Letter Agreement, dated as of March 1, 2019, among RM Partners LP, Equitrans, L.P., Rice Drilling B LLC, EQM Gathering OPCO, LLC and Alpha Shale Resources LP. Specific items in this exhibit have been redacted, as marked by three asterisks
EX-10.5 4 eqm3312019ex105.htm EXHIBIT 10.5 Exhibit
Portions of this Exhibit have been redacted because they are both (i) not material and (ii) would be competitively harmful if publicly disclosed. Information that was omitted has been noted in this document with a placeholder identified by the mark “[***]”.
March 1, 2019
Rice Drilling B LLC
Attn: Erin R. Centofanti, President
EQT Plaza
625 Liberty Avenue, Suite 1700
Pittsburgh, Pennsylvania 15222
EQM Gathering OPCO, LLC
Attn: Paul Kress, Vice President
2200 Energy Drive
Canonsburg, Pennsylvania 15317
Equitrans, L.P.
Attn: Cliff Baker, Senior Vice President
2200 Energy Drive
Canonsburg, Pennsylvania 15317
RE: | Letter Agreement Regarding Connection of Kentor, Carpenter, Shipman and Beazer Well Pads to Jupiter Gathering System |
Dear Sirs and Madam:
This letter (this “Letter Agreement”) will serve to document the agreement reached among RM Partners LP (“RMP”), Equitrans, L.P. (“Equitrans”), Rice Drilling B LLC (“RDB”) and EQM Gathering OPCO, LLC (“EQM”) regarding certain gas subject to dedication under that certain Gas Gathering and Compression Agreement dated December 22, 2014, by among RDB, RMP and Alpha Shale Resources LP, as subsequently amended (the “ASR GGA”), the gathering of such gas on EQM’s Jupiter Gathering System pursuant to that certain Jupiter Gas Gathering Agreement dated May 1, 2014, by and among EQT Production Company, EQT Energy, LLC and EQM (as assignee of EQT Gathering, LLC), as subsequently amended (the “Jupiter GGA”), and the transportation of such gas on Equitrans’ transmission system pursuant to that certain Rate Schedule ITS Agreement dated as of the execution date hereof, as described herein (the “Equitrans TSA”).
1.Explanation. RDB owns and controls gas from four well pads: the Kentor well pad (“Kentor Pad”), the Carpenter well pad (“Carpenter Pad”), the Beazer well pad (“Beazer Pad”), and the Shipman well pad (the “Shipman Pad”, and together with the Kentor Pad, the Carpenter Pad, and the Beazer Pad, (the “RDB Pads”). The gas produced from acreage included in and adjacent to the RDB Pads is subject to, and dedicated under the ASR GGA to a gathering system operated by RMP (the “RMP Gathering System”), pursuant to the terms of the ASR GGA. RMP, RDB, Equitrans, and EQM (collectively, the “Parties”, and each a “Party”) have agreed, notwithstanding the ASR GGA (including, without limitation, the dedication provisions set forth therein), that all such gas produced from acreage included in and adjacent to the RDB Pads dedicated under and pursuant to the ASR GGA to the RMP Gathering System (a) shall be subject to the Jupiter GGA and received into a gathering system operated by EQM and described in the Jupiter GGA (the “Jupiter Gathering System”), and (b) shall be transported on an Equitrans pipeline pursuant to the Equitrans TSA, as more particularly described in the Equitrans TSA, in each case, upon the terms and conditions set forth herein (including, without limitation, Section 4 of this Letter Agreement).
2.Subject Acreage and Subject Dedicated Gas. The Parties agree that, as of the applicable In-Service Date for each of the Kentor, Carpenter, Shipman and Beazer Receipt Points (as such terms are defined and set forth in the Sixth Amendment), all gas produced from (a) certain acreage described in Exhibit A-1, attached hereto and incorporated herein (the “Kentor Acreage”), (b) certain acreage described in Exhibit A-2, attached hereto and incorporated herein (the “Carpenter Acreage”), (c) certain acreage described in Exhibit A-3, attached hereto and incorporated herein (the “Shipman Acreage”), and (d) certain acreage described in Exhibit A-4, attached hereto and incorporated herein (the “Beazer Acreage”, and collectively with the Kentor Acreage, the Carpenter Acreage, and the Shipman Acreage, the “Subject Acreage”, and all gas produced therefrom, the “Subject Dedicated Gas”), shall, notwithstanding the ASR GGA (including, without limitation, the dedication provisions set forth therein) and subject to Section 4 hereof, be solely subject to, and governed and bound by the Jupiter GGA, and the Jupiter GGA shall be deemed controlling in all respects with respect to the Subject Acreage and the Subject Dedicated Gas. With respect to the Subject Acreage and the Subject Dedicated Gas, (x) neither RDB nor RMP shall in any way be deemed to be in breach of, or default under, the ASR GGA or any of the provisions, terms, or conditions thereof, and (y) each of RDB and RMP shall be deemed to have, in all respects, fully satisfied its respective obligations and performed its respective duties under and pursuant to the ASR GGA, in each case, by the provision of services under and pursuant to the Jupiter GGA as described in Section 3 hereof.
3.Services for Subject Dedicated Gas. Notwithstanding the ASR GGA (including, without limitation, the dedication provisions set forth therein) and subject to Section 4 hereof, the Parties acknowledge and agree that the Subject Dedicated Gas shall be gathered into the Jupiter Gathering System by connecting each of the RDB Pads to the Jupiter Gathering System, and all Subject Dedicated Gas shall thereafter be transported on Equitrans’ transmission system, in accordance with the following terms: (a) services for the Subject Dedicated Gas under and pursuant to the Jupiter GGA shall be at a discounted gathering fee of [***] and in accordance with Amendment No. 6 to the Jupiter GGA, a copy of which is attached hereto as Exhibit B and which shall be executed contemporaneously herewith (the “Sixth Amendment”), and (b) services for the Subject Dedicated Gas under and pursuant to the Equitrans TSA shall be at a negotiated rate of [***] and in accordance with the Equitrans TSA, which shall be executed contemporaneously herewith.
4.Services for Certain of the Subject Dedicated Gas. RMP shall connect the Shipman Pad to an interconnect on the RMP Gathering System by [***], and effective as of such date, the Subject Dedicated Gas produced from acreage depicted as “Shipman South” on Exhibit A-3 attached hereto (“Shipman South Gas”) may be gathered into and serviced on the RMP Gathering System when necessary, as mutually agreed upon by the Parties, for high pressure and low pressure services, and, if gathered into and serviced on the RMP Gathering System, fees for such services for such Shipman South Gas shall be invoiced and paid solely pursuant to and in accordance with Section 5.1 of the ASR GGA. Effective [***], the Subject Dedicated Gas produced from acreage depicted as “Beazer South” on Exhibit A-4 attached hereto (“Beazer South Gas”) may, as mutually agreed upon by the Parties, be gathered into and serviced on the RMP Gathering System, and, if gathered into and serviced on the RMP Gathering System, fees for such services for such Beazer South Gas shall be invoiced and paid solely pursuant to and in accordance with Section 5.1 of the ASR GGA.
5.Consideration Sufficient. Each Party acknowledges that the transactions described herein: (a) constitute sufficient consideration to make this Letter Agreement legally binding upon such Party; and (b) without such consideration, such Party would not enter into, as applicable, the Sixth Amendment or the Equitrans TSA.
6.Successors and Assigns; RMP Transfer. This Letter Agreement shall extend to and inure to the benefit of and be binding upon the Parties and their respective successors and assigns. In the event that RMP sells, transfers, conveys, assigns, grants, or otherwise disposes of any or all of its interests in the RMP Gathering System or the ASR GGA, then any such sale, transfer, conveyance, assignment, grant, or other disposition shall be made expressly subject to this Letter Agreement and any instrument of conveyance shall expressly so state.
7.Miscellaneous. The Parties intend that this Letter Agreement will be construed and enforced under Pennsylvania law without the application of any jurisdiction’s conflicts of laws principles. This Letter Agreement, together with the Jupiter GGA and the Equitrans TSA, constitutes the entire agreement among the Parties with respect to such subject matters and supersedes any prior or contemporaneous agreement, whether oral, written or formed by a course of dealing, among the Parties with respect to such subject matters. No amendment to this Letter Agreement will be effective unless it is in writing and signed by each Party. This Letter Agreement may be executed in counterparts, each of which will be as valid as another and all of which together will constitute one and the same agreement. Executed copies of this Letter Agreement will be as valid for all purposes as original versions.
8. Effectiveness. This Letter Agreement, the Sixth Amendment, and the Equitrans TSA shall be executed contemporaneously and this Letter Agreement shall be effective as of such date of execution.
If you agree that this Letter Agreement fully and fairly documents the agreement reached among the Parties with regard to its subject matter, please have a duly authorized representative execute and date the acknowledgement below for the appropriate Party.
[Signed on Next Page]
Very truly yours,
RM Partners LP
By: EQM Midstream Management, LLC its general partner
By: /s/ Paul Kress
Name: Paul Kress
Title: VP
ACKNOWLEDGED AND AGREED:
Rice Drilling B LLC
By: /s/ Erin R. Centofanti
Name: Erin R. Centofanti
Title: President
Equitrans, L.P.
By: /s/ Paul Kress
Name: Paul Kress
Title: VP
EQM Gathering OPCO, LLC
By: /s/ Paul Kress
Name: Paul Kress
Title: VP
Alpha Shale Resources LP, by Alpha Shale Holdings LLC, its sole general partner
By: /s/ Erin R. Centofanti
Name: Erin R. Centofanti
Title: President
Exhibit A-1
[***]
Exhibit A-2
[***]
Exhibit A-3
[***]
Exhibit A-4
[***]
Exhibit B
AMENDMENT NO. 6
TO
JUPITER GAS GATHERING AGREEMENT
TO
JUPITER GAS GATHERING AGREEMENT
This Amendment No. 6 to the Jupiter Gas Gathering Agreement (this “Amendment”) is made and entered into as of March 1, 2019, by and between EQT Production Company (“Producer”) and EQT Energy, LLC (collectively with Producer, “Shipper”), on the one hand, and EQM Gathering OPCO, LLC (“Gatherer”), on the other hand. Producer, Shipper and Gatherer are each referred to herein as a “Party” and collectively as the “Parties”.
WHEREAS, the Parties made and entered into that certain Jupiter Gas Gathering Agreement, the “Agreement”, dated May 1, 2014 (as amended by that certain Amendment No. 1 to Jupiter Gas Gathering Agreement, dated December 17, 2014, that certain Amendment No. 2 to Jupiter Gas Gathering Agreement, dated October 26, 2015, that certain Amendment No. 3 to Jupiter Gas Gathering Agreement, dated August 1, 2016, that certain Amendment No. 4 to Jupiter Gas Gathering Agreement, dated June 1, 2017, and that certain Amendment No. 5 to Jupiter Gas Gathering Agreement, dated October 1, 2017), pursuant to which, among other provisions, Shipper requested that Gatherer provide gathering services to Shipper by receiving quantities of Gas from Shipper at the Receipt Points and redelivering such Gas to or for Shipper’s account at the Delivery Points; and
WHEREAS, the Parties intend to amend Exhibit A, Section II (Table of Incremental Capital Fees) of Exhibit B-2 and Section III (Site Specific Data and Facility Responsibility Matrix) of Exhibit F of the Agreement upon the terms and subject to the conditions set forth herein.
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, and intending to be legally bound, the Parties hereby agree as follows:
1.Definitions. All capitalized terms used but not otherwise defined or amended herein shall have the meanings ascribed to them in the Agreement.
2.Amendments.
a. | As of the date hereof, Rice Drilling B LLC, a Delaware limited liability company (“RDB”), shall be joined to the Agreement as a “Producer” (and, accordingly, a “Shipper”) and deemed a “Producer” (and, accordingly, a “Shipper”) under and subject to the Agreement for all purposes, entitled to all rights and benefits, and responsible for all obligations and liabilities, as “Producer” (and accordingly, as “Shipper”) arising pursuant to the Agreement, but insofar and only to the extent that the same arise out of, relate to, or are associated with RDB’s ownership, operation, or production of Gas delivered to the following Receipt Points: Beazer, Carpenter, Shipman, and Kentor. |
b. | Exhibit A attached to the Agreement is hereby deleted in its entirety and replaced with the revised Exhibit A attached hereto as Attachment 1. |
c. | Section II (Table of Incremental Capital Fees) of Exhibit B-2 attached to the Agreement is hereby deleted in its entirety and replaced with the revised Section II (Table of Incremental Capital Fees) attached hereto as Attachment 2. In accordance with Section 4.2(b) of the Agreement, the Parties have agreed to the Incremental Capital Projects in respect of the Receipt Points identified in Section II of Exhibit B-2. The Parties further agree that: |
i. | these Incremental Capital Projects shall not trigger an increase in the Compression MDQ or the Contract MDQ or an extension of any Term under the Agreement; |
ii. | with respect to the West Run – Hopewell Ridge Receipt Point, the Incremental Capital Fee shall be a negotiated volumetric rate of [***] (in lieu of a Monthly reservation rate) for all Gas delivered by Shipper and received by Gatherer at the West Run – Hopewell Ridge Receipt Point, and with respect to the remainder of the Receipt Points identified in Section II of Exhibit B-2, the Incremental Capital Fee shall be a negotiated volumetric rate of [***] (in lieu of a Monthly reservation rate) for all Gas delivered by Shipper and received by Gatherer at such Receipt Points; and all Receipt Points identified on Section II of Exhibit B-2 shall be disregarded for purposes of and not considered in calculating the Contract MDQ, Compression MDQ or the Overrun Fees under the Agreement; |
iii. | the Incremental Capital Fee shall apply only to Gas delivered to the Receipt Points identified in Section II of Exhibit B-2 beginning on the applicable In-Service Date for each such Receipt Point as set forth in Section II of Exhibit B-2, and thereafter shall apply to such Gas consistent with the Applicable Expansion Term provisions. |
iv. | Except for the West Run – Hopewell Ridge Receipt Point, Gas delivered to the Receipt Points identified in Section II of Exhibit B-2 shall be nominated by Shipper to Delivery Point JPTR-PAPER identified in Exhibit A. Nominations on Equitrans associated with the JPTR-PAPER Delivery Point and physical deliveries shall be reconciled on a monthly basis and any resulting imbalance shall be resolved by Shipper in the subsequent accounting month. No Gas delivered to Receipt Points other than those identified in Section II of Exhibit B-2 (not including the West Run – Hopewell Ridge Receipt Point) shall be nominated by Shipper to Delivery Point JPTR-PAPER. |
v. | Shipper shall not install wellhead or other compression upstream of the West Run – Hopewell Ridge Receipt Point without prior written consent from Gatherer. |
d. | In Section III (Site Specific Data and Facility Responsibility Matrix) of Exhibit F attached to the Agreement: |
i. | the pages including Section III.A.1 (Receipt Point Interconnect Data) are hereby deleted in their entirety and replaced with the revised pages including Section III.A.1 (Receipt Point Interconnect Data) attached hereto as Attachment 3; and |
ii. | Section III.A.2 (Responsibility for Interconnect Facility Equipment) is hereby amended to include the additional Interconnect Facilities responsibilities tables for the meters identified as set forth below, which tables (1) establish the design, construction, operation, maintenance and cost responsibility for each such meter and (2) are attached hereto as Attachment 3. |
###-###-#### ###-###-#### ###-###-####
###-###-#### ###-###-####
3.Effect of Amendment. The Agreement, as amended hereby, shall remain in full force and effect, and all terms hereof are hereby ratified and confirmed by the Parties.
4.Further Actions. The Parties agree to execute such other documents and take such further actions necessary to effectuate this Amendment.
5.Counterparts. This Amendment may be executed in any number of counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same agreement. It is agreed by the Parties that facsimile signature pages signed by the Parties shall be binding to the same extent as original signature pages.
6.Entire Agreement. This Amendment is the entire agreement between the Parties concerning the subject matter hereof and neither Party shall be bound by representations except as set forth in this Amendment.
7.Amendments. This Amendment may not be modified or amended except by a written agreement signed by the Parties.
[The remainder of this page intentionally left blank.]
IN WITNESS WHEREOF, the Parties have executed this Amendment as of the date first written above.
EQT PRODUCTION COMPANY | EQM GATHERING OPCO, LLC |
By: ______________________________ | By: ______________________________ |
Name: ______________________________ | Name: ______________________________ |
Title: ______________________________ | Title: ______________________________ |
EQT ENERGY, LLC | RICE DRILLING B LLC |
By: ______________________________ | By: ______________________________ |
Name: ______________________________ | Name: ______________________________ |
Title: ______________________________ | Title: ______________________________ |
ATTACHMENT 1
EXHIBIT A
RECEIPT POINTS, DELIVERY POINTS,
CONTRACT MDQ AND COMPRESSION MDQ
CONTRACT MDQ AND COMPRESSION MDQ
Receipt Point(s) | Receipt Point MDQ MMcf/Day | Zone | Zone MDQ MMcf/Day |
West Run | 80 | Zone 1 | 300 |
Koloski | 90 | Zone 1 | 300 |
Green Hill | 80 | Zone 1 | 300 |
Pierce | 100 | Zone 1 | 300 |
Walker B | 30 | Zone 1 | 300 |
Moore | 40 | Zone 1 | 300 |
Phillips | 30 | Zone 1 | 300 |
Scotts Run | 30 | Zone 1 | 300 |
Patterson Creek | 60 | Zone 1 | 300 |
Carpenter | 115 | Zone 1 | 300 |
Kentor | 5 | Zone 1 | 300 |
Moninger | 200 | Zone 2 | 370 |
Cooper | 140 | Zone 2 | 370 |
Big Sky | 75 | Zone 2 | 370 |
Harris | 45 | Zone 2 | 370 |
Amity | 15 | Zone 2 | 370 |
Harden Farm | 110 | Zone 2 | 370 |
Connors | 65 | Zone 2 | 370 |
Pettit | 65 | Zone 2 | 370 |
Hughes | 55 | Zone 2 | 370 |
Roberts | 9 | Zone 2 | 370 |
Harden | 25 | Zone 2 | 370 |
Shipman | 37.5 | Zone 2 | 370 |
J&J | 37.5 | Zone 2 | 370 |
Lacko | 150 | Zone 3 | 370 |
Hildebrand | 35 | Zone 3 | 370 |
Pyles | 40 | Zone 3 | 370 |
Beazer | 50 | Zone 3 | 370 |
Yabolnski | 70 | Zone 3 | 370 |
Minor | 60 | Zone 3 | 370 |
Nicoloff | 30 | Zone 3 | 370 |
McMillan | 20 | Zone 3 | 370 |
Robinson | 20 | Zone 3 | 370 |
Thompson | 25 | Zone 3 | 370 |
Thistlewaite | 2 | Zone 3 | 370 |
Alpha | 80 | Zone 3 | 370 |
Strope | 100 | Zone 3 | 370 |
EXHIBIT A (Continued)
RECEIPT POINTS, DELIVERY POINTS,
CONTRACT MDQ AND COMPRESSION MDQ
CONTRACT MDQ AND COMPRESSION MDQ
Delivery Point(s) | Location |
Ingram | Equitrans H-109 |
Amity | Equitrans H-125 |
Jupiter | Equitrans H-148 |
Callisto | Equitrans H-160 |
Hopewell Ridge | Equitrans H-160 |
Pipers Ridge | Equitrans M-78 |
Europa | Equitrans H-165 |
Io | Equitrans H-148 and M-78 |
JPTR-PAPER | N/A |
Drip Liquids Delivery Point(s) | Location |
Not applicable |
Contract MDQ: | [***] |
Compression MDQ: | [***] |
ATTACHMENT 2
II. Table of Incremental Capital Fees
Incremental Capital Project | Contract MDQ | Incremental Capital Fee | In-Service Date | Applicable Expansion Term |
Carpenter | [***] | [***] | [***] | Until [***], and thereafter until terminated by either Party on the last Day of a Month by delivering written notice to the other Party at least thirty (30) Days prior to the date of termination. |
Kentor | [***] | [***] | [***] | Until [***], and thereafter until terminated by either Party on the last Day of a Month by delivering written notice to the other Party at least thirty (30) Days prior to the date of termination. |
Shipman 1 | [***] | [***] | [***] | Until [***], and thereafter until terminated by either Party on the last Day of a Month by delivering written notice to the other Party at least thirty (30) Days prior to the date of termination. |
Beazer 2 | [***] | [***] | [***] | Until [***], and thereafter until terminated by either Party on the last Day of a Month by delivering written notice to the other Party at least thirty (30) Days prior to the date of termination. |
West Run – Hopewell Ridge Receipt Point | [***] | [***] | [***] | Until terminated by either Party on the last Day of a Month by delivering written notice to the other Party at least thirty (30) Days prior to the date of termination. |
1. | Subject, in all respects, to Section 4 of that certain letter agreement dated as of March 1, 2019, by and among RM Partners LP, Rice Drilling B LLC, EQM Gathering OPCO, LLC, and Equitrans, L.P. (the “Letter Agreement”). |
Subject, in all respects, to Section 4 of the Letter Agreement.
ATTACHMENT 3
III. SITE SPECIFIC DATA AND FACILITY RESPONSIBILITY MATRIX
A. | In addition to the minimum design specification and operating parameters set forth in the Engineering and Technical Design Standards, the following specifications shall be followed: |
1. | Receipt Point Interconnect Data: The table below provides for the list of meters covered under this Agreement which may be updated from time to time in accordance with the terms and conditions of this Agreement. Each meter in the Receipt Point Interconnect table shall conform to the specifications listed in the table applicable to such meter under Section III(A)(2). |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
17019 | Cooper B | 39.95597, -80.26908 | 720 | 1,220 | 78,500 |
11798 | Roberts 1 | 39.94097, -80.326422 | 720 | 320 | 19,600 |
17018 | Roberts 2 | 39.94097, -80.25422 | 720 | 320 | 19,600 |
11796 | McMillen | 39.9836, -80.1209 | 720 | 710 | 45,900 |
###-###-#### | McMillen 2 MM - 1 | 39.98455, -80.11803 | 1400 | 2,100 | 51,433 |
###-###-#### | McMillen 2 MM - 2 | 39.98455, -80.11803 | 1400 | 2,100 | 51,433 |
###-###-#### | McMillen 2 MM - 3 | 39.98455, -80.11803 | 1400 | 2,100 | 51,433 |
17042 | Pyles 1 | 39.969918, -80.110996 | 1,440 | 1,670 | 78,500 |
###-###-#### | Pyles 2 | 39.96643, -80.1116 | 1440 | 1,227 | 64,353 |
17035 | Hildebrand | 39.974133, -80.096991 | 720 | 650 | 45,900 |
17022 | Robison 1 | 39.979817, -80.072114 | 720 | 680 | 45,900 |
18156 | Robison 2 | 39.97799, -80.07021 | 720 | 720 | 45,900 |
17043 | Thompson 1 | 39.948602, -80.096748 | 720 | 680 | 45,900 |
17115 | Thompson 2 | 39.948602, -80.096748 | 720 | 680 | 45,900 |
11797 | Thistlewaite | 39.96395, -80.100731 | 720 | 320 | 19,600 |
17044 | Conner 1 | 39.946228, -80.240644 | 720 | 680 | 45,900 |
5100003 | Conner 2 | 39.946228, -80.240644 | 720 | 680 | 45,900 |
17037 | Phillips | 39.933614, -80.293665 | 1,400 | 1,150 | 115,300 |
18155 | Walker B | 39.934471, -80.318565 | 1,400 | 1,600 | 67,500 |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
5100014 | Scott’s Run 1 | 39.93239, -80.32793 | 1,400 | 2,700 | 115,300 |
5100015 | Scott’s Run 2 | 39.93239, -80.32793 | 1,400 | 2,700 | 115,300 |
###-###-#### | Scott's Run 3 | 39.93237, -80.32812 | 1,400 | 1,227 | 64,353 |
5100065 | Moore MM B Run | 39.92772, -80.33715 | 1,400 | 2,700 | 115,300 |
###-###-#### | Moore MM Run 2 | 39.92763, -80.33740 | 1440 | 1,150 | 28,800 |
5100039 | West Run (NIJUS25) | 39.913752, -80.303533 | 1,400 | 2,700 | 115,300 |
5100053 | West Run – Hopewell Ridge | 39.91312, -80.30316 | 1,400 | 2,511 | 87,994 |
5100055 | Patterson 1 | 39.936506 , -80.310759 | 1,400 | 2,700 | 115,300 |
5100063 | Patterson 2 | 39.936506 , -80.310759 | 1,400 | 2,700 | 115,300 |
5100057 | Nicoloff 1 | 39.954037, -80.065039 | 720 | 720 | 45,900 |
###-###-#### | Nicoloff 2 | 39.954037, -80.065039 | 720 | 1,227 | 44,838 |
5100019 | Pierce 2 | 39.90734, -80.28209 | 720 | 2,630 | 78,500 |
5100064 | Pierce 3 | 39.90734, -80.28209 | 720 | 2,630 | 45,900 |
###-###-#### | Pierce MM D Run | 39.90734, -80.28209 | 720 | 2,630 | 78,500 |
###-###-#### | Big Sky 1 | 39.99805556,-80.20277 | 720 | 1,750 | 78,500 |
###-###-#### | Big Sky 2 | 39.99805556, -80.20277 | 720 | 1,750 | 78,500 |
###-###-#### | Big Sky 3 | 39.99805556, -80.20277 | 720 | 1,030 | 45,900 |
###-###-#### | Petit 1 | 39.94523, -80.23994 | 720 | 1,227 | 44,838 |
###-###-#### | Petit 2 | 39.94523, -80.23994 | 720 | 1,227 | 44,838 |
###-###-#### | Petit 3 | 39.94523, -80.23994 | 720 | 726 | 26,240 |
###-###-#### | Petit 4 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
###-###-#### | Petit 5 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
###-###-#### | Petit 6 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
###-###-#### | Petit 7 | 39.94684, -80.24028 | 1,440 | 1,227 | 64,353 |
###-###-#### | Alpha 1 | 39.960097, -80.130604 | 720 | 1,227 | 44,838 |
###-###-#### | Alpha 2 | 39.960097, -80.130604 | 720 | 1,227 | 44,838 |
###-###-#### | Alpha 3 | 39.960097, -80.130604 | 720 | 1,950 | 35,500 |
###-###-#### | Moninger Run 1 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
###-###-#### | Moninger Run 2 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
###-###-#### | Moninger Run 3 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
###-###-#### | Moninger Run 4 | 39.99511, -80.20636 | 1,440 | 1,227 | 64,353 |
###-###-#### | Koloski Run 1 | 39.95875, -80.31068 | 1,440 | 1,227 | 64,353 |
###-###-#### | Koloski Run 2 | 39.95875, -80.31068 | 1,440 | 1,227 | 64,353 |
###-###-#### | Koloski Run 3 | 39.95875, -80.31068 | 1,440 | 1,227 | 64,353 |
17020 | Iames | 40.0308, -80.15266 | 720 | 726 | 37,660 |
###-###-#### | Shipman 1 | 39.991551, -80.194235 | 720 | 726 | 37,660 |
###-###-#### | Shipman 2 | 39.991551, -80.194235 | 720 | 1,227 | 64,353 |
###-###-#### | Shipman Gathering MM - Run 3 | 39.991551, -80.194235 | 720 | 1,950 | 35,500 |
33297 | Ingram 590004 | 39.93929, -80.26466 | 720 | 356 | 16,118 |
33341 | ROG46H1 | 39.94097, -80.26422 | 720 | 356 | 16,118 |
###-###-#### | Lacko 1 | 39.968683, -80.150911 | 720 | 1,227 | 64,353 |
###-###-#### | Lacko 2 | 39.968683, -80.150911 | 720 | 1,227 | 64,353 |
###-###-#### | Lacko 3 | 39.968683, -80.150911 | 720 | 1,227 | 64,353 |
###-###-#### | Yablonski 1 | 39.99347, -80.06271 | 1440 | 1,227 | 64,353 |
###-###-#### | Yablonski 2 | 39.99347, -80.06271 | 1440 | 1,227 | 64,353 |
###-###-#### | Beazer 1 | 39.92417, -80.10866 | 1440 | 1,227 | 64,353 |
###-###-#### | Beazer 2 | 39.92417, -80.10866 | 1440 | 1,227 | 64,353 |
###-###-#### | Beazer 3 | 39.92417, -80.10866 | 1440 | 1,556 | 57,163 |
###-###-#### | J & J | 39.99807, -80.20293 | 1440 | 1,556 | 57,163 |
###-###-#### | J & J | 39.99807, -80.20293 | 1440 | 1,556 | 57,163 |
###-###-#### | J & J | 39.99807, -80.20293 | 1440 | 1,556 | 57,163 |
###-###-#### | Harden Farm 1 | 39.939969, -80.264877 | 1440 | 1,556 | 57,163 |
###-###-#### | Harden Farm 2 | 39.939969, -80.264877 | 1440 | 1,556 | 57,163 |
###-###-#### | Harden Farm 3 | 39.939969, -80.264877 | 1440 | 1,556 | 57,163 |
Meter ID | Meter Name | GPS Coordinates | MAOP | MinDQ* (Mcf / Day) | MaxDQ (Mcf / Day) |
###-###-#### | Green Hill - Meter 1 | 39.89708, -80.31778 | 1400 | 2,100 | 31,750 |
###-###-#### | Green Hill - Meter 2 | 39.89708, -80.31778 | 1400 | 2,100 | 31,750 |
###-###-#### | Green Hill - Meter 3 | 39.89708, -80.31778 | 1400 | 2,100 | 31,750 |
###-###-#### | Harris | 39.95349, -80.19008 | 720 | 1,800 | 49,000 |
###-###-#### | Harris Run B | 39.95349, -80.19008 | 720 | 1,800 | 49,000 |
###-###-#### | EPC Carpenter MM Run A | 39.8864, -80.3359 | 1400 | 1,800 | 49,000 |
###-###-#### | EPC Carpenter MM Run B | 39.8864, -80.3359 | 1400 | 1,800 | 49,000 |
###-###-#### | EPC Carpenter MM Run C | 39.8864, -80.3359 | 1400 | 1,800 | 49,000 |
###-###-#### | Kentor | 39.877229, -80.307607 | 1400 | 200 | 6,500 |
* Calculated @ minimum NOP with minimum Beta plate when applicable
2. | Responsibility for Interconnect Facility Equipment. Each of the following tables establish, for the meter specified in the cell located in the first row of the first column of such table (or, if no meter is specified in such cell, then for each meter not specified in any of the other tables included below) the design, construction, operation, maintenance and cost responsibility for certain aspects of the Interconnect Facilities. All of the following design responsibilities designated as Producer’s responsibility shall be incorporated into the design and construction of the Interconnect Facilities. |
Pierce 2, 5100019 Pierce 3, 5100064 Pierce MM D Run, ###-###-#### STATION EQUIPMENT | REQUIRED | DESIGN | INSTALL | OWNERSHIP | OPERATE | MAINTAIN | SPECIAL PROVISIONS/ EQUIPMENT SPECS. |
PIPING | |||||||
Pipeline-Tap & Valve | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | 12” Tee |
Inlet & Station Piping | Yes | Producer | Producer | Producer | Producer | Producer | |
Outlet & Station Piping | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 12” |
Test Station - inlet piping | Yes | Producer | Producer | Producer | Producer | Producer | |
Test Station - outlet piping | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | |
Corrosion coupon | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | |
GAS CONDITIONING | |||||||
Filter Separator | Yes | Gatherer | Producer | Producer | Producer | Producer | Shawndra Filter |
Liquid Level Shutoff | No | 16” Barrel | |||||
MEASUREMENT | |||||||
Meter & Meter Runs | Yes | Gatherer | Producer | Producer | Gatherer | Producer | (2) 8” Orifice, (1) 6” Orifice |
Meter & Flow Control Risers, Valves, etc… | Yes | Gatherer | Producer | Producer | Gatherer | Producer | |
Electronic Measurement & Telecom Hardware | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Eagle/1 RTU (ea meter) and Eagle /5 RTU per interconnect |
GAS QUALITY | |||||||
Chromatograph | No | ||||||
Continuous Sampler | No | ||||||
H2O Dew Point Analyzer | No | ||||||
Oxygen Analyzer | No | Gatherer | Producer | Producer | Gatherer | Producer | |
H2S Monitor | No | Gatherer | Producer | Producer | Gatherer | Producer | |
PRESSURE / FLOW CONTROL | |||||||
Primary Pressure Control | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 2X 6” CV/OPP + 1X4” CV/OPP |
Overpressure Device | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 2X 6” OPP + 1X4” OPP |
Station Isolation Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 12” |
Flow Control Valve | Yes | Gatherer | Producer | Producer | Gatherer | Producer | 2X 6” + 1X4” CV (same devices as the top) |
Heat | No | Gatherer | Producer | Producer | Producer | Producer | |
Check Valve | Yes | Gatherer | Producer | Producer | Producer | Producer | 2 X 8” + 1X6” |
ODORIZATION | |||||||
Odorizer & Controls | No | Gatherer | Producer | Producer | Gatherer | Producer | |
MISCELLANEOUS | |||||||
Communication service | Yes | Gatherer | Gatherer | Gatherer | Gatherer | Gatherer | EQT Spec |
Electrical Service | Yes | Gatherer | Producer | Producer | Gatherer | Producer | Solar |
Building - Gas Chromatograph | No | ||||||
Building - Odorizer | No | Gatherer | Producer | Producer | Gatherer | Producer | |
Fence/Vehicle Barrier/Signage | Yes | Gatherer | Producer | Producer | Gatherer | Producer | |
Air Permit | TBD | Producer | Producer | Producer | Producer | Producer |
EXHIBIT F (Section III.A.2.)
Responsibility for Interconnect Facility Equipment
EPC Carpenter MM Run A, ###-###-#### EPC Carpenter MM Run B, ###-###-#### EPC Carpenter MM Run C, ###-###-#### STATION EQUIPMENT | REQUIRED | DESIGN SPECIFICATIONS | INSTALL | OWNERSHIP | OPERATE | MAINTAIN |
PIPING | ||||||
Company Pipeline Tap & Valve | Yes | Company | Company | Company | Company | Company |
Inlet Piping | Yes | Customer | Customer | Customer | Customer | Customer |
Station & Outlet Piping | Yes | Company | Customer | Customer | Company | Customer |
Cathodic Protection - Inlet, Station, & Outlet Piping | Yes | Customer | Customer | Customer | Customer | Customer |
Cathodic Protection - Company Tap & Valve | Yes | Company | Company | Company | Company | Company |
GAS CONDITIONING | ||||||
Filter Separator | Yes | Company | Customer | Customer | Customer | Customer |
Particulate Filter | No | |||||
Liquid Level Shutoff | No | |||||
MEASUREMENT | ||||||
Meter & Meter Runs | Yes | Company | Customer | Customer | Company | Customer |
Meter & Flow Control Risers, Valves, etc… | Yes | Company | Customer | Customer | Company | Customer |
Electronic Measurement & Telecomm Hardware | Yes | Company | Customer | Customer | Company | Customer |
GAS QUALITY | ||||||
Chromatograph | No | |||||
Moisture Analyzer | No | |||||
Oxygen Analyzer | No | |||||
Hydrogen Sulfide Analyzer | No | |||||
PRESSURE / FLOW CONTROL | ||||||
Overpressure Protection Device | Yes | Company | Customer | Customer | Company | Customer |
Primary Pressure Control | No | |||||
Flow Control | No | |||||
Remote Shutoff Valve | No | |||||
Heater | No | |||||
Check Valve | Yes | Company | Customer | Customer | Company | Customer |
ODORIZATION | ||||||
Odorizer & Controls | No | |||||
MISCELLANEOUS | ||||||
Communication Service(s) | Yes | Company | Customer | Customer | Company | Customer |
Electrical Service | Yes | Company | Customer | Customer | Company | Customer |
Building - Gas Chromatograph | No | |||||
Building / Enclosure - Odorizer | No | |||||
Fence/Vehicle Barrier/Signage | Yes | Company | Customer | Customer | Company | Customer |
Kentor, ###-###-#### STATION EQUIPMENT | REQUIRED | DESIGN SPECIFICATIONS | INSTALL | OWNERSHIP | OPERATE | MAINTAIN |
PIPING | ||||||
Company Pipeline Tap & Valve | Yes | Company | Company | Company | Company | Company |
Inlet Piping | Yes | Customer | Customer | Customer | Customer | Customer |
Station & Outlet Piping | Yes | Company | Company | Company | Company | Company |
Cathodic Protection - Station, & Outlet Piping | Yes | Company | Company | Company | Company | Company |
Cathodic Protection - Company Tap & Valve | Yes | Company | Company | Company | Company | Company |
GAS CONDITIONING | ||||||
Filter Separator | Yes | Company | Company | Company | Company | Company |
Particulate Filter | No | |||||
Liquid Level Shutoff | No | |||||
MEASUREMENT | ||||||
Meter & Meter Runs | Yes | Company | Company | Company | Company | Company |
Meter & Flow Control Risers, Valves, etc… | Yes | Company | Company | Company | Company | Company |
Electronic Measurement & Telecomm Hardware | Yes | Company | Company | Company | Company | Company |
GAS QUALITY | ||||||
Chromatograph | No | |||||
Moisture Analyzer | No | |||||
Oxygen Analyzer | No | |||||
Hydrogen Sulfide Analyzer | No | |||||
PRESSURE / FLOW CONTROL | ||||||
Overpressure Protection Device | Yes | Company | Company | Company | Company | Company |
Primary Pressure Control | No | |||||
Flow Control | No | |||||
Remote Shutoff Valve | Yes | Company | Company | Company | Company | Company |
Heater | No | |||||
Check Valve | Yes | Company | Company | Company | Company | Company |
ODORIZATION | ||||||
Odorizer & Controls | No | |||||
MISCELLANEOUS | ||||||
Communication Service(s) | Yes | Company | Company | Company | Company | Company |
Electrical Service | Yes | Company | Company | Company | Company | Company |
Building - Gas Chromatograph | No | |||||
Building / Enclosure - Odorizer | No | |||||
Fence/Vehicle Barrier/Signage | Yes | Company | Company | Company | Company | Company |