EX-101 INSTANCE DOCUMENT

EX-10.10 3 d795175dex1010.htm EX-10.10 EX-10.10

Exhibit 10.10

 

 

TENTH AMENDMENT

to the

COMPOSITE LEASE AGREEMENT

By and Between

MEMPHIS-SHELBY COUNTY AIRPORT AUTHORITY

and

FEDERAL EXPRESS CORPORATION

Effective as of May 1, 2018

 

 


TENTH AMENDMENT

TO THE COMPOSITE LEASE AGREEMENT

This TENTH Amendment to the Composite Lease Agreement is made and entered into as of the 22 day of May 2018, by and between MEMPHIS-SHELBY COUNTY AIRPORT AUTHORITY (herein referred to as “Authority”), a body politic and corporate, organized and existing under the laws of the State of Tennessee, and FEDERAL EXPRESS CORPORATION (herein referred to as “Tenant”), a corporation duly organized and existing under the laws of the State of Delaware.

WITNESSETH:

WHEREAS Authority and Tenant executed an instrument entitled “Composite Lease Agreement” with an effective date of January 1, 2007, that instrument, as previously amended by First Amendment to the Composite Lease Agreement intended to be effective as of September 1, 2008; by Second Amendment to the Composite Lease Agreement intended to be effective as of June 1, 2009; by Third Amendment to the Composite Lease Agreement intended to be effective as of July 1, 2009; by Fourth Amendment to the Composite Lease Agreement intended to be effective as of December 15, 2011; by Fifth Amendment to the Composite Lease Agreement intended to be effective as of January 1, 2013; by Sixth Amendment to the Composite Lease intended to be effective July 1, 2014; by Seventh Amendment to the Composite Lease intended to be effective April 1, 2016; by Eighth Amendment to the Composite Lease intended to be effective April 1, 2017; and by Ninth Amendment to the Composite Lease intended to be effective September 1, 2017, are collectively referred to herein as the “Composite Lease Agreement”; and

WHEREAS, Authority and Tenant intended the Composite Lease Agreement to represent each of 29 separate lease agreements between the parties (later increased to 32) and showed the differences among the 29 (later 32 leases) by attaching to the Composite Lease Agreement, a schedule that identified each parcel of real property Authority leased to Tenant, the portion of the Term (as defined in the Composite Lease Agreement) during which the lease of each parcel will be in effect, and the rent that Tenant pays to Authority for each parcel, the “Composite Lease Property Rental Schedule”, attached hereto as “EXHIBIT A” and incorporated herein by reference; and

 

2


WHEREAS, the parties wish to amend the Composite Lease Agreement to add 20.320 acres or 885,880 square feet of unimproved ground (also known as the Golden Triangle Ramp area) as Parcel 33 to be used as aircraft parking, effective May 1, 2018.

NOW, THEREFORE, for and in consideration of the promises, covenants and agreements hereinafter contained to be kept and performed by the parties hereto and upon the provisions and conditions hereinafter set forth, Authority and Tenant do hereby covenant and agree as follows:

SECTION 1. Definitions. Except as otherwise provided herein, and unless the context shall clearly require otherwise, all words and terms used in this TENTH Amendment that are defined in the Composite Lease Agreement, the Special Facility Ground Lease Agreement and the Special Facility Lease Agreement shall have the respective meanings given to them in each agreement for all purposes of this TENTH Amendment.

SECTION 2. Modification of Composite Lease and Applicable Rent. The parties amend the Composite Lease Agreement to reflect the addition of Parcel 33 as described in the attached survey and legal description and shown on “Legal Description”, “EXHIBIT B”, attached hereto and incorporated herein by reference. As of the Effective Date, the parties incorporate this Tenth Amendment EXHIBIT B to the Composite Lease Agreement, and the parties substitute the schedule attached to this Amendment for the schedule included as part of EXHIBIT A to the Composite Lease Agreement. The substitution of that schedule will accomplish the following:

(a) Effective on the Parcel 33 “Substantial Completion Date” (as defined in Section 4 below), the annual Composite Lease rent will be increased by an amount equal to the product achieved by multiplying the area of Parcel 33 as follows:

 

     Unimproved                       

Location

   Sq. Ft      Ground Rate      Annual      Monthly  

Golden Triangle Ramp Area

     698,965      $ 0.2077      $ 145,175.03      $ 12,097.92  

(b) The rent, as adjusted in accordance with the foregoing, will continue to be subject to adjustment in accordance with the terms of Section 2.03(a)(i) of the Composite Lease Agreement.

(c) The Golden Triangle Ramp Area contains 885,880 square feet, and Tenant’s leased area shall contain the entire 885,880 square feet.

 

3


(d) In consideration of the cost of the improvements and construction by Tenant of the Taxiway Area (“Taxiway Area”), consisting of 186,915 square feet of the total 885,880 square feet shown in “Exhibit D”, attached hereto and incorporated herein by reference, Tenant shall pay no rent for the Taxiway Area until the expiration of the Composite Lease Agreement First Term, ending at midnight December 31, 2036.

(e) Should the parties agree to a Composite Lease Agreement Renewal Term, beginning January 1, 2037, Authority will initiate billing Tenant for the Taxiway Area at the then-applicable square-foot adjustment rate.

SECTION 3. Improvements by Tenant

(a) Effective May 1, 2018, Authority shall permit Tenant to have all necessary or appropriate rights of reasonable access, ingress and egress to and from Parcel 33 for Tenant and its servants, agents, employees and independent contractors to work on or in connection with Tenant’s alterations of the improvements located on Parcel 33 and make it suitable for aircraft parking use (“Tenant’s Work”), as well as do all such other things as may be incidental to Tenant’s Work.

(b) Tenant shall obtain, at Tenant’s sole expense, all certificates, permits and approvals relating to Tenant’s Work.

(c) Tenant’s Work on Parcel 33 shall be permitted to make all Leasehold improvements to Parcel 33 as specifically set forth in “EXHIBIT C” (“Leasehold Improvements”), as attached hereto and incorporated herein by reference, at no cost to Authority.

(d) As part of Tenant’s Work, Tenant shall remain in compliance with all applicable Environmental Laws and the requirements of Article VIII of the Composite Lease.

(e) Tenant’s Work shall include the relocation of an existing sanitary sewer line as shown in EXHIBIT C, and upon the conclusion of the relocation of the sanitary sewer line, the sewer line will remain the City of Memphis public sewer, as identified in the “Overall Sanitary Sewer Plan” in “Exhibit E”, attached hereto and incorporated herein by reference.

 

4


(f) After completion of Tenant’s Work, Tenant shall continue to have maintenance responsibilities of all property, other than the Sanitary Sewer Line shown in Exhibit E, under this Agreement.

SECTION 4. Substantial Completion Date.

(a) Authority and Tenant agree that the Substantial Completion Date shall be defined as that date on which Tenant has commenced beneficial use of Parcel 33.

(b) Tenant’s Work and related activity during the period before the Substantial Completion Date shall not be considered the commencement of beneficial use of the premises by Tenant. However, the terms and conditions of the Composite Lease, including, without limitation, the commercial liability insurance provisions shall apply to and be effective during such period of occupancy or access to the premises by Tenant, except for Tenant’s obligation to pay rent as provided in Section 2.03 in the Composite Lease Agreement.

(c) Tenant’s obligation to pay rent for Parcel 33 will commence on the Tenant’s date of beneficial occupancy.

SECTION 5. Remainder of Composite Lease in Effect. All other terms, provisions, conditions, covenants and agreements of the Composite Lease shall continue in full force and effect.

SECTION 6. Effective Date of this Tenth Amendment. This TENTH Amendment shall become effective as of May 1, 2018.

The remainder of this page intentionally left blank.

Signature page to follow.

 

5


IN WITNESS WHEREOF, the parties have caused their duly authorized representatives to execute this ELEVENTH Amendment to the Composite Lease Agreement.

 

MEMPHIS-SHELBY COUNTY      
AIRPORT AUTHORITY     FEDERAL EXPRESS CORPORATION
By:  

/s/ Scott A. Brockman

    By:  

/s/ Donald C. Colvin

Scott A. Brockman, A.A.E. President

      Donald C. Colvin

and Chief Executive Officer

    Title:  

Vice President—Properties & Facilities

      Date:  

May 4, 2018

Approved as to Content:      
By:  

/s/ Forrest B. Artz

     
Forrest B. Artz      
Vice President of Finance and Administration/CFO      
Approved as to Form and Legality:      

/s/ Janet L. Shipman

     
Janet L. Shipman, Associate Airport Counsel      
Reviewed and Approved:      

/s/ Angela Washington

     
Director of Properties      

 

6


EXHIBIT A     
FEDERAL EXPRESS CORPORATION      EXHIBIT A
2003 CORPORATE AVENUE-B3     
MEMPHIS, TN 38132                   Current Monthly Billing   

PARCEL

NUMBER

 

FEDEX
LEASE

NUMBER

  CURRENT
SUPPLEMENTAL
  USE OR
LOCATION
  PARCEL
ID
  EFFECTIVE
DATE
  SQUARE
FEET
  CURRENT
RATE
      CURRENT
ANNUAL
BILLING
 

PROJECTED RATES

 

EFFECTIVE JULY 2012

 

7/1/2008

ESCALATION

          EFFECTIVE
JAN 2013
PENDING
  EFFECTIVE
JULY 2013
CPI 8.97%
  11/1/2013   7/1/2014   7/1/15-17       7/1/2017   7/1/2018  9
ESCALATION
                       RATES   MONTHLY        ANNUAL                               

1

      N/A   TAXIWAY N   N/A   1/1/2009 1   100,035   $0.19   $1,588.89   $19,066.67   $0.1906   $1,588.89       $19,066.67   N/A           $1,588.89   $1,731.41   $1,731.41   $1,731.41       $0.21   $1,731.41   CPI OR 13%

2

  98-0824   SUPPLEMENTAL 26/ Add Tract 1   AMR FACILITIES/LANDLOCKED PARCELS/CANCELLED   A -G   1/1/2007   1,082,446   Varies 3   $28,533.40   $342,400.80   $0.3935   $28,533.40       $410,104.92   15% 3   1,126,790   $0.3935   $36,949.32   $31,092.85   $31,860.37   $31,860.37       $0.21   $31,860.37   CPI OR 13%
        SUPPLEMENTALS   WEST RAMP                                                                                    

3

  80-0204   18, 19, 20, 21, 22 & 23   UNIMPROVED GROUND   N/A   1/1/2007   3,111,647   $0.1525   $39,543.85   $474,526.17   $0.1906   $49,423.33       $593,079.92   N/A           $49,423.33   $53,856.60   $53,856.60   $53,856.60       $0.21   $53,856.60   CPI OR 13%
  80-0204   22, 24 & 25/Add Tract 2   UNIMPROVED GROUND   N/A   1/1/2007   914,283   $0.1525   $11,619.01   $139,428.16   $0.1906   $14,521.86       $174,262.34   N/A   917,027   $0.1906   $14,565.45   $15,824.47   $15,871.96   $15,871.96       $0.21   $15,871.96   CPI OR 13%

4

      N/A   TAXIWAY C   N/A   1/1/2009 2   731,098   $0.2400   $14,621.96   $175,463.52   $0.2400   $14,621.96       $175,463.52   N/A           $14,621.96   $15,933.55   $15,933.55   $15,933.55       $0.26   $15,933.55   CPI OR 13%

5

  80-0204   SUPPLEMENTAL 13   UNIMPROVED APRON/GRACELAND RAMP   33   1/1/2007   515,496   $0.1525   $6,551.10   $78,613.14   $0.1906   $8,187.79       $78,613.14   N/A           $8,187.79   $8,922.24   $8,922.24   $8,922.24       $0.21   $8,922.24   CPI OR 13%
  80-0204   SUPPLEMENTAL 17   UNIMPROVED APRON/SIERRA RAMP   37   1/1/2007       $0.1525                           N/A                                       CPI OR 13%

6

  92-0833   AGREEMENT #92-0833   IRS/AOD   N/A   1/1/2007   2,248,286   $0.6650   $125,000.00   $1,500,000.00   $0.6672   $125,000.00       $1,500,000.00   N/A           $125,000.00   $143,750.00   $143,750.00   $143,750.00       $0.6672   $143,750.00   CPI 0R 13%

7

  90-0242   SOUTHWIDE #90-0242   GRAEBER ASSIGNMENT   23   1/1/2007   427,030   $0.1029   $2,506.15   $30,073.80   $0.1029   $2,506.15   $257.88   $43,941.39   25% 5           $3,661.78   $2,730.95   $2,730.95   $2,730.95       $0.1029   $2,730.95   CPI OR 13%

8

  80-0223   SOUTHWIDE ASGMT. #80-0223   EQUITABLE LIFE   24   1/1/2007   451,370   $0.0644   $2,340.16   $28,081.92   $0.0644   $2,340.16       $29,068.23   25% 5           $2,422.35   $2,550.07   $2,550.07   $2,550.07       $0.0644   $2,550.07   CPI OR 13%

9

  80-0204   SUPPLEMENTAL 15 (INTERNATIONAL PARK)   FEDEX PARKING - TCHULAHOMA   21   1/1/2007   833,458   $0.2673   $18,565.28   $222,783.36   $0.2673   $18,565.28       $222,783.32   N/A           $18,565.28   $20,230.58   $20,230.58   $20,230.58       $0.29   $20,230.58   CPI OR 13%

10

  80-0204   SUPPLEMENTAL 16 (INTERNATIONAL PARK)   FEDEX CONSTRUCTION STORAGE AREA   22A   1/1/2007   140,617   $0.2673   $3,132.24   $37,586.92   $0.2673   $3,132.24       $37,586.92   N/A           $3,132.24   $3,413.21   $3,413.21   $3,413.21       $0.29   $3,413.21   CPI OR 13%

11

  80-0204   SUPPLEMENTAL 13   UNIMPROVED GROUND/GSE STORAGE   36   1/1/2007   187,217   $0.1525   $2,379.22   $28,550.59   $0.1906   $2,973.63       $35,683.56   N/A           $2,973.63   $3,240.36   $3,240.36   $3,240.36       $0.21   $3,240.36   CPI OR 13%

12

  80-0204   SUPPLEMENTAL 27   A-380 GSE STORAGE   N/A   DBO/
12/1/07 4
  187,618   N/A   $0.00   $0.00   $0.1525   $2,384.31       $28,611.75   N/A           $2,384.31   $2,598.18   $2,598.18   $2,598.18       $0.17   $2,598.18   CPI OR 13%

13

  80-0204   SUPPLEMENTAL 23   A-380 RAMP   N/A   1/1/2007   1,897,879   $0.1220   $19,295.10   $231,541.24   $0.1220   $19,295.10       $231,541.24   N/A           $19,295.10   $21,025.87   $21,025.87   $21,025.87       $0.13   $21,025.87   CPI OR 13%
    SUPPLEMENTAL 25   A-380 GSE RAMP   N/A   1/1/2007   319,113   $0.1525   $4,055.39   $48,664.73   $0.1906   $5,068.58       $60,822.94   N/A           $5,068.58   $5,523.23   $5,523.23   $5,523.23       $0.21   $5,523.23   CPI OR 13%

14

  80-0204   SUPPLEMENTAL 14   UNIMPROVED APRON/DE-ICING EQUIPMENT STORAGE   34   1/1/2007   428,616   $0.1525   $5,447.00   $65,363.94   $0.1906   $6,807.85       $81,694.21   N/A           $6,807.85   $7,418.52   $7,418.52   $7,418.52       $0.21   $7,418.52   CPI OR 13%

15

  07-0972   **N/A   SPRANKLE ROAD   N/A   1/1/2007   200,695   $0.0000   $0.00   $0.00   N/A   N/A   N/A   N/A   N/A           N/A                           N/A

16

      **N/A   REPUBLIC ROAD   N/A   1/1/2007   113,179   $0.0000   $0.00   $0.00   N/A   N/A   N/A   N/A   N/A           N/A                           N/A

 

 

17

      SUPPLEMENTALS       0                                                                                
  80-0204   1    Parcel 1, 2, 3, 4, 6 & 9  (UNIMP GROUND)       1,2,3,4,6,9   1/1/2007   1,662,877   $0.1525   $21,132.40   $253,588.74   $0.1906   $26,412.03       $316,944.36   N/A           $26,412.03   $28,781.19   $28,781.19   $28,781.19       $0.21   $28,781.19   CPI OR 13%
  80-0204   1    Parcel 1, 2, 7, 9   (IMP APRON)       1,2,7,9   1/1/2007   1,908,290   $0.1906   $30,310.01   $363,720.07   $0.2383   $37,895.46       $454,745.51   N/A           $37,895.46   $41,294.68   $41,294.68   $41,294.68       $0.26   $41,294.68   CPI OR 13%
  80-0204   Parcel 5  (INTERNATIONAL PARK)       5   1/1/2007   24,000   $0.2673   $534.60   $6,415.20   $0.3341   $668.25       $8,019.00   25% 5           $668.25   $728.19   $728.19   $728.19       $0.36   $728.19   CPI OR 13%
  80-0204   1    Parcel 8  (INTERNATIONAL PARK)   FUEL TANKS   8   1/1/2007   247,254   $0.2673   $5,507.58   $66,090.99   $0.3341   $6,884.48       $82,613.74   25% 5           $6,884.48   $7,502.02   $7,502.02   $7,502.02       $0.36   $7,502.02   CPI OR 13%
  80-0204   1 & 8    Parcel 12   (INETRNATIONAL PARK)   ARTC TRAINING BUILDING   12   1/1/2007   117,915   $0.2673   $2,626.56   $31,518.68   $0.3341   $3,283.20       $39,398.35   25% 5           $3,283.20   $3,577.70   $3,577.70   $3,577.70       $0.36   $3,577.70   CPI OR 13%
  80-0204   1 & 8  Parcel 11   (INTERNATIONAL PARK)   GAS STATION   11   1/1/2007   45,359   $0.2673   $1,010.37   $12,124.46   $0.3341   $1,262.96       $15,155.58   25% 5           $1,262.96   $1,376.25   $1,376.25   $1,376.25       $0.36   $1,376.25   CPI OR 13%
  80-0204   8  Parcel 9   (INTERNATIONAL PARK)   SOUTH RAMP, COURTYARD, SOUTHGATES   9, 10, 17   1/1/2007   1,586,172   $0.2673   $35,331.98   $423,983.78   $0.3341   $44,164.98       $529,979.72   25% 5           $44,164.98   $48,126.58   $48,126.58   $48,126.58       $0.36   $48,126.58   CPI OR 13%
  80-0204   Parcel 10   (INTERNATIONAL PARK)   SOUTHEASTERN RAMP, NORTH SECONDARY,       1/1/2007   70,200   $0.2673   $1,563.71   $18,764.46   $0.3341   $1,954.63       $23,455.58   25% 5           $1,954.63   $2,129.96   $2,129.96   $2,129.96       $0.36   $2,129.96   CPI OR 13%
  80-0204   Parcel 17   (INTERNATIONAL PARK)   NORTH INPUT, PRIMARY SORT,   17   1/1/2007   4,333,659   $0.2673   $96,532.25   $1,158,387.00   $0.3341   $120,665.32       $1,447,983.84   25% 5           $120,665.32   $131,489.00   $131,489.00   $131,489.00       $0.36   $131,489.00   CPI OR 13%
          SMALL PACKAGE SORT SYSTEM,                                                                                    
          INTERNATIONAL INPUT, HEAVY WEIGHT, EAST RAMP                                                                                    
  80-0204       TAB-LINE MAINTENANCE   14   1/1/2007   556,334   $0.2673   $12,392.34   $148,708.08   $0.3341   $15,490.42       $185,871.19   25% 5           $15,489.27   $16,879.91   $16,879.91   $16,879.91       $0.30   $16,879.91   CPI OR 13%
  80-0204   10    Parcel 27A  (IMP APRON)   PARCEL 27A   27   1/1/2007   487,512   $0.1906   $7,743.32   $92,919.79   $0.2383   $9,681.18       $116,174.11   N/A           $9,681.18   $10,549.58   $10,549.58   $10,549.58       $0.26   $10,549.58   CPI OR 13%
  80-0204   11    Parcel A & B West   (UNIMP GROUND)   NORTH RAMP   27A &
27B
  1/1/2007   527,676   $0.1525   $6,705.88   $80,470.59   $0.1906   $8,381.25       $100,575.05   N/A           $8,381.25   $9,133.05   $9,133.05   $9,133.05       $0.21   $9,133.05   CPI OR 13%
  80-0204   5    Parcel 16   (INTERNATIONAL PARK)       16   1/1/2007   796,312   $0.2673   $17,737.85   $212,854.20   $0.3341   $22,172.31       $266,067.75   25% 5           $22,172.31   $24,161.17   $24,161.17   $24,161.17       $0.36   $24,161.17   CPI OR 13%
  80-0204   23   GRAEBER ASSIGNMENT/TRUCKING OPERATION       1/1/2007   261,460   $0.1029   $2,242.02   $26,904.25   $0.1286   $2,802.53       $33,630.32   25% 5           $2,802.53   $3,053.91   $3,053.91   $3,053.91       $0.14   $3,053.91   CPI OR 13%
  80-0204   SUPPLEMENTAL 9   (INTERNATIONAL PARK)   PARKING AREA   25   1/1/2007   18,933   $0.2673   $421.73   $5,060.79   $0.3341   $527.17       $6,325.99   25% 5           $527.17   $574.45   $574.45   $574.45       $0.36   $574.45   CPI OR 13%

18

  80-0204   SUPPLEMENTAL 8   (INTERNATIONAL PARK)   DC-10 HANGAR (LAND)   15   1/1/2007   552,730   $0.2673   $12,312.06   $147,744.73   $0.2673   $12,312.06       $147,744.73   N/A           $12,312.06   $13,416.45   $13,416.45   $13,416.45       $0.29   $13,416.45   CPI OR 13%

18A

      THE BUILDING HAVING AN AREA OF 72,378 SQ FT & OTHER IMPROVEMENTS   DC-10 HANGAR (BUILDING)       9/1/2012 6   72,378   $1.2600   $7,599.69   $91,196.28   $1.2600   $7,599.69       $91,196.28   N/A           $7,599.69   $8,281.38   $8,281.38   $8,281.38       $1.37   $8,281.38   CPI OR 13%
        CONSTRUCTED ON PARCEL 18                                                                                        

19

  80-0204   SUPPLEMENTAL 8   (INTERNATIONAL PARK)   ENGINE SHOP   13 & 18   1/1/2007   418,016   $0.2673   $9,311.31   $111,735.68   $0.2673   $9,311.31       $111,735.68   N/A           $9,311.31   $10,146.53   $10,146.53   $10,146.53       $0.29   $10,146.53   CPI OR 13%

20

  80-0204   SUPPLEMENTAL 27   WEST SIDE OF TANG   N/A   DBO/
3/1/08 7
  108,051   N/A   $0.00   $0.00   $0.1525   $1,373.15       $16,477.78   N/A           $1,373.15   $1,496.32   $1,496.32   $1,496.32       $0.17   $1,496.32   CPI OR 13%

21

  80-0204   SUPPLEMENTAL 7   DEMOCRAT VEHICLE PARKING   19   1/1/2007   1,812,363   $0.1525   $23,032.10   $276,385.20   $0.19060   $28,786.37       $345,436.39   N/A           $28,786.37   $31,368.50   $31,368.50   $31,368.50       $0.21   $31,368.50   CPI OR 13%

22

  80-0204   SUPPLEMENTAL 9   DEMOCRAT VEHICLE PARKING   20   1/1/2007   491,127   $0.1525   $6,241.41   $74,896.87   $0.19060   $7,800.73       $93,608.81   N/A           $7,800.73   $8,500.46   $8,500.46   $8,500.46       $0.21   $8,500.46   CPI OR 13%

23

      N/A   TAXIWAY SIERRA       1/1/2009 2   248,711   $0.2400   $4,974.22   $59,690.64   $0.2400   $4,974.22       $59,690.64   N/A           $4,974.22   $5,420.41   $5,420.41   $5,420.41       $0.26   $5,420.41   CPI OR 13%

24

          SORT FACILITY       9/1/2009 8   292,000   $1.2600   $30,660.00   $367,920.00   $1.2600   $30,660.00       N/A   N/A           $30,660.00   $33,410.20   $33,410.20   $33,410.20       $1.37   $33,410.20   CPI OR 13%

25

  07-0983       Democrate Parking Area           36,128   $0.1906   $573.83   $6,886.00   $0.1906   $573.83                       $573.83   $625.31   $625.31   $625.31       $0.21   $625.31    

26

  07-0985   N/A   CORPORATE AVIATION HANGAR (BUILDING)       7/1/2014   35,070   $1.4238                                                   $4,161.06       $1.42   $4,161.06    
            CORPORATE AVIATION HANGAR (LAND)       7/1/2014   161,334   $0.0000                                                   N/A       N/A   N/A    

27

  07-0984   N/A   HANGAR 11 (BUILDING)       7/1/2014   58,265   $1.4238                                                   $6,913.14       $1.42   $6,913.14    
        N/A   HANGAR 12 (BUILDING)       7/1/2014   117,306   $1.4238                                                   $13,918.36       $1.42   $13,918.36    
            HANGARS 11 AND 12 (LAND)       7/1/2014   1,290,083   $0.0000                                                   N/A       N/A   N/A    

28

  07-0986   N/A   EAST GSE RAMP       7/1/2014 (10)   1,000,681   $0.1741                                                   $14,518.21       $0.17   $14,518.21    

29

          COLD CHAIN STORAGE PARKING       4/1/2016 (11)   29,174   $0.2077               $0.00       $0.00   N/A                           $504.95       $504.95    

30

  07-0987   07-0987   3505 TCHULAHOMA ROAD BUILDING       4/1/2017 (12)   38,345   $2.8500                                                               $9,106.94    
            3505 TCHULAHOMA ROAD (IMPROVED GROUND)       4/1/2017 (12)   58,810   $0.2597                                                               $1,272.75    
            3505 TCHULAHOMA ROAD (UNIMPROVED)       4/1/2017 (12)   64,702   $0.2077                                                               $1,119.88    

31

          3318 WINCHESTER ROAD (BUILDING)       8/1/2017 (13)   113,461   $2.8500                                                               $26,946.99    
            3318 WINCHESTER ROAD (IMPROVED GROUND)       8/1/2017 (13)   196,782   $0.2597                                                               $4,258.69    
            3318 WINCHESTER ROAD (UNIMPROVED GROUND)       8/1/2017 (13)   164,498   $0.2077                                                               $2,847.19    

32

  07-0989       2860 SOUTHWIND DRIVE (UNIMPROVED GROUND)       9/1/2017   72,172   $0.2077                                                               $1,249.18    

33

      N/A   FEDEX GOLDEN TRIANGLE RAMP       5/1/2018   698,965   $0.2077                                                               $12,097.92    
                        30,459,161       $621,102.12   $7,453,225.44       $710,588.05       $8,215,154.42               $719,046.41   $781,865.30   $782,680.31   $822,191.08   $822,696.03       $881,595.56    

 

Note 1: The Effective Date will be the date on which the term of the Lease Agreement in effect between the Authority and Tenant with respect to the premises currently occupied by the “Tennessee Air National Guard” and dated             , 200    , begins. January 1, 2009 is merely an estimate of when that lease term will commence.
   When the Effective Date occurs, the parties will calculate rent for Parcel 1 based upon a rental rate of $0.1906 per square foot of land area.

 

Note 2: The Effective Date will be the date on which the term of the Lease Agreement in effect between the Authority and Tenant with respect to the premises currently occupied by the “Tennessee Air National Guard” and dated             , 200    , begins. January 1, 2009 is merely an estimate of when that lease term will commence.
  When the effective Date occurs, the parties will calculate rent for Parcels 4 and 23 based upon a rental rate of $0.2400 per square foot of land area.

 

Note 3: As of the Effective Date, the monthly and annual rent amounts for Parcel 2 are $             and $             respectively. As of July 1, 2008, the parties will adjust those amounts to equal the product achieved by multiplying each of those amounts by 1.15.

 

Note 4: The Effective Date is the earlier of the date of beneficial occupancy or December 1, 2007. When the Effective Date occurs, the parties will calculate the rent based upon a rental rate of $0.1525 per square foot of land area.

 

Note 5: The rental rate that becomes effective July 1, 2008, reflects a 25-percent increase in the rental rate in effect prior to that date.

 

Note 6: The Effective Date is subject to the operation and effect of Section1.04(b) of the foregoing Lease Agreement. When the Effective Date occurs, the parties will calculate rent for Parcel based upon a rental rate of $1.53 per square foot of building footprint area.

 

Note 7: The Effective Date is the earlier of the date of beneficial occupancy or March 1, 2008. When the Effective Date occurs, the parties will calculate the rent based upon a rental rate of $0.1525 per square foot of land area.

 

Note 8: The Effective date is subject to the operation and effect of Section 1.04(b) of the foregoing Lease Agreement. When the Effective Date occurs, the parties will calculate rent for Parcel based upon a rental rate of $1.53 per square foot of building footprint area.
  That rent is inclusive of rent for the building space comprising Parcel 24 and the land underlying that space.

 

Note 9: When the Effective Date for Parcel 24 occurs, the parties will reduce this area to 4,041,659 solely for the purpose of calculating the rent payable with respect to this portion of Parcel 17. The rent specified for the building spacer comprising Parcel 24 is inclusive of the rent for the land underlying that building space.

 

Note 10: Re: parcel 33 - As of the effective date rent will be charge for 885,880 square feet FedeEx Golden Triangle. The 186,915 sqare feet taxiway within the Golden Triangle will be omitted from rent. Rent will be charged for 698,965 square feet (excluding taxiway) at the rate of $.2077 per square foot.

G:\AR\Leases\FedEx Lease info\FedEx Percent Increase FY2019 Lease Form with Golden Triangle

 

7


Exhibit B

Legal Description

FEDEX GOLDEN TRIANGLE RAMP

LEASE PARCEL

Property Description

Being a 20.320 acre parcel of land contained entirely within the Memphis-Shelby County Airport Authority (MSCAA) property located in the City of Memphis, Shelby County, State of Tennessee. Said parcel is located on the west ramp, west of Taxiway November, north of Taxiway Victor and is bounded on the north and east by Federal Express Corporation Parcels 1 & 3 and being more particularly described by metes and bounds as follows:

Commencing at the centerline intersection of Taxiway November and Taxilane 800; thence along the existing centerline of Taxiway November South 04° 16’ 57” West, 81.06 feet to the north line of Federal Express Corporation Parcel 1, said point also being a south line of Federal Express Corporation Parcel 3; thence along said north line North 85° 44’ 10” West, 50.08 feet to the northwest corner of said Parcel 1, said point being the POINT OF BEGINNING; thence South 04° 16’ 22” West along the west line of said Parcel, 864.80 feet to a point; thence, continuing along the west line of said Parcel 1, South 04° 13’ 46” East, 111.10 feet to a point; thence South 03° 15’ 06” East, 402.85 feet to a point; thence South 88° 22’ 38” West, 40.74 feet to a point; thence North 02° 30’ 36” West, 19.44 feet to a point; thence North 16° 24’ 41” West, 86.25 feet to a point; thence North 70° 56’ 03” West, 112.51 feet to a point; thence North 83° 35’ 54” West, 305.68 feet to a point; thence North 85° 43’ 22” West, 517.59 feet to a point of curvature; thence along a curve to the right, having a radius of 127.31 feet, an arc length of 141.74 feet (chord = North 01° 27’ 34” East, 134.53 feet) to a point; thence South 85° 44’ 10” East, 0.50 feet to a point; thence North 30° 07’ 38” East, 312.89 feet to a point; thence North 37° 41’ 42” East, 82.46 feet to a point; thence North 39° 50’ 06” East, 214.62 feet to a point; thence North 31° 53’ 01” East, 451.96 feet to a point; thence North 30° 55’ 58” East, 143.17 feet to a point; thence North 33° 08’ 42” East, 99.45 feet to a point; thence South 85° 43’ 22” East, 188.43 feet to a point; thence North 04° 16’ 07” East, 188.06 feet to a point in a south line of Federal Express Corporation Parcel 3; thence, along said south line South 85° 45’ 10” East, 107.74 feet to a point; thence South 02° 37’ 19” West, 225.15 feet to a point; thence South 85° 44’ 10” East, 11.95 feet to the POINT OF BEGINNING and containing 20.320 acres.

 

8


Exhibit B

Leased Premises/Unimproved Ground

 

 

9


EXHIBIT C

LEASEHOLD IMPROVEMENTS

 

INDEX

NO.

  

DESCRIPTION

1    REMOVAL OF STRUCTURES & OBSTRUCTIONS
2    RELOCATION OF EXISTING GUARD BOOTH, INCLUDING UTILITY CONNECTIONS
3    DISCONNECT AND PROTECT EXISTING LIGHT POLE CIRCUIT FOR CONNECTION TO NEW CIRCUIT
4    DISCONNECT AND REMOVE EXISTING LIGHT POLES AND ELECTRICAL BOX
5    EXISTING LED LIGHTING FIXTURE, REMOVED FROM EXISTING POLE AND REINSTALLED ON NEW 40’ POLE
6    DISCONNECT AND REMOVE EXISTING UNDERGROUND ELECTRICAL CONDUIT AND POWER WIRING
7    ASPHALT PAVEMENT EXCAVATION
8    GRAVEL PAVEMENT EXCAVATION
9    PAVEMENT MILLING
10    ASPHALT PAVEMENT RUBBILIZATION
11    TEMPORARY CONSTRUCTION ENTRANCE
12    RELOCATE TEMPORARY CHAIN LINK FENCE (6’ W/ BARBED WIRE)
13    TEMPORARY CHAIN LINK FENCE (6’ W/ BARBED WIRE)
14    RAISE EX. #11 INLET
15    FILL ABANDONED 8” MAIN W/ GROUT
16    FILL ABANDONED 10” MAIN W/ GROUT
17    ABANDON EX. SEWER MANHOLE

 

10


18    FUEL PIPING 6” DIAMETER
19    FUEL PIPING 14” DIAMETER
20    HYDRANT FUEL PIT ASSEMBLY WITH BUTTERFLY VALVE AND HYDRANT VALVE
21    FUEL SYSTEM LOW POINT DRAIN ASSEMBLY
22    FUEL SYSTEM HIGH POINT VENT ASSEMBLY
23    FUEL SYSTEM FLUSHING PIT ASSEMBLY
24    FUEL SYSTEM PNEUMATIC TESTING
25    FUEL SYSTEM HYDROSTATIC TESTING
26    FLUSHING OF 14-INCH JF HYDRANT PIPING (INCLUDING 7 HYDRANT LATERALS)
27    TRANSPORT OF FUEL FROM FLUSHING OPERATIONS BACK TO BUCKEYE FUEL STORAGE FACILITY
28    ALLOWANCE FOR FUEL RECLAIM CHARGE PAID TO BUCKEYE FUEL STORAGE FACILITY (320,000 GAL x $0.184/GAL)
29    FLUSHING EVENTS REQUIRED BEYOND THE SPECIFIED FLUSH (32,000 GALS/FLUSH)
30    TRANSPORT OF FUEL FROM FLUSHING OPERATIONS BACK TO BUCKEYE FUEL STORAGE FACILITY (32,000 GALS/EACH
31    ALLOWANCE FOR FUEL RECLAIM CHARGE PAID TO BUCKEYE FUEL STORAGE FACILITY (32,000 GAL x $0.184/GAL)
32    CATHODIC PROTECTION SYSTEM
33    1” UNDERGROUND COMPRESSED AIR PIPE, COATED STEEL
34    1-1/2” UNDERGROUND COMPRESSED AIR PIPE, COATED STEEL
35    COMPRESSED AIR LOW POINT DRAIN ASSEMBLY
36    400 Hz. FREQUENCY CONVERTOR RECEPTACLES
37    PROVIDE AND INSTALL NEW LARGE EQUIPMENT RACK FOR ELECTRICAL PANELS AND 400HZ RECEPTACLE AT POLE

 

11


38    PROVIDE AND INSTALL NEW SMALL EQUIPMENT RACK FOR 400HZ RECEPTACLE AT POLE
39    NEW FUEL SHUTDOWN AND SLUICE GATE PANELS, INCLUDING CONDUIT, CONDUCTORS, AND BEACON AT POLE
40    NEW FUEL SHUTDOWN AND SLUICE GATE CONTROL PANEL WITH ETHERNET FIBER AND AB I/O IN NEW RAMP SUPPORT BUILDING
41    SLUICE GATE PANEL WITH FIBER INPUT AT SLUICE GATE
42    MODIFY EXISTING PLC23 TO ACCOMMODATE THE NEW SPILL CONTROL AND FUEL SHUTDOWN GATES. INCLUDE NEW BYPASS FOR GT GATES WITH BYPASS RELAY. COORDINATE WITH WESPAC COMMUNICATION OF E-STOP.
43    JOHNSON CONTROLS MODIFICATIONS
44    EMERGENCY FUEL SHUTDOWN PLC PROGRAMMING (WESPAC)
45    MODIFY PLC-5 PANEL FOR ETHERNET COMMUNICATION TO EXISTING PLC23 AND FIBER COMMUNICATION FROM NEW RAMP SUPPORT BUILDING
46    NEW FUEL SHUTDOWN PANEL WITH SPECIAL CONFIGURATION WITH DEVICE TERMINALS AND FUSING
47    2/C #12 PLUS #12 GROUND, XHHW-2, 600V COPPER, XLP CABLE
48    2/C #10 PLUS #10 GROUND, XHHW-2, 600V COPPER, XLP CABLE
49    2/C #8 PLUS #8 GROUND, XHHW-2, 600V COPPER, XLP CABLE
50    2/C #6 PLUS #6 GROUND, XHHW-2, 600V COPPER, XLP CABLE
51    3/C #8 PLUS #8 GROUND, XHHW-2, 600V COPPER, XLP CABLE
52    3/C #1/0 PLUS #4 GROUND, XHHW-2, 600V COPPER, XLP CABLE
53    3/C #2/0 PLUS #4 GROUND, XHHW-2, 600V COPPER, XLP CABLE
54    4/C #6 PLUS #10 GROUND, XHHW-2, 600V COPPER, XLP CABLE
55    #3/0 XHHW-2, 600V COPPER GROUND
56    600 KCMIL XHHW-2, 600V COPPER

 

12


57    EXOTHERMIC WELDS
58    STANDARD GROUND ROD
59    #6 AWG BARE COPPER GROUNDING COUNTERPOISE
60    AIRCRAFT STATIC GROUNDING RECEPTACLE
61    2” NON-METALIC CONDUIT, INSTALLED IN TRENCH, INCLUDING TRENCH IN GRASS
62    4” NON-METALIC CONDUIT, INSTALLED IN TRENCH, INCLUDING TRENCH IN GRASS
63    NON-METALIC CONDUIT, CONCRETE ENCASE 2”
64    NON-METALIC CONDUIT, CONCRETE ENCASE 2-2”
65    NON-METALIC CONDUIT, CONCRETE ENCASE 4”
66    NON-METALIC CONDUIT, CONCRETE ENCASE 2-4” PRIMARY POWER
67    NON-METALIC CONDUIT, CONCRETE ENCASE 1”
68    NON-METALIC CONDUIT, CONCRETE ENCASE 1-1” & 3-4” (GENERATOR POWER AND CONTROLS)
69    MAXCELL FABRIC INNERDUCT - 4”, 3 CELL, #MX-C-4003-4”-XX
70    MAXCELL FABRIC INNERDUCT - 2”, 3 CELL, #MX-C-2003-2”-XX
71    HANDHOLE, AIRCRAFT RATED, 36“x36“x36” (POWER)
72    HANDHOLE, AIRCRAFT RATED, 36“x36“x36” (COMM)
73    HANDHOLE, VEHICLE RATED, 36“x36“x36” (COMM)
74    MANHOLE, VEHICLE RATED, 7’x7’x’7 - POWER
75    STANDARD MLGW VARIABLE DEPTH PULL BOX, VEHICLE RATED - PRIMARY POWER

 

13


76    STANDARD MLGW TRANSFORMER PAD - PRIMARY POWER
77    HANDHOLE, VEHICLE RATED, 36“x36“x36” (POWER)
78    DUCTBANK, 4x2-4”
79    DUCTBANK, 4x1-4”
80    DUCTBANK, 3x1-4”
81    DUCTBANK, 3x2-4”
82    DUCTBANK, 2x1-4”
83    DUCTBANK, 1x1-4”, 1x1-2”
84    DIRECT BORE 1-4” COMM
85    BORE PIT FOR DIRECTIONAL BORE - IN GRASS AREA
86    BORE PIT FOR DIRECTIONAL BORE - IN ASPHALT AREA
87    15KVA, 3-PHASE, MINI-POWER CENTER W/SPD, INSTALLED
88    GENERATOR AND ATS EQUIPMENT, INSTALLED COMPLETE
89    NEW POLE FOUNDATION,PIPE BOLLARDS FOR LARGE EQUIPMENT AREA, RECEPTACLE, AND ASSOCIATED CONDUIT FOR NEW GATE LEC POLE
90    NEW POLE FOUNDATION, PIPE BOLLARDS FOR SMALL EQUIPMENT AREA, RECEPTACLE, AND ASSOCIATED CONDUIT FOR NEW GATE LEC POLE
91    NEW POLE FOUNDATION, PIPE BOLLARDS, AND ASSOCIATED CONDUIT FOR NEW 80’ BUILDING LEC POLE
92    NEW POLE FOUNDATION, PIPE BOLLARDS AND ASSOCIATED CONDUIT FOR NEW 40’ LEC POLE
93    NEW 80 FT LEC POLE

 

14


94    NEW 40 FT LIGHT POLE
95    CHEMICAL GROUND, TRAFFIC RATED
96    LEC SYSTEM INSPECTION
97    NEW GATE READY LIGHT, INCLUDING SWITCH, WIRE AND CONDUIT
98    PROVIDE AND INSTALL NEW LIGHTNING ELIMINATION ARRAY ON NEW 80’ LEC POLE
99    PROVIDE AND INSTALL NEW LIGHTNING ELIMINATION SPLINE BALL ON NEW 40’ LEC POLE
100    CUTOFF LED LIGHTING FIXTURE (Type as Required)
101    STORM WARNING LIGHT
102    GATE SIGNS – 3 PER POLE
103    FURNISH AND INSTALL NEW L-867 BASE, 10” DEEP IN EXISTING RIGID PAVEMENT
104    FURNISH AND INSTALL NEW L-867 BASE, IN NEW RIGID PAVEMENT
105    FURNISH AND INSTALL NEW L-868 BASE, IN NEW FLEXIBLE PAVEMENT
106    FURNISH AND INSTALL NEW L-868 B 3/4” BLANK COVER
107    FURNISH AND INSTALL NEW L-852C(L) LED FIXTURE, TYPE AND COLOR PER DRAWINGS
108    FURNISH AND INSTALL NEW L-852D(L) LED FIXTURE, TYPE AND COLOR PER DRAWINGS
109    FURNISH AND INSTALL NEW L-861T(L) LED FIXTURE, TYPE AND COLOR PER DRAWINGS
110    FURNISH AND INSTALL NEW TYPE C SINGLE CONDUCTOR #8 AWG, 5KV COPPER WIRE
111    T/W NONMETALLIC CONDUIT CONCRETE ENCASED 2”
112    T/W GRS CONDUIT 1 1/2”, IN 4” x 5” DEEP SAW CUT TRENCH IN RIGID PAVEMENT, COMPLETE
113    UNDERCUT EXCAVATION

 

15


114    UNDERCUT BACKFILL (CR 610) LIMESTONE
115    EMBANKMENT - COMPACTED IN PLACE
116    SUBGRADE PROCESSING
117    NON-WOVEN GEOTEXTILE FABRIC
118    DEWATERING BAG
119    FILTER SOCK (12”)
120    INLET PROTECTION
121    PIPE END PROTECTION
122    SILT FENCE
123    CHECK DAM
124    TEMPORARY SWALE
125    TDOT CLASS ‘B’ RIP-RAP
126    FLOC LOG
127    DEWATERING DEVICE W/ GATE VALVE
128    GRAVEL UNDERDRAIN W/ 4” PERFORATED PIPE
129    UNDERDRAIN CLEANOUT, IN LINE
130    UNDERDRAIN CLEANOUT, END OF LINE
131    NEW CHAIN LINK FENCE (10’ W/ BARBED & RAZOR WIRE)
132    REMOVE AND REPLACE EX. 6’ FENCE (10’ CHAIN LINK FENCE W/ BARBED & RAZOR WIRE)
133    NEW ROLL GATE - 30’ WIDE (10’ W/ BARBED & RAZOR WIRE)
134    BITUMINOUS CONCRETE PAVEMENT (SURFACE COURSE) 2”

 

16


135    BITUMINOUS CONCRETE PAVEMENT (BINDER COURSE) 2”
136    POROUS BITUMINOUS BASE COURSE (4” THICK)
137    PORTLAND CEMENT CONCRETE PAVEMENT (16 1/2” THICK)
138    PORTLAND CEMENT CONCRETE PAVEMENT (18” THICK)
139    CEMENT-TREATED BASE COURSE (8”)
140    CEMENT-TREATED BASE COURSE (10”)
141    CEMENT-TREATED BASE COURSE (14”)
142    BOND BREAKER
143    6-30 CURB AND GUTTER
144    VERTICAL CURB
145    MANHOLE (5’ DIA. - AIRCRAFT RATED)
146    MANHOLE (7’ DIA. - AIRCRAFT RATED)
147    7’x7’ SQUARE MANHOLE
148    6-72 INLET
149    SPECIAL INLET No. 1
150    SPECIAL INLET No. 3
151    SPECIAL INLET No. 4
152    CONCRETE SWALE
153    SLUICE GATE
154    10’x6’ PRECAST BOX CULVERT
155    12’x6’ PRECAST BOX CULVERT

 

17


156    PRECAST JUNCTION BOX
157    VISUAL BARRIER WALL (INCLUDING GUARDRAIL)
158    AIRCRAFT TETHERING SYSTEM
159    TETHER PULL TEST
160    CONCRETE BARRIER RAIL - TYPE III (CONTRACTOR - FURNISHED)
161    LOW-PROFILE BARRICADES (CONTRACTOR - FURNISHED)
162    TRAFFIC CONTROL
163    PAVEMENT PAINTING
164    PIPE BOLLARD RAIL
165    SODDING
166    TOPSOIL (3”)
167    HYDRO-MULCHING
168    TURF REINFORCEMENT MAT
169    LANDSCAPING
170    FIRE DEPARTMENT CONNECTION (SIAMESE), INCLUDING BOLLARDS
171    POST INDICATOR VALVE, INCLUDING BOLLARDS
172    FIRE HYDRANT AND VALVE ASSEMBLY, INCLUDING BOLLARDS
173    DUCTILE IRON PIPE (10”)
174    RELOCATE DUCTILE IRON PIPE (10”)
175    DUCTILE IRON PIPE (6”)
176    DUCTILE IRON PIPE (4”)

 

18


177    WATER LINE (2” - SCHEDULE 40 PVC)
178    2” WATER VALVE
179    6” WATER VALVE
180    10” WATER VALVE
181    6” X 2” REDUCER
182    10” X 6” REDUCER
183    6” TEE AND VALVE
184    10” TEE AND VALVE
185    UTILITY INDENTIFICATION MARKERS
186    8” (SDR-26) SANITARY SEWER (12’-16’ DEEP)
187    10” (SDR-26) SANITARY SEWER (12’-16’ DEEP)
188    12” (SDR-26) SANITARY SEWER (16’-20’ DEEP)
189    18” STEEL CASING
190    20” STEEL CASING
191    4” SANITARY SEWER SERVICE LINE
192    CLEANOUT (SERVICE LINE)
193    4’ DIAMETER SEWER MANHOLE
194    4’ DIAMETER SEWER “DOGHOUSE” MANHOLE
195    AIRCRAFT RATED SEWER MANHOLE EXTENSION
196    REINFORCED CONCRETE PIPE CLASS V (18”)
197    REINFORCED CONCRETE PIPE CLASS V (24”)

 

19


198    REINFORCED CONCRETE PIPE CLASS V (36”)
199    REINFORCED CONCRETE PIPE CLASS V (54”)
200    REINFORCED CONCRETE PIPE CLASS V (60”)
201    SLOTTED DRAIN (18”)
202    SLOTTED DRAIN (24”)
203    SLOTTED DRAIN (30”)
204    SLOTTED DRAIN (36”)
205    DRAIN INLET (4’x4’)
206    24” HEADWALL
207    60” HEADWALL
208    12’x6’ BOX CULVERT HEADWALL
209    GOLDEN TRIANGLE BUILDING, INCLUDING UTILITY CONNECTIONS AND WHEEL STOPS
210    GENERATOR & CANOPY, INCLUDING UTILITY CONNECTIONS

 

20


Exhibit D

Taxiway Area

 

Striped Area consists of 186,915 square feet.

 

21


Exhibit E

 

 

22