor basis plus equipment (Item 14 and 12 above). | ||||
25. Terminal Throughput Fee/Wharfage included in the base lift rate except for non containerized cargo which will be charged wharfage per the Port Authority of New York and New Jersey Tariff | ||||
26. Fuel Surcharge (Eliminated as of 4/1/2009) | $ * per lift | |||
Fuel Surcharge is based on the Bureau of Labor Statistics Producer Price Index No 2 Diesel Fuel with February 2004 to February 2005 as the basis. This will be reviewed / adjusted once a year if fuel prices fall below the February 2005 level and eliminated if prices fall below the February 2004 level. |
Second Revised Appendix II | APMT Initials _MO___ |
51
27. Chassis Switching charge | Straight Time | $ | * | |||
Overtime | $ | * | ||||
To/From truckers equipment From/To chassis | ||||||
Switching of reefer containers from underslung genset chassis |
** | Subject to minimum labor guarantees |
28. Reefer Fuel will be charged based on the following formula: | ||||
The total number of running reefers loaded and discharged from vessels and barges for the month times * times * gallons per reefer times the average cost of a gallon of reefer fuel for the month at fuel vendors charge to Contractor plus *. | ||||
Once Horizon has a dedicated genset fleet and upon Horizon providing a minimum 30 days advance notice in writing, fuel will be based on actual fuel placed in gensets. Cost will be based on the average weekly cost as published by government at the following web site (or similar web site if this site no longer exists) http://tonto.eia.doe.gov/oog/info/gdu/gasdiesel.asp |
Second Revised Appendix II | APMT Initials _MO___ |
52