SUPPLY CONTRACT

EX-10.40 2 a06-1278_1ex10d40.htm MATERIAL CONTRACTS

Exhibit 10.40

 

SUPPLY CONTRACT

 

Advanced Power Technology intends to secure silicon wafers for the manufacture of power switch devices. Siltronic Corporation manufactures silicon wafers and intends to supply this material. Set forth is the “Silicon Supply Agreement” between Advanced Power Technology (APT) located in Bend, OR and Siltronic Corporation (SCO) located in Portland, OR.

 

1.0 Term of Agreement

 

1.1 Twelve (12) month agreement commencing on January 1, 2006 and expiring on December 31, 2006.

 

1.2 Renegotiating discussions will commence one month before contract expiration; extension period to be agreed upon.

 

1.3 Cause for early termination of this agreement would be for non-performance by SCO and/or APT, including but not limiting non-payment by APT.

 

2.0 Volume – [ * ].

 

3.0 Pricing

 

3.1 Pricing is set forth in attachment #1.

 

3.2 Where possible, SCO will “help” keep APT competitive in both price and technology through cost reduction programs and technology improvements.

 

4.0 Payment and Freight Terms

 

4.1 Net [ * ] days from date of SCO invoice. Currency in US dollars.

 

4.2 F.O.B. Siltronic Corporation, Portland, OR, freight collect. Freight carrier as specified by APT.

 

4.3 Freight costs for expedited shipments, if requested by APT, will be the responsibility of APT. SCO will incur all expedited freight costs for late shipments caused by SCO. Substrate Buffer Stock.

 


[ * ] =  CONFIDENTIAL TREATMENT REQUESTED

 



 

5.0 Substrate Buffer Stock

 

5.1 For AMT reactor material:

 

5.1.1 SCO agrees to maintain a three week inventory equivalent to APT’s consumption of one common substrate. This substrate inventory will be maintained in Portland.

 

5.1.2 SCO agrees to replenish the Substrate Buffer Stock within four weeks.

 

5.2 For GIll reactor material:

 

5.2.1 SCO will not maintain a buffer stock. Material will be built and shipped on a quarterly basis. Material ordered outside of the quarterly forecast will be built on substrate as available. All GIll orders must be submitted at one time to allow allotment of reactor resources.

 

6.0 Lead-time

 

6.1 For AMT reactor material:

 

6.1.1    SCO will commit to a three-week lead-time provided the forecast is not in- creased more than [ * ] in the same lead-time period and that it is a current product. Lead-time for non-regular material is 4-6 weeks after specification has been accepted.

 

6.1.2 APT agrees to give SCO a five week “rolling forecast”. The first and second week will be firm, which means no cancellations, reductions, or push-outs are allowed Clarification: The week the updated forecast is submitted is considered week zero, and the schedules in this week are already considered completed and in shipping or in transit. Open schedules during the next two weeks, first and second week, are considered firm.

 

6.1.3 APT agrees to give SCO an additional eight week visibility beyond the five week “rolling forecast” after planning meeting once a quarter.

 

6.1.4 Releases for weeks one through five will be by product and for weeks six through thirteen, it will be by total only.

 


[ * ] =  CONFIDENTIAL TREATMENT REQUESTED

 

2



 

6.2 For GIll material:

 

6.2.1 APT agrees to provide SCO with orders blocked in three month increments.

 

6.2.2 SCO will commit to a six-week leadtime.

 

6.2.3 APT agrees that any additional material requested beyond the three month block order will either be at the higher rate as stated in attachment #1 or the entire next quarter’s forecast can be requested (with a six-week leadtime).

 

6.3 Minimum order quantities for all schedules (including engineering orders) will be in in- crements of [ * ] wafers or more.

 

7.0 Quality

 

7.1 SCO warrants that their products, at the time of delivery, are in compliance with approved APT specifications as agreed by both parties.

 

8.0 Engineering Services

 

8.1 A determination of cost benefit, if any, and ownership will be agreed upon prior to any new activities in the “Reduction of SCO Production Cost” project.

 

8.2 SCO agrees to support engineering work involved with new products and work to meet the stringent specification requirements of those and current products.

 

9.0 Confidentiality

 

9.1 APT and SCO agree to maintain such information in confidence and to take the necessary measures to prevent complete or partial disclosure to third parties. Disclosure of any confidential information shall not be precluded if such disclosure is in response to a valid request from the SEC.

 

10.0 Force Majeure

 

10.1   Pertaining to Force Majeure, APT and/or SCO shall promptly notify the other party and shall use its best efforts to minimize the consequences. For the duration and to the extent of Force Majeure the parties will be released from their obligations.

 


[ * ] =  CONFIDENTIAL TREATMENT REQUESTED

 

3



 

11.0 Indemnification

 

11.1   SCO’s obligation to payment of damages, for whatever reason, shall be limited to the invoice value of the wafers directly having caused those damages.

 

12.0 Sole Agreement

 

12.1   This Supply Agreement including all attachments referenced herein, shall be the complete agreement of both APT and SCO and shall supersede all prior agreements and understanding, oral or written, between the parties respecting the subject matter hereof. Any amendments to this Agreement shall be implemented by written amendment signed by authorized representatives of APT and SCO.

 

IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date first above written, accepted and agreed:

 

SILTRONlC CORPORATION

ADVANCED POWER TECHNOLOGY

 

 

 

 

By:

/s/ DAVID ADELMAN

 

By:

/s/ MARK GABLER

 

 

 

Title: Sales Director

Title: Director of QA & Assembly/Test Ops

 

 

 

 

Date: 12/13/05

Date: 12/30/05

 


[ * ] =  CONFIDENTIAL TREATMENT REQUESTED

 

4



 

Attachment #1

 

4 Inch

 

Pricing for AMT parts and GIll parts (GIll parts ordered on a 3 month basis)

 

Part

 

220-1010

 

220-1020

 

220-1030

 

220-1040

 

220-1050
220-1051

 

220-1060
220-1063

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 ‘06 – 12 ‘06
Price

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

 

Part

 

220-1080

 

220-1100
1000V

 

220-1106
1000V

 

220-1120
1200V

 

220-1126

 

 

 

 

 

 

 

 

 

 

 

 

 

1 ‘06 – 12 ‘06
Price

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

 

Pricing for GIll parts not ordered on Quarterly basis

 

Part

 

220-1100
1000V

 

220-1106
1000V

 

220-1120
1200V

 

220-1126

 

 

 

 

 

 

 

 

 

 

 

1 ‘06 – 12 ‘06
Price

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

 


[ * ] =  CONFIDENTIAL TREATMENT REQUESTED

 

5



 

6 lnch

 

Part

 

220-1053
500 V Mosfet

 

220-1069
600 V Mosfet

 

220-1082
800 V Mosfet

 

220-1111
1000 V Mosfet

 

220-1122
1200 V Mosfet

 

 

 

 

 

 

 

 

 

 

 

 

 

1 ‘06 – 12 ‘06
Price

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

[ * ]

 

 

Part

 

220-1068
600 V IGBT

 

220-1094
900 V IGBT

 

 

 

 

 

 

 

1 ‘06 – 12 ‘06
Price

 

[ * ]

 

[ * ]

 

 

Notes: Parts listed have been ordered since 01/01/05. All other parts not listed receive a [ * ] price increase based on the last reorder schedule.

 

New/ENG orders to be quoted. Minimum order quantity is [ * ] wafers or more.

 


[ * ] =  CONFIDENTIAL TREATMENT REQUESTED

 

6