Estimate Agreement between Capstone Engineered Solutions Corporation and Capstone Green Energy Corporation for Rental System Installation Services

Summary

Capstone Engineered Solutions Corporation provided an estimate to Capstone Green Energy Corporation for the installation of a rental system at the Van Nuys, CA location. The agreement outlines specific installation services, including travel, equipment setup, gas piping, power cables, control systems, and commissioning of units for a 3MW operation. The total estimated cost is $160,475, with a $20,000 deposit required to start and the balance due upon completion. The estimate is valid from April 26, 2022, until May 15, 2022.

EX-10.30 5 cgrn-20220331xex10d30.htm EX-10.30

Exhibit 10.30

Capstone Engineered Solutions Corporation

27812 Pollensa

M ission Viejo, CA 92692 US

jdcrouse@m e.com

Estimate

ADDRESS

Capstone Green Energy Corporation

16640 Stagg St

Van Nuys, CA 91406

ESTIMATE 1002

DATE 04/26/2022

EXPIRATION DATE 05/15/2022

DATE

SERVICE

DESCRIPTION

QTY

RATE

AMOUNT

04/26/2022

Rental System Installation

Travel and Per Diem

1

5,500.00

5,500.00

04/27/2022

Rental System Installation

Receive and set units in place, install air inlet hoods and shipped loose hardware

3

2,500.00

7,500.00

04/29/2022

Rental System Installation

Supply and install HDPE gas piping and shutoff valves for each C1000 and blind flange for expansion

1

62,500.00

62,500.00

04/29/2022

Rental System Installation

Install CGE supplied power cables and cable tray to each C1000 and mining box. Installation hardware supplied by CESC

1

49,530.00

49,530.00

05/03/2022

Rental System Installation

Install CGE supplied gas filter and regulator skid

1

5,275.00

5,275.00

05/03/2022

Rental System Installation

Supply and install control cable conduits to each C1000

1

16,800.00

16,800.00

05/04/2022

Rental System Installation

Install CGE supplied PC for remote communications

1

3,450.00

3,450.00

05/05/2022

Rental System Installation

Modify C1000 for flatpac control scheme, program unit Unit #1 C1K control for master operation

1

5,420.00

5,420.00

05/06/2022

Rental System Installation

Commission units for 3MW standalone operation

1

4,500.00

4,500.00

$20,000.00 Deposit to start

Balance due at com pletion

TOTAL $160,475.00