Bench Test Reaffirmation Letter for CSRV Engine between Coates International, Ltd. and Well to Wire Energy Inc.
Contract Categories:
Business Operations
›
Development Agreements
Summary
This letter agreement confirms that Well to Wire Energy Inc., represented by its President Bryan Campbell, has reaffirmed the results of bench testing conducted on Coates International, Ltd.'s CSRV natural gas engine. The engine demonstrated significantly lower energy use compared to alternatives. Well to Wire plans to use these engines in its future power generation systems and requests shipment of at least two units within two to three weeks to begin fulfilling orders. The agreement supports Well to Wire's five-year business plan and outlines the successful test results and anticipated delivery timeline.
EX-10.1 2 ex101.htm EXHIBIT 10.1 ex101.htm
Exhibit 10.1

Nov 10, 07
Coates International, Ltd.
2100 Highway 34 & Ridgewood Road,
Wall Township, N.J. 07719-9736
Attn: George Coates
Dear George:
This letter is to confirm the reaffirmation of the bench testing that was conducted by myself and by our Business Development Manager, Mr. Leo Perry within the Coates International, Ltd's headquarters at Wall Township, New Jersey on the 855 cubic inch CSRV engine. It should be noted that the energy use was measured at 27.5 to 30.4% less than what we presently experience with alternate engines. The CSRV Natural Gas fired engine will be used by Well To Wire in all of our future electrical power generation systems.
I am extremely satisfied with the smoothness, the flawless operation, the very low energy use and the initial power output. We are eagerly looking forward to you being able to ship at least two of these power plants within the next two to three weeks, as we would like to start filling orders within the next three months. With these successful results, our five-year business plan will now proceed forward.
Best of Regards,
Sincerely,
/s/ Bryan Cambell
Bryan Campbell, P. Eng.,
President,
Well to Wire Energy Inc.
017, 1700 Varsity Estates Drive NW
Calgary Alberta TM ZW9
Tel: (403 ###-###-#### Fax: (403 ###-###-####
1
10-Nov-07 ATTACHMENT #1
MEASURED BENCH TEST PERFORMANCE of the
855 in3, In-Line, 4 Cycle CSRV NATURAL GAS ENGINE
| SIZE | ENGINE SPEED | #Of GANGED | POWER OUTPUT | NATURAL GAS USE | ENERGY USE | |
ENGINE MAKE | (in3) | (rpm) | ENGINES | (kw/h) | (scfpd) | (btu/kw) | (%Improvement) |
Flied Measured Major Supplier** | 496 | 1,815 | 1 | 75 | 27,000 | 14,260 | 0.00% |
Coates*** | 855 10-Nov-07 | 1,700 | 1 | 115 | 28,800 | 10,330 | 27.51% |
**where the Lower Heating Value (LHV) of the sweet Natural Gas= 950 btu/scf
*** where the Lower Heating Value (LHV) of the sweet Natural Gas= 990 btu/scf
| ||
![]() | 017, 1700 Varsity Estates Drive NW Calgary Alberta TM ZW9 Tel: (403 ###-###-#### Fax: (403 ###-###-#### | |
|
2